Forwards SER Accepting Proposed Alternate Emergency Operations Facility Location
ML20236K507
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/29/1998
From: Hansen A
NRC (Affiliation Not Assigned)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20236K508 List:
References
RTR-NUREG-0696, RTR-NUREG-0737, RTR-NUREG-696, RTR-NUREG-737 50-346-96-11, TAC-M98706, NUDOCS 9807090352
Download: ML20236K507 (5)


Text

- - - - - . - _ - - - - - - - - - - - - - - -- - - - - - - - - - -

I 4%

% UNITED STATES -

f. j NUCLEAR REEULATORY COMMISSION Mi%

(

l g WASHINGTON. D.C. == =1 g{'kV

?

June 29, 1998 ,

l l

Mr. John K. Wood i Vice President - Nuclear, Davis-Besse I Centerior Service Company l c/o Toledo Edison Company l Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760 '

SUBJECT:

SAFETY EVALUATION FOR PROPOSED ALTERNATE ENERGENCY OPERATIONS FACILITY LOCATION - DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 (TAC NO. M98706)

Dear Mr. Woods l

During a November 1996 emergency preparedness inspection at the Davis-Besse Nuclear Power Station, Unit No, 1 (see Inspection Report 50-346/96-11 dated January 5,1997), the NRC detarmined that Toleda Edison Company, Centerior Service Company, and The Cleveland Electric Illuminating Company, the licensees for Davis-Besse, had deviated from a comitment to provide a backup emergency operations facility (EOF) for the site. In a letter dated February 21,1997,- as part of its corrective actions, the licensees proposed to either establish a backup E0F meeting the requirements of Supplement 1 to NUREG-0737 or submit a request to the NRC to allow the use of an alternate location (alternate EOF) in lieu of a backup E0F. By letter dated May 1, 1997, as supplemented and amended by letters cated July 21, 1997, and April 14, 1998, and by facsimile dated March 10, 1998, you submitted a request to the NRC for approval of an alternate EOF location.

The staff has completed the review of the proposed alternate E0F and has determined that it meets the Commission guidance to the staff for alternate E0Fs as outlined in the NRC memorandum from S. Chilk to W. Dircks, "SECY-81-509 - NUREG-0696 Criteria for Emergency Operations Facilities for /

Nuclear Power Reactors," dated September 30, 1981. Therefore, the staff has conclud?d that the requested exception from the EOF location criteria provided in NUREG-0737, Supplement 1, is acceptable. Details of the evaluation are /

contained in the attached safety evaluation.

Your letter of April 14, 1998, indicates that you have discussed the use of /

the alternate EOF with the State and local officials within the plume exposure emergency planning zone. You are encouraged to coordinate with these officials to discuss the potential need to update their emergency plans due to the use of the altern&te E0F.

9807090352 900629 PDR ADOCK O$000346 hh h  ; h

'g 6 J. Wood June 29, 1998 Please contact me if you have any questions regarding this matter. I can be reached at (301) 415-1390.

Sincerely, Original signed by:

Allen G. Hansen, Project Manager >

Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation i Docket No. 50-346 1

Enclosure:

As stated l 1

cc w/ encl: See next page Distribution w/en,cln j Docket Filo GHill (2)

PUBLIC WBeckner PD3-3 Reading ACRS EGA1 OGC GGrant, RIII RBellamy 1 J0'Brien THarris (TLH3, SE only) 1 SCampbell, RIII DOCUMENT NAME: G:\DAVISBES\DB98706.LTR .

T. ,.c*.

. .. m occ..m. me. m m. w.: c . cm q,.i =w. r . em n m., w . so em j OFFICE PD33-LAl& PD33-PM 6 OGC, - 1 NAME E8arnhilF/) AHanser412 f) #"

DATE l (, //3/98~ [ /K/W L /1\/98 i i

i i

z______ _ _ _ . _ _ __ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ . _ . _ _ _

J. Wood June 29, 1998 s .-

Please contact me if you have any questions regarding this matter. I can be reached at (301) 415-1390. .

]

Sincerely, Original signed by:

Allen G. Hansen, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

' Docket No. 50-346

Enclosure:

As stated cc w/ encl: See next page Distribution w/encls:

Docket File GHill (2)

.PUBLIC WBeckner LPD3-3 Reading ACRS EGA1 OGC GGrant, RIII RBellamy J0'Brien THarris (TLH3, SE only)  !

SCampbell, RIII ,

l DOCUMENT NAME: G:\DAVISBES\DB98706.LTR To retswe a copy of ins documem, indicare m sne bon: "C* = Copy w:ttout enclenwee *E* e Copy with enclosures "N* = No copy 0FFICE PD33-LA-If PD33-PM d 0GC, t, ,

NAME EBarnhilFh AHanserdif Vi W"  !

DATE 6//ft/98~ /, /K/W

(,/li/98 e

y o

l L. '

J. Wood )

l Please contact me if you have any questions regarding this matter. I can be j reached at (301) 415-1390.

Sincerely, Allen G. Hansen, Project Manager ,

Project Directorate III-3 {

Division of Reactor Projects III/IV  ;

Office of Nuclear Reactor Regulation l Decket No. 50-346

Enclosure:

As stated 1

cc w/ encl: See next page l l

i l

i i

l l

i l

______m--..-.-._ _ _ _ _

1

, John K. Wood Davis-Besse Nuclear Power Station, Unit 1 Toledo Edison Company l

CC:

Mary E. O'Reilly Robert E. Owen, Chief FirstEnergy Bureau of Radiological Health Davis-Besse Nuclear Power Station Service 5501 North State - Route 2 Ohio Department of Health Oak Harbor, OH 43449-9760 P.O. Box 118 l Columbus, OH 43266-0118 I James L. Freels '

Manager- Regulatory Affairs Toledo Edison Company James R. Williams, Chief of Staff Davis-Besse Nuclear Power Station Ohio Emergency Management Agency '

l 5501 North State - Route 2 2855 West Dublin Granville Road Oak Harbor, OH 43449-9760 Columbus, OH 43235-2206 l q l Jay E. Silberg, Esq. Donna Owens, Director

Shaw, Pittman, Potts Ohio Department of Commerce l and Trowbridge Division of industrial Compliance ,

l 2300 N Street, NW. Bureau of Operations & Maintenance  !

Washington, DC 20037 6606 Tussing Road j P.O. Box 4000 Regional Administrator Reynoldsburg, OH 43068-9009 U.S. Nuclear Regulatory Commission i 801 Warrenville Road Ohio Environmental Protection Agency l l Lisle, IL 60523-4351 DERR-Comp!iance Unit ATTN: Zack A. Clayton Robert B. Borsum P.O. Box 1049 Babcock & Wilcox Columbus, OH 4326"-0149 Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 State of Ohio l Rockville, MD 20852 Public Utilities Commlssion  !

180 East Broad Street Resident inspector Columbus, OH 43266-0573 l U.S. Nuclear Regulatory Commission 5503 North State Route 2 Attomey General Oak Harbor, OH 43449 Department of Attorney 30 East Broad Street James H. Lash, Plant Manager Columbus, OH 43216 h- Toledo Edison Company Davis-Besse Nuclear Power Station President, Board of County l

5501 North State Route 2 Commissioner of Ottawa County Oak Harbor, OH 43449-9760 Port Clinton, OH 43252 l

l

, 1 b___________________________.__________-_--__-_-- _ - - - _ _ - - - - - - -