Notice of Deviation from Insp on 850225-0301
ML20127K222
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/11/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20127K213 List:
References
50-424-85-08, 50-424-85-8, 50-425-85-08, 50-425-85-8, NUDOCS 8505220072
Download: ML20127K222 (1)


See also: IR 05000225/2003001

Text

.I

.

. . , .

ENCLOSURE 2

NOTICE OF DEVIATION

Georgia Power Company

Docket Nos. 50-424 and 50-425

Vogtle

License Nos. CPPR-108 and CPPR-109

The fdllowing ' deviation was identified during an inspection conducted on

February 25 - March 1, 1985.

The Vogtle Final Safety Analysis Report (FSAR) contains the following

commitments to fabricate and construct safety-related structures in

accordance with AWS DI.1 welding requirements.

FSAR Section 3.8.3.2.1, Codes and Standards, lists American Institute of

Steel _ Construction (AISC) specification for design, fabrication and erection

of structural steel for buildings.

The AISC specification in turn

references AWS D1.1 for welding and inspection requirements.

FSAR Section 3.8.3.2.5, Industry Standards, states, in part, "... and

American Welding Society (AWS) are used to specify material properties,

testing, procedures, fabrication and construction methods." The implementing

. site document is Bechtel Power Corporation (BPC) specification X4AJ01,

Appendix VC, which lists AWS DI.1-1979 edition as the code of record.

Contrary to the FSAR commitments, the licensee's site specification X4AJ01,

Appendix .VC, excluded porosity as cause for rejection of safety-related

structural welds, with the result that on Feburary 27, 1985, the welds

connecting piece B5 to piece P201 on the Unit I containment pipe rack,

R0006, were accepted by quality control inspectors even though the welds

contained porosity clusters which were rejectable by AWS D1.1-1979

requirements.

,

Please provide, in writing within 30 days of the date of this Notice, a

description of corrective actions regarding this deviation, actions taken to

'

avoid further' deviations, and the dates when these actions were or will be -

completed.

.

Security or safeguards information should be submitted as an enclosure to

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

or 10 CFR 73.21..