Rev 0 to Procedure QI-QP-11.0-3, Concrete Placement Insp
ML20137G492
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/12/1978
From: James Smith
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML17198A292 List: ... further results
References
FOIA-85-59 QI-QP-11.0-3, NUDOCS 8512020204
Download: ML20137G492 (4)


Text

.

(>

t IN Im E

TEXAS (RILITIES GENERATING CO.

REVISION PAGE CPSES QI-QP-l l. 0- 3 0

7-12-78 1 of 4

[

4_ /4-7E CONCRETE PLACE:iENT INSPECTION PREPARED BY:

h y

Date APPROVED BY

_ dar d!/(ehB Date

\\

1.0 REFERENCES

g 1-A Specification 2323-SS-9, " Concrete" I,}'

%I h,"

l 2.0 CENERAL IW j 2.1 PURPOSE AND SCOPE To delineate the methods used by QC Inspectors to assure that concrete placement activities are accomplished ir accordance

(~~}

with Reference y.} purp gg

't d '%

hIh

)." l' [

3.0 INSTRUCTION 3.1 PRE-POUR PLANNING The QC Inspector will verify that the pre-planning provisions of Regulatory Guide 1.55 are being complied with. 'Ihis spe-cifically means a demonstrated awareness that items such as cleanliness, availability of persongel and placing equipment, placing sequence and alternate construction joint locations have been provided for.

On containment wall and dome placements, or those considered complex by the Civil Inspection Supervisor, the planning shall be in written form.

3.2 INSPECTION REQUIREMENTS 3.2.1 Pr ior to Placement Immediately prior t'o placement, the QC Inspector shall verify the following items:

a.

Pour card sign-off by Crafts and Engineers.

(*\\

V 8512O20204 051106 PDR FOIA GARDEB S-59 PDR TUCCO QA

I

(..

INS Im TEXAS UTILITIES GENERATING CO.

REVISION PAGE QI-QP-11. 0-3 0

7 12-78 2 of 4 b.

Formwork for stability, line and grade, tightness of joints and cleanliness.

c.

Dimensions of seismic air gap are in compliance with draw-ings, and gap is protected from intrusion of foreign ob-

jects, d.

Proper installation of expanded metal construction joints.

e.

Construction joints clean and thoroughly wetted with no standing water.

f.

Adequacy of placing personnel and equipment.

3.2.2 During Placement During placement, the QC Inspector shall verify the following items:

a.

Placing sequence conforms to the pre-pour plan.

O b.

Placement rate ensures proper integration with preceding lift.

c.

Concrete lifts do not exceed 18".

d.

Placement technique causes minimum segregation.

e.

Vibrators not used to convey concrete more than three feet.

f.

Vibrators penetrate approximately four inches into pre-ceding lift.

g.

Vibrators operate at minimum 8000 I.P.M.

(Document on inspection report) h.

Record four concrete temperature measurements on inspection report.

i. Trucks discharged before 45 minutes if ambient temperature above 85 F., or 90 minutes if approved by Engineer.

J.

Concrete does not contact aluminum.

k.

Concrete placed to proper grade.

()

1.

Application of required finish.

TUGC0 QA

. _ ~.

( _

[

IN3 I

TEXAS UTILITIES GENERATING CO.

REVISION PAGE

]I-QP-11.0-3 0

7-12-78 3 of 4 3.3 DOCUMENTATION OF INSPECTION Verify inspection to provisions of this instruction on the Inspection Report (Figure 1) and file with the QC Documen-tation Supervisor.

D e

b

'O TUCCO QA

I

~

(

(

TNSUTILITIESGENERATINGCO.

INSTRUCTION ISSUE SI GE Ntf4BER DATE CPSES fs i

QI-QP-11.0-3 0

7-12-78 4 er 4 FIGLPE 1 COMANCHE PEAx STEAM ELECTRIC S T ATION errt cw INSPECTION REPORT p

'T(es c($4A.pl@es

@ m TaF4aM4 hQ sf 5f EM / 8 T RwC Twe( (K $.GanaTagie r

1.

e 3 REC hG My itU GC Ooc. e aEv a casassGE no usalumE Og TLIT tou.e CENT. no e

7 e

&e N'c',

&,105J;),gra O ri'3We'l,'30 O rg,,,,,,

O P,ttg, noe etsu6is O =mero. co-te rro. att aavca.6 ein.s satsacto.r D ias ecto. co.uvro. u=sarivacioar irt=s tisrco orto.

'"5""

.o ettu ao INSMCTioit ATTRIBUTES

.4,,$ y, 8

2 catt i

ir

  • 5 n

j l

a nemaans spra,setts,ttcJ E

gA, CLOSED Q

I *

Imenain*e

?

oc m cson m

n TUCCO QA

- -.