ML20237B208

From kanterella
Jump to navigation Jump to search
Forwards Revised Epips,Including Rev 5 to EPIP 1, Classification of Emergencies & Rev 5 to EPIP 2, Notifications. Change to EPIP Corrects Sentence Syntax & Rev to EPIP 2 Incorporates Several Minor Changes
ML20237B208
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/13/1998
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237B210 List:
References
VPN-038-98, VPN-38-98, NUDOCS 9808180107
Download: ML20237B208 (2)


Text

_.

Portland General Electric

, ,, Trojan Nuclear Plant 71760 Columbia Rixr Hity Rainier OR 97048 (S03)556-3713 August 13,1998 VPN-038-98 Trojm Nuclear Plant Docket 50-344 License NPF-1 i U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Dear Sirs:

1 Transmittal of Emergency Plan Implementing Procedures i l

In accordance with 10 CFR 50, Appendix E.V, this letter transmits revised copies of Trojan Nuclear Plant Emergency Plan implementing Procedures (EPIPs) 1 and 2, Revision 5, The change to EPIP 1 corrects sentence syntax. The revision to EPIP 2 incorporates several minor changes identified during emergency preparedness training and drills and corrects a State agency title.

Sincerely, l

W Stephen M. Quennoz Trojan Site Executive Attachment l

l c: R. A. Scarano, NRC Region IV (w/o Attachment) ,

L. II. Thonus, NRC, NRR (w/o Attachment)

D. Stewart-Smith, OOE (w/o Attachment) 'I yh \

9808190107 %D813 '

PDR ADOCK 03000344 F PM .

. I I

SET: 427 USNRC

)'

Document Control Desk clo Cindy Casciato UPDATED August 4,1998 TRANSMITTAL NO.98-090 Emergency Procedures PROCEDURE CHANGES Instructions for Filina Please insert the attached changes in your manual as directed below:

l REMOVE BIBL INSERT f3fBL Table of Contents Table of Contents i

EPIP 1 5 EPIP 1 5 '

Pages 1 thru 8 Pages 1 thru 8 File TCN T98-045 behind last page.

EPIP 2 4 EPIP 2 5 I

?