ML20234F383

From kanterella
Jump to navigation Jump to search
Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete
ML20234F383
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/14/1987
From: Morrill P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20234F270 List:
References
FOIA-84-743 NUDOCS 8709230108
Download: ML20234F383 (2)


Text

1

'[is.m su.m

+

, UNITED STATES o

., '. g j 'g.(/[ g r

g-NUCLEAR REGULATORY COMMISSION

/' ' #/ j REGION V 1450 MARIA L ANE,sulTE 210 0,

Fy

% *' b'

,o'g7 WALNUT CREEK, CALIFORNIA 945%

ses*

a.

JfEMORANDUM FOR:.T. W. Bishop, Director, Division of Resident,-

Reactor Projects and Engineering Programs THRU:

D. F. Kirsch, Chief, Reactor Projects Section No. 3 FROM:

P. J. Morrill, Reactor Inspector

SUBJECT:

INSPECTION RESULTS, LAWRENCE LIVERMORE NATIONAL LABORATORY PERSONNEL EXAMINATION OF RACEWAY SUPPORT BOLTED CONNECTIONS AT DIABLO CANYON (DN 50-275 AND 50-323)

The purpose of this memorandum is to document the results of an examination of bolted connections of raceway supports at Diablo Canyon. This effort was conducted for two reasons; first, we have received allegations related to the adequcy'of the anchor bolts which secure raceway supports to concerte (RV-83-A-033), and second, based on the feed-back I have been receiving from the Lawrence Livermore National Laboratory (contract) personnel, it appeared that adequacy of bolting of raceway supports might be a safety issue.

I requested the contract inspectors to tabulate and transmit to me the number of raceway supports examined, the number of bolts / nuts examined,-and the number and type of deficiencies observed. This information was transmitted to'me on November 8, 1983 and is current as of October 28, 1983.

Raceway Supports Examined In Detail ---- 81 Raceway Supports Partially Examined ---- estimated to be 200 to 300 l

Through Wall Anchor nuts / bolts ---- 10 to 20 examined:

One found deficient, item of non-compliance issued, licensee j

reinspected all similiar installations, 10 out of several hundred (estimated) found lose and tightened.

Other Anchor nuts / bolts ---- 1,000 to 1,500 examined:

Two were found loose, licensee tightened and documented with Minor Variation Reports (MVR)

Spring Nuts ---- 1,000 to 1,500 examined:

I Four were found loose, licensee tightened and documented with NCRs 8709230108 870914' PDR FOIA DEVINE84-743 PDR u.s.

o O

b d

2-T. W. Bishop t

f Conduit Nuts ---- 1,000 to 1,500 examined:

One was found loose, licensee tightened and documented ~with a MVR Lack of Thread Engagement ---- Several Thousand examined:

One lacked proper engagement, licensee corrected and documented with

)

a MVR i

Based on this information, I recommend we continue to use our contract inspectors to examine raceway supports at the current level of effort.

Should the licensee's deficiency rate decrease further however, I think we should examine some other area with potential problems.

h pAb~Q

\\

\\

l f

P. J. Morrill Reactor Inspector i