MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23136A8832023-05-16016 May 2023 Responses to Request for Additional Information and Request for Confirmation of Information Regarding Environmental Review of Subsequent License Renewal Application L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23103A2752023-04-13013 April 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request for Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22115A1752022-04-25025 April 2022 ASME Section XI Inservice Inspection Program - Relief Request N2-14-LMT-004 - Fourth Interval Third Period Limited Examinations - Response to Request for Additional Information ML21350A4082021-12-16016 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Genera Tor Tube Inspections, Rev 1, Using the Consolidated Line-Item Improvement Process Response to RAI ML21341B4372021-12-0606 December 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application Responses to NRC Request for Additional Information Safety Review - Set 5 ML21258A3542021-09-15015 September 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Confirmation of Information Set 2 Safety Review ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21126A3152021-05-0606 May 2021 Proposed License Amendment Request to Battery Surveillance Requirements - Response to Request for Additional Information ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 ML21056A5572021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21053A4332021-02-22022 February 2021 (Naps), Units 1 and 2 - Subssequent License Renewal Application (SLRA) Environmental Review - Response to NRC Request for Additional Information ML21042B9042021-02-11011 February 2021 Subsequent License Renewal Application, Response to NRC Requests for Confirmation of Information for the Environmental Review ML21033A3022021-01-25025 January 2021 (NAPS) Units 1 and 2 - Subsequent License Renewal Application (SLRA) - Provides Requested Documents in Response to Environmental Audit. Part 1 of 2 ML21022A1752020-12-16016 December 2020 Steam Generator Tube Inspection Report RAI Response ML20296A6672020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Relief Request N1-I4-LMT-003 Response to Request for Additional Information ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20268B1872020-09-24024 September 2020 ASME Section XI Inservice Inspection Program, Proposed Inservice Inspection Alternative N1-I5-NDE-002, Response to Request for Additional Information ML20156A2872020-06-0404 June 2020 Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 & 2 Request for Alternatives to Requirements of ASME OM Code - Response to RAI ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20140A3362020-05-18018 May 2020 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules - Response to Request for Additional Information ML20021A0052020-01-17017 January 2020 Inservice Testing Program Request for Alternative to Requirements of ASME OM Code Relief Request P-9, Response to Request for Additional Information ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19248B7622019-08-22022 August 2019 Supplement to Proposed License Amendment Request - Flood Protection Dike Modification - Response to Onsite Audit Questions ML19225D1302019-08-0808 August 2019 Response to Request for Additional Information (Follow-Up) Regarding Open Phase Protection Per NRC Bulletin 2012-01 - Proposed License Amendment Request ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML19071A1142019-03-0707 March 2019 Response to 03/12/2012 Information Request, Seismic Probabilistic Risk Assessment Supplement for Recommendation 2.1 ML18267A0682018-09-18018 September 2018 Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests ML18257A2272018-09-14014 September 2018 SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant Response ML18169A2262018-06-13013 June 2018 Attachment 1 - Response to Request for Additional Information ML18169A2272018-06-13013 June 2018 Attachment 3 - Proposed NAPS Emergency Plan Changes ML18093A4452018-03-28028 March 2018 Ad 2, Response to 03/12/2012 Information Request Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML18092A0812018-03-26026 March 2018 Supplement to Proposed License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18037A7042018-01-31031 January 2018 Response to Request for Additional Information Regarding Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17354A1602017-12-14014 December 2017 Response to March 12, 2012 Information Request Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 ML17241A0452017-08-24024 August 2017 Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information ML17171A2302017-06-14014 June 2017 Response to Request for Additional Information ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-009 and N2-I4-NDE-004 ML17065A2502017-02-28028 February 2017 & Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Response to Request for Referenced Information Related to RAIs 2-2, 3-5, and 3-8 ML17025A1282017-01-20020 January 2017 Independent Spent Fuel Storage Installation - Response to Request for Additional Information for License Renewal Application (CAC L25121) 2023-07-26
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 PROPRIETARY INFORMATION-WITHHOLD UNDER 10 CFR 2.390 February 28, 2017 U. S. Nuclear Regulatory Commission
- Serial No.17-059 Attention: Document Control Desk
- NRA/DEA RO Washington, DC 20555-0001 Docket No.: 72-16 License No.: SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION RESPONSE TO REQUEST FOR REFERENCED INFORMATION In a May 25, 2016 letter (Serial No.16-031), Virginia Electric and Power Company (Dominion) on behalf of itself and Old Dominion Electric Cooperative (ODEC) submitted an application for renewal of the North Anna Power Station (NAPS) site-specific Independent Spent Fuel Storage Installation (ISFSI) license SNM-2507 (Agency Documents Access and Management System (ADAMS) Accession No. ML16153A140).
The Nuclear Regulatory Commission (NRC) acknowledged acceptance of the license renewal application on July 21, 2016 (ADAMS Accession No. ML16207A104).
