MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
.
(
INSTRUCTCN ISSUE TEXAS UTILITIES GENERATING CO.
NUMBER t
DATE PAOI REVISION CPSES l
i
!QI-QP-11.0-15 :
2 1 of 5 l
SEP 2 01953 i
I l
{ PREPARED BY: # -
- -p 7-e*C-d 3 VERIFICATION OF
~
C/ ~;
OUT APPROVED BY: I'k W
9
!f I
/Qf '
'[>
APPROVED BY:
/,.
1
/[ j DATE I
1.0 REFERENCES
I l-A Gibbs and Hill Specification 2323-55-9, " Concrete" 1-B CP-QP-18.0, " Inspection Reports" 1-C CEI-25, " Grouting Pi pe Support Wall and Ceiling Plates" g
l 1-D QI-QP-11.0-6, "pnggipn of Grouting" t
ra.
1-E CP-QP-15.0, "T[gging Sy(temi :,.
l i
%W &
l*..,
-,- pa l
2.0 PURPOSE AND SCOPE L
~-
g.g The purpoce of this instruction is to provide the cMteria to be-used when performing verification of seismic wall and ceiling mounted component support base plates located in j
Seismic Category I Buildings for grouting in accordance with the requi rements of Reference 1-A.
Floor mounted base plates receiving dry pack material or grout do not fa M
i within the scope of this instruction.
1.
3.0 INSTRUCTION l
1 3.1 BASE PLATE GROUTING AND SHIMMING i
Component support base plates mounted to concrete surfaces I
shall not exceed a 1/16" gap between the base plate and concrete for a minimum of 80% of the base plate area. The gap between the base plate and concrete for a maximum of 20". may exceed 1/16" but at no point shall the gap exceed 1/2".
The gap shall be measured from the periphery of the l
baseplate (See Attachment 1).
l Shim material may consist of steel shim plates or washers of a size necessary to allow proper Hilti bolt torquing without base plate deformation.
The grout fill holes shall be 1/4" diamater and shall not be drilled within 1 inch of a O
concrete anchor.
Additionally, the grout fill holes shall C) be located outside the bolt hole pattern, i
~
' coa eM2020S40 BM FOIA ppa PDR GARDEBS-59
(
INSTRUCTION ISSUE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.
I
(
SES QI-QP-11.0-15 2
2 of 5 SEP 2 0 1993 j
i i
l i
NOTE:
Floor mounted component supports that are not l
flush mounted requi re shimming and grouting and i
shall be verified by Quality Control inspectors per Reference 1-0, 3.2 DOCUMENTATION j
Inspections shall be recorded on an Inspection Report in i
accordance with Reference 1-B.
This Inspection Report may be included as attributes on an Inspection Report generic to a specific hanger inspection instruction (i.e., Class 5 pi pe suppo rts, condui t supports) as outli ned in that i
specific instruction.
l Hangers inspected by the craft as required per Reference 1-C do not require a Bearing Inspection Report (Attachment 2) written for grout placement purposes.
I All unsatisfactory conditions shall be documented on an IR and/or a NCR per Reference 1-B.
IR's shall be processed O
as directed by the QA/QC Supervisor.
A reject tag may be applied to "unsat" items per Reference 1-E.
During Room Turnover activities, QC inspectors may complete I'
a "walkdown" of base plates to veri fy adequate support bearing and document on Attachment 3.
?
l V&
Pennsee.1 MMM
...J
~
L-
(
1 4
! INSTRUCTION REVtSICN ISSUE
! TEXAS UTILmES GENERATING CO. l PAGE CPSES
{SEP 2 0 1983 QI-qP-11.0-15, 2
3 of 5 r
ATTACHMENT 1 EXAMPLE: BASE PLATE 10" x 10"
\\
h
%n
%v n.
w' M
s K e xxxxxxxxxxxxx%
l 2
i Base Plate 100 inches i
807, 1/16" gap I
Cross-hatched area may be up to 5" gap as long as
~
t total area does not exceed 20 sq. inches.
