ML20247G908
| ML20247G908 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/07/1998 |
| From: | Cotter B Atomic Safety and Licensing Board Panel |
| To: | Shirley Ann Jackson, The Chairman NRC COMMISSION (OCM) |
| References | |
| COMSECY-98-010, COMSECY-98-10, NUDOCS 9805210007 | |
| Download: ML20247G908 (2) | |
Text
__ _ _ _ _ _ _
S
$?
hsW W mI%,
b' UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION COMSECY-98-010 ti, j
ATOMIC SAFETY AND LICENSING BOARD PANEL WASHINGTON, D.C. 205554001 9e6eeeoeeoeeeoeoeee,,e,,
RELEASED TOTHE PDR April 7,1998
$ _ datell l9[h$
(
initials e
l MEMORANDUM TO: Chairman Jackson B. Paul Cotter, Jr. l Judge FROM:
l Chief Administrative l
l
SUBJECT:
EXPERTS NEEDED FOR PLANT LIFE EXTENSION CASES l
L' Pursuant to our April 3,1998 discussion, I asked three technical members of the Panel, Judges l
Kline, Kelber and Murphy, to consider whether the ASLBP needs additional expert members to
. adjudicate the technical issues that could arise in the upcoming plant life extension cases.
. They concluded that:
1.
The existing members of either the full-time or part-time groups have l
sufficient expertise to resolve the majority of potential issues; 2.
Resolution of one class of issues, those related to material aging, such as polymers, and corrosion, could benefit from assistance in such l.
disciplines as materials science or materials engineering; and l
l 3.
A materials scientist would be of important assistance in the forthcoming high-level waste (HLW) case because of the recent developing interest in the long term integrity of waste packages under corrosive conditions.
l In reaching their conclusions, the judges consulted all of the full-time technical members, reviewed the expertise available from the full-time and part-time rosters, reviewed issues in the Diablo Canyon license recapture case, and reviewed applicable portions of the regulations governing plant life extension.
All of the technical members believe that our existing capabilities are adequate to handle plant l
life extension cases because of their similarity to reactor licensing cases. However, none i
disagreed that a materials scientist could be useful in these cases and would be helpful in the HLW case. The expertise currently available from full-time panel members is probably adequate to adjudicate license extension cases, but the absence of any one of several members would lead to a serious gap. Broad scale engineering expertise resides as well within i
several part-time members.'
\\0
'In addition, there are individuals on our Register of candidates qualified for appointment k
to the Panel with chemical engineering expertise which might include corrosion chemistry and
/h engineering.
L tG
[
9905210007 930407
'POR Corms MtCC CORRESPONDENCE PDR
- s '
l.
= The Diablo Canyin license recapture case i.pc:: its our most recent experience with these issues. Pacific Gas and Esctric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
LBP-94-35,40 NRC 180 (1994).'. In Diablo Canyon the applicant sought to extend its license for 13 and 15 years, respectively, for Units 1 and 2 to recapture the time lost between the grant of a construction permit and the issuance of an operating license. The issue raised was whether
~ the plant maintenance program was adequate to assure safe operation for an additional 13 to 15 years. This is an issue that could arise repeatedly in plant life extension cases. However none of the issues in this case fell outside the technical capabilities of the Board members.
l Consequently, the experience in this caso does not support the recruitment of part-time members.
The controlling regulation,10 C.F.R. Part 54, " Requirements for renewal of operating licenses for nuclear power plants," emphasizes aging. It requires an appiscation for license extension to contain an integrated plant assessment; current licensing basis changes; a time limited aging L
l' analysis; and an FSAR supplement detailing the programs !nr managing the effects of aging for
' the period of the license extension. Other regulations expected to be of significance to aging during these reviews include $ 50.48 fire protection; $ 50.49 environmental qualification;.
$ 50.61 pressunzod thermal shock events; $ 50.62 ATWS; $ 50.63 station blackout; and
$ 50.65 maintenance rule. These requirements generally support the value of having a specialist in materials science available for service.8 CONCLUSION l
l It appears that the Panel has the d;sciplines necessary to handle the issues in license renewal 8
cases. If a more specialized deceptine is needed, Licensing Boards have the authority to hire their own export.
It is equally clear that materials expertise will be needed for the HLW ?+;-::N: y case.
A&,e J,;,,$i, I recommend that the Commission authorize me to hire either a full-time or a part-time materials scientet.
cc: Commesioner Dicus Commissioner Diaz Commissioner McGaffigen i
i i
l 8While thermal annealing of the reactor pressure vessel ($ 50.66), may also be associated with license extension, it will be addressed in a separate licensing proceeding apparently not subject to an ASLB hearing I
- lt should be noted, however, that in terms of specific disciplines, we are thinly staffed and have little backup. In addition, five of the six full-time technicaljudges are eligible to retire.
l