Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML20258A284, ML20269A465, ML20276A192, ML20303A199, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML20352A3942020-12-17017 December 2020 Proposed License Amendment Request to Change Battery Surveillance Requirements Project stage: Request ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 Project stage: Supplement ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure Project stage: RAI ML21063A5522021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Email Project stage: RAI ML21067A5072021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Other ML21067A5042021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Other ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 Project stage: Supplement ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 Project stage: Other ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs Project stage: RAI ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 Project stage: Other ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves Project stage: Supplement ML21036A0602021-04-0808 April 2021 Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application Project stage: Other ML21104A0372021-04-15015 April 2021 Request for Withholding Information Regarding Subsequent License Renewal Application Project stage: Withholding Request Acceptance ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion Project stage: Response to RAI ML21119A3402021-04-29029 April 2021 Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail Project stage: RAI ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides Project stage: Other ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting Project stage: RAI PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides Project stage: RAI ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides Project stage: Meeting ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 Project stage: Response to RAI ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda Project stage: RAI ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary Project stage: RAI ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees Project stage: RAI ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft Project stage: Draft RAI PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 Project stage: RAI ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure Project stage: Draft RAI ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 Project stage: Supplement ML21217A1872021-08-0505 August 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application First 10 CFR 54.21 (B) Annual Amendment Project stage: Other ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application Project stage: RAI ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary Project stage: RAI ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees Project stage: RAI PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue Project stage: Other ML21225A5642021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Presentation Project stage: Meeting ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail Project stage: Meeting ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Draft RAI 2021-04-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23136A8832023-05-16016 May 2023 Responses to Request for Additional Information and Request for Confirmation of Information Regarding Environmental Review of Subsequent License Renewal Application L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23103A2752023-04-13013 April 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request for Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22115A1752022-04-25025 April 2022 ASME Section XI Inservice Inspection Program - Relief Request N2-14-LMT-004 - Fourth Interval Third Period Limited Examinations - Response to Request for Additional Information ML21350A4082021-12-16016 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Genera Tor Tube Inspections, Rev 1, Using the Consolidated Line-Item Improvement Process Response to RAI ML21341B4372021-12-0606 December 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application Responses to NRC Request for Additional Information Safety Review - Set 5 ML21258A3542021-09-15015 September 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Confirmation of Information Set 2 Safety Review ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21126A3152021-05-0606 May 2021 Proposed License Amendment Request to Battery Surveillance Requirements - Response to Request for Additional Information ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 ML21056A5572021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21053A4332021-02-22022 February 2021 (Naps), Units 1 and 2 - Subssequent License Renewal Application (SLRA) Environmental Review - Response to NRC Request for Additional Information ML21042B9042021-02-11011 February 2021 Subsequent License Renewal Application, Response to NRC Requests for Confirmation of Information for the Environmental Review ML21033A3022021-01-25025 January 2021 (NAPS) Units 1 and 2 - Subsequent License Renewal Application (SLRA) - Provides Requested Documents in Response to Environmental Audit. Part 