Forwards Suppl Info Pertaining to TS Amend Re Pressure Temperature Curves,Per 980109 Telcon
ML20198N845
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 01/13/1998
From: Stanley H
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9801210232
Download: ML20198N845 (5)


Text

Onnn,onrrahh lavin (hmp:ny

, 14M Opun Plu e

  • l h m nrrn Grove,11 (hil 5 5701 January 13,19N

' U. S Nuclear Regulatory Commission Washington, D. C 20555 Attention: Document Control Desk

Subject:

Supplemental Inf ormation Pertaining to Technical Specification Amendment Regarding Pressure Temperature Curves llyron and Hraidwood Nuclear Power Stations NitC Docket Numbers: 50-454. 50-455. 50-456 and 50-457

References:

1. J. Ilosmer letter to ti.e Nuclear Regulatory Commission dated May 21,1997, transmitting Technical Specification Amendment Request. ,
2. J. Ilosmer letter to the Nuclear Regulatory Commission dated November 18,1997, transmitting Supplement to Technical Specification Amendment Request.
3. J. Ilosmer letter to the Nuclear Regulatory Commission dated De, ember 3,1997, transmitting WCAP 14824. Rev. 2.
4. December 10,1997, December 12,1997, and December 30,1997, Teleconferences between the Commonwealth Edison Company and the Nuclear Regulatory Commission Regarding the Pending Technical Specification Amendment.
5. 11. Gene StarJey letter to the Nuclear Regulatory Commission dated January 8,1998, transmitting Response to Request for Additional Information Rege.rding the Pending Technical Specification Amendment.
6. Janumy 9,1998, Teleconference between the Commonwealth Edhon Company and the Nuclear Regulatory Commission Regarding the Pending Technical Specification Amendment.

Reference I transmitted the Technical Specification Amendment regarding the Pressure Temperature Curves for Braidwood and Ilyron Units 1 and 2. Subsequently, Reference 2 transmitted a Supplement to the Technical Specification Amendment Request. Reference 3 transmitted WCAP-14824, Rev. 2 " Byron Unit I lleatup and Cooldown Limit Curves for Normal Operation and Surveillance Weld Metal Integration for Byron and Braidwood." During the Reference 4 Teleconferences and subsequent teleconferences, the Nuclear Regulatory Commission (NRC) questioned this material, in response to 4 \

M*M M%em \20 U \

e toi. m a .n ru n.a m t[ '

llllll l llllllllll l A (fnkom Conipany

'U ..S NRC 2 January 13,1998 those questions the Commonwealth Edison Company (Comed) provided Reference 5. In order to complete their review of the amendment request, the NRC initiated the Reference 6 teleconference. This letter is providing the additional information requested in that call.

Please address any questions that you may have on this correspondence to this oflice.

Sincerel', [

/</ /

l$.

PWR Vlec President Attachment ec: Ilyron/llraidwood Project Manager - NRR Senior Resident inspector-Ilyron Regional Administrator-Rill Omcc of Nuclear Safety-IDNS T

L nla bybed agrp pilnai2 dx2

- A1TACilMENT

. Question 1: Provide an example of the LTOP PORV setpoint calculation, including unit specific instrument uncertainties and heat and mass injection PORV overshoots.

Response

References!

1. H. Stanley Letter to NRC dated January 8,1998, transmitting PTLR Response.
2. Westinghouse Letter CAE-96-106,
  • Commonwealth Edison Company Byron Units 1 and 2 LTOPS Setpoints Based on 10 and 12 EFPY P/T Limits," January 17,1996.
3. Westinghouse Report,"Setpoint Program Determination for the Westinghouse Overpressure Mitigation System in the Byron /Braidwood Plants," L.E. Engelhardt, October 1982.
4. Byron Calculation No. BYR96 293,
  • Channel Accuracy for Power Operated Relief Valve (PORV) Setpoints and Wide Range RCS Temperature Indications (Unit 1 Original Steam Generators and Replacement Steam Generators)," February 27,1997.

The following information is provided to clarify and augment the responses to questions 3 and 13 provided in Reference 1. All data presented here are for the '

Ilyron Unit 1 LTOP setpoint determination. The LTOP setpoints for Byron Unit 2 and liraidwood Units 1 & 2 are detennined in a similar manner using unit specific instrument uncertainties. Table 1 below presents the data used to determine the pressure setpoints wr the most limiting heat injection (111) eases and the mass injection (MI) eases. The Appendix G pressure requiremen'. for greater than or equal to 200 'F has been conservatively limited to 800 psig to protect the PORV downstream piping. The calculated Appendix 0 pressure limit is actually 1483 psig for temperatures greater than 180 *F, therefore the PORV downstream piping pressure restriction is limiting. Since the 10% pressure relaxation pennitted by Code Case N-514 and the 1996 Addenda of ASME Section XI, Appendix 0, was developed for the reactor vessel, the 10% pressure increase was not applied when the pressure was limited by the piping,800 psig pressure limit. Also, when the pressure is limited to 800 psig by the PORV downstream piping, the pump AP is O psig because the PORV downstream piping is not subject to the dynamic and static pressure head that exists between the RCS pressure sensors and the RPV core midplane. The values for the heat and mass injection overshoots listed in Table I were determined by Westinghouse in Reference 3.