A Request for Additional Information (RAI) (ADAMS Accession No. ML16330A715) related to the application for renewal of the NAPS* site-specific ISFSI license was subsequently received on November 23, 2016 and the response submitted on January 20, 2017 (ADAMS Accession No. ML17025A128).
In an email dated February 2, 2017, the Nuclear Regulatory Commission (NRC) transmitted a request for Dominion to provide information that was referenced in the response to RAls 2-2, 3-5 and 3-8 related to the application for renewal of the NAPS site-specific ISFSI license dated January 20, 2017.
On February 15, 2017, a telecon was held between the NRC and Dominion to discuss the details of the requested reference information being provided. Based on the results of the telecon, Dominion is providing the following Attachments to this letter, as well as the three compact discs included as Enclosure 1, to the NRC with the requested information:
- Attachment 1 provides Dominion calculation NE-1311, Technical Report, "Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel for use at the North Anna Power Station Independent Spent Fuel Storage Installation," Rev. O tJf'./1551 l,,,.
Attachments 3 and 4 contain information that is being withheld from public disclosure.
under 10 CFR 2.390. Upon separation from Attachments 3 and 4 this letter is decontrolled.
Serial No.17-059 Docket No.: 72-16 Response to Request for Referenced Information Page 2 of 4
- Attachment 2 provides Dominion calculation PA-0181, "North Anna ISFSI Cask Surface, Perimeter Fence, Site Boundary, and Nearest Permanent Resident Dose Rates Based on the TN-32 Dry Storage Cask," Rev. 0 [NOTE: Dominion calculations only required a Preparer and Reviewer signature in 2001]
- Attachment 3 provides AREVA calculation 503065-0501, 'TN-32 Cask Combustible Gas Generation in Neutron Shield Resin," Rev. 0 (proprietary)
- Attachment 4 provides AREVA calculation 503065-0500, "Neutron Fluence, Gamma Exposure and Dose Rate Calculation for North Anna Power Station TLAA Phase 2," Rev. 0 (proprietary)
- Attachment 5 provides Dominion calculation CE-1399, "Evaluation of NAPS As-Built ISFSI Concrete Storage Pad," Rev. 0
- Attachment 6 provides Dominion calculation CE-1399, Rev. 0, Addendum #OOA, "Evaluation of Ageing Effects of Concrete Cask Drop & Tipover Events," Rev. 0
- Attachment 7 contains the Affidavit of AREVA TN Americas LLC for withholding proprietary Information from public disclosure.
- Enclosure 1 contains three compact discs which contents include the output files from calculation PA-0181, Rev. 0.
Since Attachments 3 and 4 contain information proprietary to AREVA TN Americas LLC, they are supported by an affidavit signed by the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390.
Accordingly, it is respectfully requested that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390.
Because of the amount of proprietary information included in the documents in Attachments 3 and 4, a non-proprietary version of the documents would be of no value to the public and has not been prepared.
Should you have any questions in regard to this submittal, please contact Ms. Diane E.
Aitken at (804) 273-2694.
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None
Serial No.17-059 Docket No.: 72-16 Response to Request for Referenced Information Page 3 of 4 Attachments:
- 1. Dominion calculation NE-1311, Technical Report, "Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel for use at the North Anna Power Station Independent Spent Fuel Storage Installation," Rev. 0
- 2. Dominion calculation PA-0181, "North Anna ISFSI Cask Surface, Perimeter Fence, Site Boundary, and Nearest Permanent Resident Dose Rates Based on the TN-32 Dry Storage Cask," Rev. 0
- 3. AREVA calculation 503065-0501, "TN-32 Cask Combustible Gas Generation in Neutron Shield Resin," Rev. 0 (proprietary)
- 4. AREVA calculation 503065-0500, "Neutron Fluence, Gamma Exposure and Dose Rate Calculation for North Anna Power Station TLAA Phase 2," Rev. 0 (proprietary)
- 5. Dominion calculation CE-1399, "Evaluation of NAPS As-Built ISFSI Concrete Storage Pad," Rev. 0
- 6. Dominion calculation CE-1399, Addendum #OOA, "Evaluation of Ageing Effects of Concrete Cask Drop & Tipover Events," Rev. 0
- 7. Affidavit of AREVA TN Americas LLC for withholding proprietary Information from public disclosure
Enclosure:
- 1. Three compact discs which contents include the output files from calculation PA-0181, Rev. 0 cc: (without Attachments or Enclosure)
U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Kristina Banovac Project Manager: NAPS ISFSI LRA U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop 4 B72 11545 Rockville Pike Rockville, Maryland 20852-2738 Mr. John N. Nguyen Senior Project Manager: NAPS ISFSI U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T4834 11545 Rockville Pike Rockville, Maryland 20852-2738
Serial No.17-059 Docket No.: 72-16 Response to Request for Referenced Information Page 4 of 4 cc: Mr. J. E. Reasor, Jr Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, VA 23060 Mr. R. McWhorter Vice President of Operations & Asset Management Old Dominion Electric Cooperative 4201 Dominion Blvd Glen Allen, Virginia 23060 State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street Room 730 Richmond, Virginia 23219 NRC Senior Resident Inspector North Anna Power Station
Serial No.17-059 Docket No.: 72-16 Response to Request for Referenced Information ATTACHMENT 7 AFFIDAVIT OF AREVA TN AMERICAS LLC FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE Virginia Electric and Power Company (Dominion)
North Anna Power Station Independent Spent Fuel Storage Installation
A AREVA TN Americas LLC Feb. 10,2017 E-47624 Rev. 0 Jason Mantzouranis, PM Suite 300 7135 Minstrel Way Columbia, MD 21045
Subject:
Release of TN Documents for License Renewal Amendment to License SNMM2507, Docket No. 72M16 *
Dear Jason:
This correspondence is written to provide select design documents in support of the subject License Renewal Amendment (LRA). These documents are in support of an extension of the 10 CFR Part 72 license for the storage of spent nuclear fuel at the North Anna Power Station. The documents requested are being transmitted to Dominion Power under proprietary agreement and will, subsequently, be forwarded to the NRC via affidavit pursuant to 10 CFR 2.390.