1 of 2 ML21022A1752020-12-16016 December 2020 Steam Generator Tube Inspection Report RAI Response ML20296A6672020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Relief Request N1-I4-LMT-003 Response to Request for Additional Information ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20268B1872020-09-24024 September 2020 ASME Section XI Inservice Inspection Program, Proposed Inservice Inspection Alternative N1-I5-NDE-002, Response to Request for Additional Information ML20156A2872020-06-0404 June 2020 Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 & 2 Request for Alternatives to Requirements of ASME OM Code - Response to RAI ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20140A3362020-05-18018 May 2020 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules - Response to Request for Additional Information ML20021A0052020-01-17017 January 2020 Inservice Testing Program Request for Alternative to Requirements of ASME OM Code Relief Request P-9, Response to Request for Additional Information ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19248B7622019-08-22022 August 2019 Supplement to Proposed License Amendment Request - Flood Protection Dike Modification - Response to Onsite Audit Questions ML19225D1302019-08-0808 August 2019 Response to Request for Additional Information (Follow-Up) Regarding Open Phase Protection Per NRC Bulletin 2012-01 - Proposed License Amendment Request ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML19071A1142019-03-0707 March 2019 Response to 03/12/2012 Information Request, Seismic Probabilistic Risk Assessment Supplement for Recommendation 2.1 ML18267A0682018-09-18018 September 2018 Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests ML18257A2272018-09-14014 September 2018 SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant Response ML18169A2262018-06-13013 June 2018 Attachment 1 - Response to Request for Additional Information ML18169A2272018-06-13013 June 2018 Attachment 3 - Proposed NAPS Emergency Plan Changes ML18093A4452018-03-28028 March 2018 Ad 2, Response to 03/12/2012 Information Request Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML18092A0812018-03-26026 March 2018 Supplement to Proposed License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18037A7042018-01-31031 January 2018 Response to Request for Additional Information Regarding Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17354A1602017-12-14014 December 2017 Response to March 12, 2012 Information Request Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 ML17241A0452017-08-24024 August 2017 Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information ML17171A2302017-06-14014 June 2017 Response to Request for Additional Information ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-009 and N2-I4-NDE-004 ML17065A2502017-02-28028 February 2017 & Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Response to Request for Referenced Information Related to RAIs 2-2, 3-5, and 3-8 ML17025A1282017-01-20020 January 2017 Independent Spent Fuel Storage Installation - Response to Request for Additional Information for License Renewal Application (CAC L25121) 2023-07-26
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY 23261 RICHMOND, VIRGINIA September 15,2021 10CFR50 10CFR51 10CFR54 United StatesNuclear Regulatory Commission Serial No.21-318 Document Control Desk Attention: NRA/SS: RO Washington, D.C. 20555-0001 Docket Nos. 50-338/339 License Nos.NPF-4/7 VIRGINIA ELECTRIC ANDPOWER COMPANY RESPONSE TONRCREQUEST FORCONFIRMATION OFINFORMATION SET2 SAFETYREVIEW
References:
1 VirginiaElectric andPower Company (Dominion) letter toU.S.Nuclear Regulatory Commission (NRC), "North AnnaPower Station, Units 1 and2 Application for Subsequent RenewedOperating Licenses," (ADAMS Package Accession N o.
ML20246G703), dated August 24,2020(Serial No.20-115)
- 2. NRCElectronic mail toDominion, "FINAL Request for Confirmation ofInformation Set 2 North AnnaSLRASafety Review (EPID No.L-2020-SLR-0000)," (ADAMS Accession No.ML21256A033), dated September 13,2021 InReference 1,Virginia Electric andPowerCompany(Dominion) submitted the subsequent license renewal application (SLRA) forN APS Units 1and 2.In Reference 2, theNRCprovided a request for confirmation ofinformation (RCI) thatthestaff willlikely useintheSafety Evaluation Report for theNAPSSLRA,butwhich hasnotbeen previously docketed. TheNRCRCIandDominion's confirmation ofthe RCIareprovided intheenclosure.
SerialNo.21-318 Docket Nos.50-338/339 Response toNRCRCISet2 NAPSSLRASafety Review Page2 of6 Ifthere are any questions regarding thissubmittal orif additional information isneeded, please contact Mr. Paul Aitken at(804) 273-2818.
Sincerely,
/ L '
MarkD.Sartain Vice President -
Nuclear Engineering andFleet Support COMMONWEALTH OFVIRGINIA )
)
COUNTY OFHENRICO )
Theforegoing document wasacknowledged me,inandforthe County andCommonwealth aforesaid, before todayby MarkD.Sartain, whoisVicePresident -
Nuclear and Fleet Support ofVirginia Engineering Electric andPower Company.He hasaffirmed methat before heisduly authorized toexecute andfiletheforegoing documentinbehalf ofthat Company, andthat thestatementsinthedocumentaretruetothebest ofhisknowledge andbelief.