k As b>bwd app pdtral2 dx3

. __ ,_ _ . - _ ~ . . , . . ..-_ - __.

l Table 1: Byron Unit 1 Data for LTOP Setpoint Determination l App.G Setpoint HI Shifted MI RCS without CC Pump without PORV Hi HI PORV MI Temp Margin N 514 AP Over Over Setpoint Setpoint Over Setpoint (F) (psig) (psig) (psi) shoot shoot (psig) (psig) shoot (psig) i (Note 1) (Note 2) (pglg) (pgl) (Note 3) (pgl) 70 621 683. 34. 649. 11. 638. - 29. 620. ,

100 621 683. 34. 649. 21. 628. - 29. 620.

120 621 683. 78. 605. 28. 577. 638. 29. 576.

621 683. 78. 605. 36. 569. 628. 29. 576.

_150 200 800 800. O. 800. 52. 748. 569. 28. 772.

250 800 800. O. 800. 73, 727. 748. 28. 772.

300 800 800. O. 800. 88. 712. 727. 28. 772.

Note 1: For 200 *F and above. Appendix o pressure is significantty greater than the 800 psig limit protecting the downstreo n PORV piping, e g 1483 psig @ 180 *F.

Note 2 Pump AP is set to O psi when pressure is limited to 800 psig .

Note 3 HI setpoint pressures are shifted to account for she assumed 50 *F temperature differential between the RCS and the steam gene ator The LTOP setpoints are determined using the smallest of the HI, shifted HI and Mi setpoints and subtracting the instrument uncertainties. Table 2 below presents the minimum HI and Mi setpoints, the Byron Unit 1 instrument uncertainties, and the LTOP setpoints for selected RCS temperatures.

Table 2: Byron Unit 1 instrument Uncertainty and LTOP Setpoints RCS Setpoint Byron 1 Setpoint Byron 1 Temp. No Instrument with PCV-456

(*F) Instrument Uncertainty Uncertainty Setpoint Uncertainty 1PB- (Note 2) (Note 2)

(Notes 1,2) 0406CID 70 620. 106. 514. 514.

100 620. 106. 514. 514.

120 576.(569.) 107. 469.(462.) 462.

150 569. 107. 462. 462.

200 569. 107. 462. 462.

250 727.(712.) 108. 619.(604.) 604.

300 712. 108. 604. 604.

Note 1. These setpoint values are the minimum values from the Hi, shifted HI and Mi setpoints presented in Table 1 above Note 2 These setpoints have +ere conservativety lowered .'or 120 *F and 250 *F to the values in the parentheses The PCV-456 setpoints have been conservatively lowered for temperatures of 120 'F, and 250 F to simplify the PORV curve into three constant temperature ranges, t ni. hwa veron.u m

Qt ostion 2: Provide additional explanation of the " average of averages" approach used in the best estimate chemistry calculation for

. weld wire heat No. 442002.

i

Response

References:

1) Framatome Technologies Inc. (FTI) letter INS 97-2526, June 30,1997
2) FTl letter INS 97-4954. December 17,1997
3) WCAP-14824 Revision 2, Table 2, with errata (CAE 233/CCE 97 316)

The

  • average of averages" approach is used as a weighting process, since the  :

number of measurements from some separately identified sources, such as the Byron Unit 1 and Unit 2 surveillance blocks, is much greater than from other sources, such as the individual weld qualification blocks.

Comed believes that the " average of averages" approach used in WCAP-14824 i Revision 2, in which (for a given weld wire heat) all available test results from

  • separate and distinct test or production welds are averaged, and the resulting values for separate and distinct test or production welds subsequently averaged to obtain the best estimate value, provides the most appropriate estimate of weld chemistry . This approach eliminates the inappropriate weighting effect which widely varying numbers of analyses can have when performed on individual weld blocks. Also, although the effect of FTl's " coil weighting" approach is nil due to the large spool size FTl assumes, Comed believes that a coil weighting ,

approach is not a fundamentally sound basis for evaluating weld chemistry, due to the complete lack of documentation of coil changes or intra-coil splices which may have occurred or been present during production of welds.

k nla by bed agtp ptinai2 doc.5