Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624
ML20216D093
Person / Time
Site: Diablo Canyon  
Issue date: 06/22/1987
From: Cotter B
Atomic Safety and Licensing Board Panel
To: Hayes B
NRC OFFICE OF INVESTIGATIONS (OI)
References
CON-#287-3874 OLA, NUDOCS 8706300450
Download: ML20216D093 (4)


Text

~

[ 3[r7f 23~

UNITED STATES OD UTI Ca~ ~

Ji

/

t fE NUCLEAR REGULATORY COMMISSION t.

ATOMIC SAFETY AND' LICENSING BOARD PANEL -

E

,,,,...../

W ASHIN GTON. D.C. 20555 J.J June 22, 1987

- JUN 23 P3 :37 tR 00cn o MEMORANDUM FOR: Ben B. Hayes, Director Office of Investigations 3g g g 4 g FROM:

B. Paul Cotter, Jr.

Chief AdministrativF Judge.

SUBJECTL DIABLO. CANYON DEFECTIVE WELD ALLEGATIOK..,

Attached is a~ copy of transcript pages 65 to 68~ of limited appearance statements taken Monday, June 15, 1987, just prior to hearings on the application to expand the spent fuel pools at Diablo Canyon. One of the

'4 limited appearees, Jim McDennott, alleged in his statement that he was aware of a defective weld at Diablo Canyon which had been approved by

a. Quality Control Inspector.

I refer the matter to you for appropriate.

action.

Attachment cc: Service List i

Sharon R. Connelly. 01A w/ Attachment

)

l J

i i

j P

B706300450 870622

{

PDR.ADOCK 0500 1

'S r

r 65 to be redesigned and built three different times at a cost 1

j of the. mistakes 2 - that. is still. very much in, dispute because I

that were made.

With high-level r=di a=etive. waste,.. wa e=nnat 4,

Yet,, during:. the.. time <1e= diner 5

afford any mistakes, not;onew

)

up to. this hearing..we-have hadt. history; repeat itself..,

6 7

We < have hai.' incomplete.. engineering and.

)

===e4=-c4 ng. ---

p+ 4 an= founi during thendiscovery process.

3.-

Ands as..rhdy: haar. beset brough.t -tonligtLt.. the-NRC and the F

utility have. been overlooking 7 al draft report done-for the fF NRC' by ther Brookhaven.. National Laboratory.

3 Yf This report has been available.for six-months.

33, It states. that. con==inated land area from azL accident. with e

Tg two orders of magnitude l

M this type of rerecking. would. be for a core-melt. accident.

15 greater than We cannat afford this type of problest. here. I le 17 By law yot um t iat=rr tn tha-people who live around the 13-plant. We da.not.most nuciame mente.

Thank you, gentlemen.

19 2g (Applause.)

JUDGE CCITER.:

Jim McDermott.

27-STATEMENT.0F JIM MC DERMCTT 22 23 MR. MC DERMOTT:

My last name is Mc Dermott.

24 M-c-D-e-r-m-o-t-t.

And I thank you for being here today, 25.

everybody.

E

1 I(&

i~

66 1

I was. a Diablo Canyon plant worker for _ about g

2 fiVW yearsr,r as both. a Quality.7 Control. Inspector and as a

.,aw, specifically a welder'..

I. believe, from my 3

craft m

qualification and experienca while employed ht Diablo. Canyon 4

Nuclear Power Plant,- this allows me..to-talk ahrm e some-y

's technical issues. at.: the plant..

r think it is premature to want more -spent.

7 fuel storager.when..there are so,many generie. nnclear industry g:

g-protrIemer. -

I am. personally; awarie e that7.there are still.

unanswered nuclear" safety issues;*

In fact, some of the 10..

branches of your own NRC', specifically the CIA', believe-that gg.

the Diablo Canyon allegation management program DCAMP, as 12..

gg everybody has shortened it. to, was-a.. breakdossL. in the.

34 govern==rrt* a own procedaras.

Tha NRC OIL. often found that there was nn-basia for their answers to the allegations and 15 concerns of plant workers.

16 I wout thatpublic and,.the NBC.tn.be amara of gy I

g-ic weldig probleme which. well may jeopardize plant and' g g-g, public safety, possibly at tha spent fual pools as well as' 20 tha rest of the plant.

Before' yon

  • and-the public, I.

making. a. new j ZT 22. allegation for you,and the PG and E lawyers to manage.

23 While woriting-at. the plant as a qualified.

I was directed to 24 welder, I also directed -- excuse me 15 make an unqualified weld on Class 1 material.

Because of my

r

~

q 1

t l

G7 I

l' ~ past experience as a qualified Quality Control Inspector,

~

out on the there was-a weld. joint. called 2

noticed-that-approved drawing.whiche waars not. a qualified welding. joint, 3

4-which is requiradeby fodera.L: law.

I notified the-Quality control Inspectortand.I 5"

advised him of. the i nori-conf armance.

I also advised.him of G-7

'him responsibility:e but he told. mas to... weld... it. out anyway+

Beammmer. L was. dihd to do no.. L andac. the. weld joint as s.

9 di i.J.

I~ knw tte there are. other. unqualified weld 10 It joints wittrim the plant.

I feel that the failure of an l

unqualified weld joint conid lead to a catastrophic nuclear 12 accident at the plant, inc1"A4na the spent fuel poolat..

gg Therefore, I questiers the-larger spent fuel l

)-

14 15-pool.. let alone the rest of. the plant.

I suppose, if yes don' t consider this. matter,,

i is t

17 hapets11y the cearts, et Congrees will.

I spealc in opposition tn the. speat. faaL pool==pm== ion as well as the:

19 rest of the plant becaume of the above allegation and other 19 20 disregard of the public law.

2T Thanic. you.

22 (Applause.)

23 JUDGE COTTER:

Thanir you, Mr. McDermott.