Acknowledgedbeforeme this15+h dayof 2021.
MyCommission Expires:
NotryP Commitments madeinthis letter: None
Enclosure:
Response toNRCRequest forConfirmation ofInformation Set2 NAPS SLRASafety Review CRAIG D SLY Notary Public Commonwealth ofVirginia Reg. # 7518653 MyCommission December Expires 20D 31,
Serial No.21-318 DocketNos.50-338/339 Response toNRCRCISet2 NAPSSLRASafety Review Page3of6 cc:
U.S.Nuclear Regulatory Commission, II Region Marquis One Tower 245Peachtree Center Avenue, NE Suite1200 Atlanta, Georgia 30303-1257 Ms.Lois James NRCProject Manager U.S.Nuclear Regulatory Commission OneWhite FlintNorth MailStop O 11F1 11555 Rockville Pike Rockville,Maryland 20852-2738 Mr.TamTran NRCProject Manager U.S.Nuclear Regulatory Commission OneWhite FlintNorth MailStop O 11F1 11555 Rockville Pike Rockville,Maryland 20852-2738 Mr.John Klos NRCProject Manager U.S.Nuclear Regulatory Commission OneWhite FlintNorth MailStop 09E-3 11555 Rockville Pike Rockville,Maryland 20852-2738 Mr.G.Edward Miller NRCSenior Project Manager U.S.Nuclear Regulatory Commission OneWhite FlintNorth Stop Mail O9E-3 11555 Rockville Pike Rockville,Maryland 20852-2738 NRCSenior Resident Inspector NorthAnnaPower Station OldDominion Electric Cooperative ElectronicallyDistributed
Serial No.21-318 DocketNos.50-338/339 Response toNRCRCISet2 NAPSSLRASafety Review Page4 of6 State Health Commissioner Virginia Department ofHealth JamesMadison Building 7th -
Floor 109Governor Street Room730 Richmond, Virginia 23219 Mr.David K.Paylor, Director Virginia Department of Environmental Quality P.O. Box1105 Richmond, VA23218 Ms.Melanie D.Davenport, Director Water Permitting Division Virginia Department ofEnvironmental Quality P.O. Box1105 Richmond, VA23218 Ms.Bettina Rayfield, Manager Office ofEnvironmental Impact Review Virginia Department ofEnvironmental Quality P.O. Box1105 Richmond, VA23218 Mr.Michael Dowd,Director Air Division Virginia Department ofEnvironmental Quality P.O. Box1105 Richmond, VA23218 Ms.Kathryn Perszyk LandDivision Director Virginia Department ofEnvironmental Quality 1111East Main Street Suite 1400 Richmond, VA23219 Mr.JamesGolden, Regional Director Virginia Department ofEnvironmental Quality Piedmont Regional Office 4949-A CoxRoad Glen Allen, VA23060 Ms.Jewel Bronaugh, Commissioner Virginia Department ofAgriculture & Consumer Services 102Governor Street Richmond, Virginia 23219
Serial No.21-318 Docket Nos.50-338/339 Response toNRCRCISet2 NAPSSLRASafety Review Page5of6 Mr. Jason Bulluck, Director Virginia Department ofConservation & Recreation Virginia Natural Heritage Program 600EastMain Street, 24th Floor Richmond, VA 23219 Mr.RyanBrown, Executive Director Director's Office Virginia Department of Wildlife Resources P.O. Box90778 Henrico, VA23228 Ms.Julie Henderson, Director Virginia Department ofHealth Office ofEnvironmental Health Services 109Governor St, 5th Floor Richmond, VA23129 Ms.Julie Langan, Director Virginia Department ofHistoric Resources State HistoricPreservation Office 2801Kensington Ave Richmond, VA23221 Mr.Steven G.Bowman,Commissioner Virginia Marine Resources Commission 380Fenwick Road Building 98 Ft. Monroe, VA23651 Ms.Angel Deem,Director Virginia Department ofTransportation Environmental Division 1401East Broad St Richmond, VA23219 Mr.Stephen Moret, President Virginia Economic Development Partnership 901East Byrd St Richmond, VA23219 Mr.William F.Stephens, Director Virginia State Corporation Commission Division ofPublic Utility Regulation 1300East Main St, 4thFI, Tyler BIdg Richmond, VA23219
