BECO-87-007, Responds to NRC 860106 Request for Submittal Date for Revised Summary Rept for Dcrdr.Supplementary Summary Rept Will Be Submitted,Based Upon Rescreening Plus Addl Planning & Budgeting within 4 Months Following Refueling Outage 7

From kanterella
(Redirected from ML20212P336)
Jump to navigation Jump to search

Responds to NRC 860106 Request for Submittal Date for Revised Summary Rept for Dcrdr.Supplementary Summary Rept Will Be Submitted,Based Upon Rescreening Plus Addl Planning & Budgeting within 4 Months Following Refueling Outage 7
ML20212P336
Person / Time
Site: Pilgrim
Issue date: 01/20/1987
From: Lydon J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-87-007, BECO-87-7, TAC-59329, NUDOCS 8701300646
Download: ML20212P336 (2)


Text

a

  • TAP I.D.I.2 gjr NUREG-0737 aosnmaasm General Offices 800 Boytston Street Boston, Massachusetts 02199 James M. Lydon Chief Operating Officer January 20, 1987 BECo 87-007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293

Subject:

Detailed Control Room Design Review (TAC 59329)

Dear Sir:

By letter of January 6, 1986, NRC requested a submittal date for the revised Summary Report for Detailed Control Room Design Review (DCRDR). Boston Edison representatives discussed this with you during your visit to Pilgrim Station on March 4, 1986 and with Mr. Paul Leech in a meeting on April 18, 1986. As explained in those meetings, it is our intention to re-screen the iluman Engineering Discrepancies (HED's) using a more detailed process than was previously used. This new process is being employed to provide improved documentation of the screening criteria and results, establish a more quantitative basis for setting priorities, and to incorporate cost-effectiveness considerations into the process.

Consequently, we will be able to submit a supplementary summary report based upon the re-screening plus additional planning and budgeting. The report will be submitted within four (4) months following the end of Refueling Outage 7 and will include:

a) Implementation scope and schedule for identified corrective actions.

b) In the case of HED's or groups of HED's which involve complex cumulative and interrelated design solutions that will not have been resolved by the time of the supplemental report submittal, the report will identify the scope and schedule for resolution.

c) Scope of HED's for which no corrective action will be taken ard the basis for that decision.

d) Response to open items from the NRC Safety Evaluation Report of May 16, 1985, t

0b 0

B701300646 870120 PDR P

ADOCK 05000293 PDR (I) (

r BOSTON EDISON COMPANY U.S. Nuclear Regulatory Commission Page 2 As can be seen, the scope of this is nearly a complete redoing of DCRDR.

Therefore, BECo believes that the NRC review of this is part of multiplant action (MPA) F-71, and not a plant specific review of the Pilgrim submittal; we request that the fee determination be made in accordance with guidelines for multiplant actions.

We trust this information is responsive to your concern. If you wish further information on this please contact us.

Very truly yours,