Informs That H Ashar Will Replace F Rinaldi as Witness to Testify W/H Fishman in Response to Sierra Club Contentions I(A)3,4;I(B)2,8;II(A)1,2,3,4; & II(B)1 & 2.HG Ashar Prof Qualifications Encl.Related Correspondence
ML20211C969
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/18/1987
From: Mcgurren H
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Bright G, Cotter B, Harbour J
Atomic Safety and Licensing Board Panel
References
CON-#187-2537 OLA, NUDOCS 8702200284
Download: ML20211C969 (5)


Text

_ _ . _. .

.2 eE7 S.

c gf  % g,AED CORRESPOND ED STATES f.

  • 8 F1 NUCLEAR REGULATORY COMMISSION

{  ; ,E WASHINGTON, D. C. 20555 0 s

i

'87 FEB 19 P12:11 February 18, 1987 377 '

00D', 1 .

W' <

D. Paul Cotter, Jr. , Chairman Glenn O. Bright Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission

Washington , D. C. 20555 Washington, D.C. 20555 Dr. Jerry Harbour Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of -

PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275 OLA and 50-323 OLA (Spent Fuel Pool)

Dear Administrative Judges:

, This is to inform the Board end parties that Hansraj Ashar, whose profes-

! sional qualifications are attached (Attachment 1), will be replacing Frank Rinaldi as the NRC staff witness to testify with Howard Fishman in response to Sierra Club Contentions f(A)3, 4; I(B)2, 8; II(A)1, 2, 3, 4; and II(B)1, and 2. This change has been necessitated by the recent hospitalization of Mr. Rinaldi.

j We have also attached a list of additional references (Attachment 2) that will be relied upon by NRC staff witnesses Donald F. Cleary regarding Sierra Club Contention I(B)7. These references supplement the list provided you in our letter dated December 19, 1986.

Finally, we would like to advise the Board and parties that in developing its l

testimony, the Staff determined that in the context of the testimony otherwise to be offered by the Staff, that the testimony of Robert W. Fell is not neces-sary to address the matters in controversy in this proceeding. Accordingly, the NRC staff panel addressing Sierra Club Contentions I(A)3 and 4; I(B)2, 8702200284 870210 PDR ADOCK 05000275 G PDR p

8 and 9; II(A) I thru 9 and II(D) I thru 9 will include the following witness-es: Howard Fishman', Hansraf Ashar, Walter L. Brooks and Amarjit Singh, Sincerely, Henry J. McGurren Counsel for NRC Staff cc: Service List 1

i I

'. gggGM Tiht[

Attachme@f YEB 19 Pl2;II HANSRAJ G. ASHAR DIVISION OF PWR LICENSING-A grf; fg OFFICE OF NUCLEAR REACTOR REGULATION 00C A,g ig PROFESSIONAL QUALIFICATIONS My name is Hansraj (Hans) Ashar. I am a Civil-Structural Engineer in the Enginecring Branch of the Division of PWR Licensing-A, U.S. Nuclear Regu-latory Commission. In my present position, I na responsible for the review of the adequacy of Seismic Category I structures.

I hold a Bachelor's Degree in Civil Engineering from the Gujarat University, India, and a Masters Degree in Civil-Structural Engineering from the Univer-sity of Michigan. Prior to joining NRC (then the AEC) in 1974, I had six-teen years of experience (beyond graduate school) in design and construction of bridges, industrial buildings and nuclear power plant struc-tures. During that period I had worked with several companies in the U.S.,

Canada and in W. Germany. I joined the AEC in the Office of Standards Development, later merged with the Office of Nuclear Regulatory Research, and stayed there until August 1986. During that period, I had developed several regulatory guides related to the design, construction and inservice inspection of nuclear power plant structures and managed the research relat-ed to the integrity of containments.

i I am a fellow nember of the American Concrete Institute and the American Society of Civil Engineers. I am a professional engineer in the State of Ohio and in the State of Maryland. I am an NRC representative on the following National Standards Committees: (1) ACI 349 Committee on Nuclear Concrete l

l

O

.- Structures; (2) American institute of Steel Construction Committee on Nuclear Specification; (3) American Society of Mechanical Engineers (ASME),

Section XI -

Working Group on Inservice Inspection of Concrete Containments.

Papers Published:

1. H. Ashar and D. Naus, " Overview of the Use of Prestressed Concrete in U.S. Nuclear Power Plant s" Nuclear Engineering and Design ,

North-IIolland Publishing Co. Special Issue on SMIRT-7, August 1983.

2. J. Dougan, H. Ashar, " Review of Inservice Inspection of Greased Ten-dons in Prestressed Concrete Containments", Proceedings of Structural Mechanics in Reactor Technology-7, August 1983.

I

I 9gcq7g

, g col # L N ,o g DEtG L. we; Attachment 2

'87 FEB 19 P12:11 Additional References Used CFH u. P 4Ay V

in the Testimony of Donald F. Cleary 00Wg;1jC U.S. Nuclear Regulatory Commission, Letter from H. E. Schierling (NRC) to J. D. Shiffer (Pacific Gas and Electric Company) dated May 21,1986 trans-mitting " Environmental Assessment by the Office of Nuclear Reactor Regula-tbn Relating to the Expansion of Spent Fuel Pools Facility Operating License Nos. DPR-80 and DPR-82 Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Unit Nos. I and 2) Docket Nos. 50-275 and 50-323."

U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, " Environmental Assessment Related to the Construction and Operation of the Surry Dry Cask Independent Spent Fuel Storage Installa-tion" Docket No. 72-2 Virginia Electric and Power Company, April 1985.

U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, " Environmental Assessment Related to the Construction and Operation of the H. B. Robinson Independent Spent Fuel Storage Installa-tion," Docket No. 72-3 (50-261); Carolina Power and Light Company, March 1986 U.S. Department of Energy, " Spent Fuel Storage Alternatives" Proceedings of an IAEA Advisory Group / Specialists Meeting Las Vegas, Nevada, November 17-21,1980, DOE-SR-0009.

U.S. Department of Energy, " Federal Interim Storage Lee Study for Civilian Spent Nuclear Fuel: A Technical and Economic Analysis", DOE /S-0023, July 1983 United Engineers and Constructors, " Energy Economic Data Base (EEDB) -

i Phase VIII Cost and Regulation Date January 1, 1986 Complete Concise j Printout for Model 148 - PWR (Median Experience Base)," unpublished com-j puter printout, January 1987 Pacific Gas and Electric Company, Letter from J. D. Shiffer (PGaE) to S. A. Varga (NRC) dated December 18, 1986, Enclosure 2 I

l i

I l

t