Text
n
--
,
,
AUG 2 71986
Docket Nos. 50-424, 50-425
Li 'nse Nos. CPPR-108, CPPR-109
eorgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF DEVIATION
(NRC INSPECTION REPORT NOS. 50-424/86-64 AND 50-425/86-30)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Miller, Jr. and G. R. Wiseman on July 21-25, 1986. The inspection included
a review of activities authorized for your Vogtle facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection revealed no violation of NRC requirements.
However, certain
activities having safety significance appeared to deviate from a commitment to
the NRC.
The deviation and elements to be included in your response are
described in the enclosed Notice of Deviation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Isi
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
(See page 2)
8609110390 860827
"
$DR
ADOCK 0500
4
I
..
.
-
.
Georgia Power Company
2
g g 7g
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
pc.w/encls:
/J.P.O'Reisly,SeniorVicePresident
Nuclear Operations
/R.E.Conway,SeniorVicePresident&
Project Director
/D.O. Foster,VicePresident, Project
Support
/P. D. Rice, Vice President, Project
Engineering
R. H. Pinson, Vice President, Project
Construction
/J.T.Beckham,VicePresident&
General Manager - Operations
/8.A. Thomas,VicePresident,
/ . Licensing
S. Read, General Manager,
Quality Assurance
C. W. Hayes, Vcgtle Quality
j Assurance Manager
/W. C. Ramsey, Manager -
v/ . Readiness Review
G
B. Bockhold, General Manager,
Nuclear Operations
/L. Gucwa, Manager, Nuclear Safety
VN.andLicensing
H. Googe, Project
Construction Manager
[E.D. Groover, Quality
Assurance Site Manager -
Construction
/J.A. Bailey,ProjectLicensing
Manager
[G.F.Trowbridge,Esq.,Shaw,
,
'
Pittman, Potts and Trowbridge
l
/B. W. Churchill, Esq. , Shaw,
'
Pittman, Potts and Trowbridge
./E. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
/J. E. Joiner, Troutman,. Sanders,
,
Lockerman and Ashmore'
'
MJ.G.Ledbetter, Commissioner,
'
Department of Human Resources
,
l
l
(cc w/encls cont'd - see page 3)
,
\\ ..
l
.
.
Georgia Power Company
2
AUG 9 " E
..
cc w/encls cont'd)
C. H. Badger, Office of Planning
-
and Budget
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
/ Council
D. C. Teper, Georgians Against
j Nuclear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
/ Dr. O. H. Paris, Administrative Judge
'
Atomic Safety and. Licensing Board
,
Panel
/G.A.Linenberger,Jr., Administrative
Judge Atomic Safety and Licensing
, j Board Panel
V B. P. Garde, Citizens Clinic, Director
'
Government Accountability Project
fccw/encls:
. Reis, GS0
. M. Hill, IE
M. Miller, NRR
/f Brach, EDO
M Sinkule, RII
v'E. Christnot, RII
MRC Resident Inspector
Document Control Desk
State of Georgia
l
i
.
1
3
RII
-
RII
RII
RII
RII
3,
- gt)
RII
Q,h
& cf
l'
,
LBrownlee GJen$ns
y WMiller:bhg
IConlon
VP rpiera M~7/2c/86
ggfj86
A(Herdt/d/86
l /p/86
g/[/86
1
S'It/86
V
I
6
1
..
._
_
.
-