Serial No.21-318 DocketNos.50-338/339 Response toNRCRCISet2 NAPSSLRASafety Review Page6of6 Ms. Lauren Opett, Director Virginia Department ofEmergency Management 9711Farrar Ct North Chesterfield, VA23236 Mr.MarkStone, Chief Regional Coordinator Virginia Department ofEmergency Management 13206 Lovers Lane Culpeper, VA22701
Serial No.21-318 Docket Nos.50-338/339 Enclosure
RESPONSE
TONRCREQUEST FORCONFIRMATION OFINFORMATION SET2 NAPS SLRA SAFETYREVIEW Virginia andPowerCompany Electric (DominionEnergyVirginia)
AnnaPower North Station Units 1and2
Serial No.21-318 Docket Nos.50-338/339 Enclosure -
Page2 of3 NAPSSlRASafetyjeview m
dated By letter August 24, 2020, (Agencywide Documents Access andManagement System Accession No.ML20246G703), Virginia Electric andPower Company (Dominion) submittedanapplication for subsequent license renewal ofRenewed Facility Operating LicenseNos.NPF-4andNPF-7for the NorthAnnaPower Station, Unit Nos.1and2 (NorthAnna) totheU.S. Nuclear Regulatory Commission (NRC) pursuant toSection 103 oftheAtomic Energy Actof1954, asamended, andpart 54oftitle 10oftheCodeof FederalRegulations,"Requirements for renewal ofoperating licenses for nuclear power plants."
TheNRCisinthe process ofreviewing theapplication. Basedontheir review, theNRC identified staff a requestfor confirmation ofinformation (RCI) which will likely beusedin theSafety Evaluation Report (SER) fortheNAPS SLRA, butwhich hasnotbeen docketed.
previously Tothebest ofthestaff's knowledge, this information isnotonthe docketoraccessible inthepublic domain. Anyinformation used toreach a conclusion in theSERmustbeincluded onthedocket bytheapplicant.
A meetingwasheld between theNRCstaff andDominion onAugust 27,2021andthis RCIwasgenerated asa result ofthat call.
inanemail Therefore, dated September 13,2021, theNRCstaff transmitted final their RCI.Thefinal NRCRCIandDominion's confirmation oftheRCIisprovided below.
RCINo.4.7.6A:
Section4.7.6ofthesubsequentlicense renewal application (SLRA) describes thetime aging limited analyses (TLAA) for thereactor coolant pumpcasing asrelated tothe ASMECodeCaseN-481. TheTLAAaspects ofthe analysis arethe thermal aging of CASSandfatigue crack growth.
Thissectionreferences WCAP-18503-P for the plant-specific loadings for thereactor pumpcasing.
coolant TheSLRAreferences Revision 1,of WCAP-18503, "Resolution ofNorthAnnaPower Station Units 1& 2 Time-Limited Aging Analyses for Subsequent LicenseRenewal," dated July 2020.
Revision2 ofWCAP-18503-P, (Proprietary), "Resolution ofNorth AnnaPowerStation Units1 & 2 Time-Limited Aging Analyses for Subsequent License Renewal," dated September wasprovided 2021, onthe ePortal.
ConfirmthatRevision 2 ofWCAP-18503-P supersedes Revision 1andisthe analysis ofrecordfortheSLRA.21-318 No.:
Serial Docket Nos.::
50-338/339 Page3 of3 Enclosure DomLign Bespjlmign Thisinformation hasbeenconfirmed tobecorrect asstated.