The specific AREVA TN Americas documents to be transmitted are identified as follows:
- Calculation 503065-0500 Rev. O
- Calculation 503065-0501 Rev. O Please forward controlled copies of these documents to Dominion Power under proprietary agreement and request return correspondence signifying receipt of said documents.
If you or anyone at Dominion Power has questions on information contained herein, please contact me and I will strive to resolve the issue as soon as possible.
Sincerely, Tom Edwards Design Project Engineer Attachments: (1) -Affidavit Page 1 of 2 TN AMERICAS LLC 71 35 Minstrel Way, Suite 300, Columbia, Maryland 21 045 Tel.: 410 910 6900- Fax: 410 910 6902 - www.us.areva.com/AREVATN
A
.AREVA TN Americas LLC cc: Phil Lozmack (PM) Rod Gooch (PM)
Ajay Verma (QAS) John McEntire (PM)
Dennis Williford (Licensing) Jim Williams (Dominion Power)
Lauren Naggs (DCA) Project File 593065 - Outgoing Correspondence Page2 of2 TN AMERICAS LLC 71 36 Minstrel Way, Suite 300, Columbia, Maryland 21045 Tel.: 410 910 6900- Fax: 410 910 6902 -www.us,areva.com/AREVATN
Attachment to Letter E-47624 AFFIDAVIT PURSUANT TO 10 CFR 2.390 TN Americas LLC )
State of Maryland ) SS.
County of Howard )
I, Jayant Bondre, depose and say that I am Chief Technology Officer of TN Americas LLC, duly authorized to execute this affidavit, and have reviewed or caused to have reviewed the information which is identified as proprietary and referenced in the paragraph immediately below. I am submitting this affidavit in conformance with the provisions of 10 CFR 2.390 of the Commission's regulations for withholding this information.
The information for which proprietary treatment is sought is listed below:
- Calculation No. 503065-0500 Revision 0
- Calculation No. 503065-0501 Revision 0 This information has been appropriately designated as proprieta.iy.
I have personal knowledge of the criteria and procedures utilized by TN Americas LLC in designating information as a trade secret, privileged, or as confidential commercial or fina.ncial information.
Pursuant to the provisions of paragraph (b) (4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure, included in the above referenced documents, should be withheld.
- 1) The information sought to be withheld from public disclosure involves time-limited aging analyses (neutron fluence, gamma exposure and dose rates, a.i.1d combustible gas generation in the neutron shield) associated with the TN-32 dry spent :ti.rel storage cask, which are owned and have been held in confidence by TN Americas LLC.
- 2) The information is of a type customarily held in confidence by TN Americas LLC and not customarily disclosed to the public. TN Americas LLC has a rational basis for determining the types of infonnation customarily held in confidence by it.
- 3) Public disclosure of the information is likely to cause substantial harm to the competitive position of TN Americas LLC because the information consists of descriptions of the methodology and time-limited aging analyses for components of the TN-32 dry spent fuel storage cask, the application of which provide a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with TN Americas LLC, take marketing or other actions to improve their product's position or impair the position of TN Americas LLC's product, and avoid developing sinlilar data and analyses in support of their processes, methods or apparatus.
Further the deponent sayeth not.
~
J ayant Bondre Chief Technology Officer, TN Americas LLC Subscribed and sworn before me this 13th day ofFebruary, 2017.
IL--~*
RONDA JONES
~OTARV PUBLIC STATE OF MARVLANP 1>,1y Commission Expires October 16, 2019 Not~Public My Commission Expires ___10~~
Page 1of1
Serial No.17-059 Docket No.: 72-16 Response to Request for Referenced Information ENCLOSURE 1 THREE COMPACT DISCS WHICH CONTENTS INCLUDE THE OUTPUT FILES FROM CALCULATION PA-0181, REV. 0 Virginia Electric and Power Company (Dominion)
North Anna Power Station Independent Spent Fuel Storage Installation