Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB
ML20214W568
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/05/1987
From: Chandler L
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Bright G, Cotter B, Harbour J
Atomic Safety and Licensing Board Panel
References
CON-#287-3722 OLA, NUDOCS 8706160083
Download: ML20214W568 (3)


Text

a

$ &2 ~'

/

UNITED STATES 8

o,'n Oct v.3 -

NUCLEAR REGULATORY COMMISSION UN' E

p WASHINGTON, D. C. 20555

/

'87 JUN 11 P3 :06

        • +

June 5,1987 00 Chi +.s ir.r Sk1?h,*

B. Paul Cotter, Jr., Chairman Glenn O. Bright Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Dr. Jerry Harbour Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.

20555 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275 OLA and 50-323 OLA (Spent Fuel Pool)

Dear Administrative Judges:

Enclosed is the list of exhibits intended to be offered by the Sierra Club in the upcoming hearing in the captioned proceeding.

The list, which was provided by phone to the undersigned, was received too late for inclusion in the Staff's letter to the Board of June 4,1987, which, among other items, transmitted the list of exhibits intended to be offered by the Licensee and Staff.

The enclosed list includes all documents and identifies each as described to the undersigned by phone. Mr. Lowry should review the list upon receipt and, to the extent necessary, provide any corrections.

Sinc ely, 8

Lawrence. Chandler Special Litigation Counsel

Enclosure:

Sierra Club Exhibit List cc w/ encl.: Service List 8706160003 B70605

/

PDR ADOCK 05000275 c0 o

PDR J

e Sierra Club Exhibits Exhibit No.

"Beismic Analysis of High Density Fuel Racks" for Pacific Gas 1

and Electric For Diablo Canyon Nuclear Power Station, TM Report No. 779,' A. Soler, January 29, 1986 Summary, Diablo Canyon Project Telephone Calls, 3/8/85 - 6/20/86 2

Safety Evaluation By the Office of Nuclear Reactor Regulation 3

Relating to the Reracking of the Spent Fuel Pools at Diablo Canyon Nuclear Power Plant, Units 1 and 2..,, USNRC, May 30, 1986 Affidavit of R. Clyde Herrick Regarding the Intervenor's 4

Application for a Stay, June 30, 1986 Meeting Summary - Structural Analysis of Spent Fuel Pool 5

Expansion, Byron Station Units 1 and 2. USNRC,1/12/87 Response to NRC Staff Questions Raised at the May 6,1987 6

Reracking Meeting, DCL-87-115, May 18,1987 "Three-Dimensional Studies of High Density Spent Fuel Racks 7

(Acorn 10 and Acorn 12)", PGaE DCL-87-082, 4/23/87

" Additional Information on Rack-to-Rack Interactions", PGaE 8

4/7/87 [ PROPRIETARY] (" Additional Information")

Sierra Club, " Motion for Summary Disposition", before the USNRC 9

Atomic Safety and Licensing Board, 12/15/86 USNRC, " Standard Review Plan for the Review of Safety Analysis 10 Reports for Nuclear Power Plants, NUREG-0800, Revised July,1981

("SRP")

USNRC, "OT Position for Review and Acceptance of Spent Fuel 11 Storage and Handling Applications", January 18, 1979

("OT Position")

A.I. Soler and K.P. Singh, " Seismic Response of a Free Standing 12 Fuel Rack Construction to 3-D Floor Motion", Nuclear Engineering and Design 80 (1984), pp. 315-329 (" Seismic Response")

A.I. Soler and K.P. Singh, " Dynamic Coupling in a Closely Spaced 13 Two-Body System Vibrating in a Liquid Medium: The Case of Fuel Racks", Proc. of the Third Conf. on Vibration in Nuclear Plants, British Nuclear Energy Soc., (1983), pp. 815-834

-R.J. Fritz, "The Effect of Liquids on the Dynamic Motion of 14 Immersed Solids", Jour of Eng. for Ind., February 1972, pp.167-173 ("Fritz")

O O

. K.P. Singh and T. Lee-Ng, " Planning Study Experimental 15 Measurements and Analytical Correlations of Fluid Drag of Fuel Assemblies in Fuel Rack Storage Locations", EPRI Project No. RP 2124, Joseph Oat Corp., November 1982 (" Planning Study")

I A.I. Soler, Seismic Analysis of Iligh Density Fuel Racks for 16 Pacific Gas & Electric for Diablo Canyon Nuclear Power Station",

TM Report No. 779, Revised September 1986 Summary Notes, Meeting of December 5,1985, PGaE and the NRC 17 et al., Enclosure 6 K.P. Singh and A.I. Soler, "nesign Basis Planar Motion and 3-D 18 Analysis with Cross-coupling Coefficients for Diablo Canyon Iligh Density Rack Structural Evaluation", Holtec Report HI-87117

[ PROPRIETARY]

Environmental Assessment and Finding of No Significant Impact --

19 Spent Fuel Pool Expansion, Diablo Canyon Nuclear Power Plant, Units 1 and 2, dated May 21, 1986 USNRC, " Generic Environmental Impact Statement on Handling and 20 Storage of Spent Light Water Power Reactor Fuel" August 1979