TXX-6809, Forwards Comanche Peak Response Team Results Repts,Including Rev 1 to Issue Specific Action Plan Ii.E, Rebar in Fuel Handling Bldg & Decision Specific Action Plan IX, Piping & Supports Discipline Specific Action Plan

From kanterella
(Redirected from ML20235S154)
Jump to navigation Jump to search
Forwards Comanche Peak Response Team Results Repts,Including Rev 1 to Issue Specific Action Plan Ii.E, Rebar in Fuel Handling Bldg & Decision Specific Action Plan IX, Piping & Supports Discipline Specific Action Plan
ML20235S154
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/29/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235S157 List:
References
CPRT-1001, TXX-6809, NUDOCS 8710080345
Download: ML20235S154 (4)


Text

___ _- _- - - -- ._. _ _ _ _ _ -

j I ,

.l -

M Log # TXX-6809

l. -- 4 CPRT-1001 E

"""~

1 ---

. File # 10068 l nlELECTRIC L

l warmm c. camsu September 29, 1987 Emuthe he President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CPRT RESULTS REPORTS

, Gentlemen:

l We transmit herewith the following SRT approved Results Reports:

II.e Rebar in the Fuel Handling Building V.a (Errata) Inspection for Certain Types of Skewed Welds in NF Supports DSAP IX Piping and Supports Discipline Specific Action Plan These reports should be placed in sequence behind the. tabs " Civil / Structural" for II.e; " Mechanical" for. V.a (Errata); and "DSAP" for DSAP IX in the results reports binders previously transmitted.

l The files that contain supporting documentation for these Results Reports'have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms.

Debra Anderson (214-812-4379),

l We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very t uly yours,

%V W. G. Counsil 8710080345 870929,-. )

PDR ADOCK 05000445 PDR

-/,,

l A By: m A;7 ,

l G~ S. Keeley . c ~.

Manager, Nuclear Li sing TLS/gj l c - Mr. R. D. Martin, Region IV Y l Resident Inspectors, CPSES (3) 1 k

400 North Olive Street - LR 81 Dallas, Texas 75201

f

~l

. .. . i I

TABLE OF CONTENTS I t~

v-COLLECTIVE SIGNIFICANT [ REPORT

- Later - 1 1

i COLLECTIVE EVALUATION REPORTS

- Later -

RESULTS REPORTS l i

Electrical 1.a.1 Heat-Shrinkable Cable Insulation Sleeves -

Revision 1 1.a.2 Inspection Reports on Butt-Splices, Revision 1 1.a.3 Butt-Splice Qualification - Revision 1 1.a.4 Agreement Between Drawings and Field Terminations  !

1

- Revision 2

! 1.a.5 NCR's on Vendor Installed Amp Terminal lugs I

l {

- Revision 1

'(~~~

( l.b.1 Flexible Conduit to Flexible Conduit Separation \

i

- Revision 1 l

1.b.2 Flexible ' Conduit to Cable Separation -

Revision 1 1.b.3 Conduit to Cable Tray Separation - Revision 1 i

1.b.4 Barrier Removal - Revision 1 Civil / Structural II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures

- Revision 1 II.e Rebar in the Fuel Handling Building - Revision 1

[

1I

\

l 1

1 L \s-

/G[ Testing i

l III.a.1 Hot Functional Testing - Revision 1 Ill.a.2 JTG Approval of Test Data - Revi.sion 0 Ill.a.3 Technical Specification for Deferred Tests

- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 L

III.a.5 Preoperational Test Review and Approval of Results, Revision 1 III.b Conduct of the CILRT - Revision 0 i

{

lil.c Prerequisite Testing - Revision 1 1 Ill.d Preoperational Testing - Revision 1 Mechanical V.a inspection for Certain Types of Skewed Welds in NF g-)g Supports - Revision I with Errata j

\-

V.c Design Consideration for Piping Systems Between \

Seismic C. ate gory I and Non-Seismic Category 1 {

Buildings Revision 1 J i

V.d Plug Welds - Revision i V.e Installation of Main Steam Pipes - Revision.1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision ,

1 t i

.l l

j i

0^' '

([) j I -. d . 2 Guidelines for Administration _of QC Inspector Test j

- Revision 1 1.d.3 Craft Personnel Training - Revision 1 ,

VII.a.1 Material Traceability - Revision 1 l VII.a.2 Nonconformance-and Corrective Action System -

Revision 1 '

VII.a.3 Document Control , Revision i Vll.a.4 Audit Program and Auditor Qualification -

Revision i 1 VII.a.5 Periodic Review of QA Program - Revision i VII.a.6 Exit Interviews - Revision i Vll.a.7 Housekeeping and System Cleanliness - Revision i Vll.a.8 Fuel Pool liner Documentation - Revision 1 4 i

VII.b.1 Onsite Fabrication - Revision 1 .)

vil.b.2 Valve Disassembly - Revision i VII.b.4 Hilti Anc. hor Bolt Installation - Revision 1 1 t

DSAPs l

l IX Piping and Supports Discipline Specific Action Plan '

l

- Revision 1 e

'S

__._____.m_. _ _ _ __---___ A