D!
TUGCC CA
.. ~ - -
~,
--_n,
.. -. ~... -,, - -,,,,,,,.. - -, - -
(;
INSTRUCTION ISSUE r
REVISION PAGE O.
NUMBER DATE I TEXAS UTluTIES GENERATING CO.
l CPSES l
01-0P-il.0-15 2
SEP 2 0 1983 4g s I
ATTACHMENT 2
- cw.nco,e atu s Esu issc~asc sizzcu
- s. m
-r INSPECTION REPORT an ITEM CasGJtipT.CM
]GL% rmT.64 30 3T57EM / ITNuGTym [ MEhaT:GN r
?.
4 sas:..sc.
. ac..
2 323-SS-9
,I g v e.c coc. a arv. a enames so.
a msamma Gn rm couin..oc T. mo.
se 01 0p.11.0 15 Rev.
a CI"asE!b'c*m CPagfyrTa Ogitpet
&,g'yerio, C P*t&,
rroa ma p. ensui. s b iNSPEC*fCN COMPLETEo, AL&. aP86;Ca4LE ITEMS saftsFaCTCAT C insatCnon comutto, unsariwactont iTtmo usito.estow oc ins y ;rcA art
'C INSPECTION ATTRIBUTES ca?t a,
1.
I Gac does not exceed 4" at any coint betwea-ha'episte I
I l
- 1. d es,,e
+.,,,<.,..
o...
, 1.
I I
I i
l l i 1
2.
!Gao coes not exceed 1/16" for 80% or more of baseplate l' l l l
l bearino surface Pan. 3.1.
l i I l
4 l
l Il l
L i(Mas iastalled.
Dan. 1.1 l
l I
I I
Ii i
l l l l
I I i l i
I I
l l
i i
t i f I
s i i l
i I l l
t i ! i l
I I I i i
l i I i i
i l i l I
l l Ii l
l I
e ii f
I l l i l
nemaans (chras, sacs,tTeJ 1
"4 3 l 1.R. CLOSC ME n
i isieh m e i
=
8 i
oc wtSPt:*C4 g
N aman mm
.-,.-w*---
i 7
i i
I i
l 1 INSTRUCTION I l
ISSUE
{ USD DATE PAGE TEXAS UTILITIES GENERATING CO. j NUMBER CPSES SEP 2 0 1983 OI-QP-ll.0-15 2
1 5 of 5 i
ATTACHMENT 3
- MmNCNE AEAK STEAM E6E;7hc STAOCN W
M g'
f lNSPECT10N REPORT le
.rtm ot.cmiet.o=
czarmc41.c=
- purgw e sr=wcmat xs.c. arc.
e 1.
M 3PWM e nEV W R OOC. 4 agv e gnan(.E go setasunt gm rg5T gswap.ccigT,gg.
sl s!
Of-OP-11.0-15 Rev s
t l
Oi,,;;g>A avs;;3sr=- aegg-gg a r:so, O P"f;&,
i asp. nean.ts I
C asn: rom ::erres au. escasu irtus sansn: rent O sm:no= co-ario. w eariseacto v irs = unrio sc.o=
.c g,g,",y,g INSPECTION ATTRIOUTES a;
3 cart 5
3
=
2
.i l
ll I
l 1.
ISEISMIC SUPPORTS IN ABOVE REFERENCED AREA SATISFY lI!
I IBEARING REQUIREMENTS PER PARAGDAPW 3.1.
I !i I
I II I
3 i
i l
ll I
i li I
I ii i
{
l I
Ii l
l II e
i li I
l I I I
i
'l I
l l-1i li i
iI j
I I
'I I
I i ! i i
f I
l i li l
l i
i l l l t
i I
IlI i
I i i l i
I i l l I
a=
is. m es.e m 1
(
- All inspectors performing room verification to sign this IR.