ML20214M894

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 860721-25
ML20214M894
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/27/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20214M892 List:
References
50-424-86-64, 50-425-86-30, NUDOCS 8609110394
Download: ML20214M894 (1)


Text

c. ,

ENCLOSURE 1 NOTICE OF DEVIATION Georgia Power Company Docket Nos. 50-424 and 50-425 Vogtle License Nos. CPPR-108 and CPPR-109 The following deviation was . identified during a Nuclear Regulatory Commission (NRC) inspection conducted on July 21-25, 1986.

FSAR Section 9.5.4 states that the Vogtle fire protection quality assurance program will be integrated into the overall Vogtle quality assurance program as described by FSAR Section 17.1 for construction and FSAR Section 17.2 for operations. FSAR Table 3.2.2-1 Note "v" states that the quality assurance program to be applied to fire protection systems complies with NRC Branch Technical Position CMEB 9.5-1, Appendix A. FSAR Appendix 9B Section C.4 states that the Vogtle fire protection quality assurance program will be a part of the overall_ plant quality assurance program.

Contrary to the above, the following fire protection installation features are not being installed under a quality assurance program as stated in FSAR Section9.5.4:

Fire detection system Structural steel fire proofing Seismic gap penetration seals in fire barriers Please provide in writing within 30 days of the date of this Notice a description of corrective actions regarding this deviation, actions taken to avoid further deviations, and the dates when these actions were or will be completed.

FOR THE NUCLEAR REGULATORY COMMISSION Virgil L. Brownlee, Chief Reactor Project.s Branch 5 Division of Reactor Projects Dated at Atlanta, Georgia this mulay of Auaust 1986 8609110394 860827 PDR ADOCK 05000424 G PDR +