Forwards Insp Repts 50-445/75-13 & 50-446/75-13 on 751118-21 & 1201.Noncompliance Noted
ML20137F664
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/16/1975
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Brittain P
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML17198A292 List: ... further results
References
FOIA-85-59 NUDOCS 8512020069
Download: ML20137F664 (3)


Text

_

m _.

_

.

_

...

_

&;

e.atutekbn

_

m.-

-

.

.

.

..,

.

+

I

.'

UNITED STATES

'

,,

l

'

NUCLEAR REGULATORY COMMISSION

.

,

office oF INSPECTION AND ENFORCEMENT REClON IV

$11 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON TEXAS 76012

.

'

.

December 16, 1975

.

i.

'

/

.

.

., -

,

,

~

.

,

'

<

,

.

'

.

Texas Utilities Generating Company'

Docket Nos. 50-445

.'

t

.

ATTN: Mr. Perry G. Brittain 50-446

,

President

"

'

-

.

'

'

,2001 Bryan Tower

-

,

Dallas, Texas 75201

.

,.

-

Gentlemen:

j.

..

-

This refers to the inspection conducted by Messrs R. C. Stewart and

'W. G. Hubacek of this office on November 18-21, and December 1, 1975, of l

activities authorized by NRC Construction Permit Nos. CPPR-126 and 127

'

i for the Comanche Peak facility, Units 1 and 2, and to the discussion of'the

'

findings held by the inspectors with Mr. H. C. Schmidt and other members of your staff at the conclusion of the inspection.

Areas' examined during the inspection and our findings are discussed in the enclosed inspec, tion report. Within these areas, the-inspection consisted

-

.

cf selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

' '

During the inspection it was found that certain activities under your

.

license appear to be in noncompliance with Appendix B to 10 CFR 50 of the

'

NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The item of noncompliance and reference to the pertinent requirement is

identified.in Section I of the summary of the enclosed report.

,

+

We^have also examined actions you have taken with regard to previously identified unresolved items.

The status of these items is identified in.

Section IV of the summary of the enclosed report.,

.

-

e

%g

'

-

.

,

8512O20069 851106 PDR FOIA GARDEB S-59 PDR s

e

h I

_

_

... -.

.... - - - -- -

---

.

ueur--T Y~

P

"-wt

-

v dyvTv vgvrw-m-we-v T-w-y-v-w--w-r

-+y-w es-vw'

-

e-

-w-w---ww w w*

-W-www-w-'*w

-+

--

vr v -- - * - * -

w--

e

.

.

....

.

.

.

- - _. - - -

.

._

.

'"

.

,,,,__

.

_... _ _ _. _ _. _. _.

..

--

-

't'

'

'

'

,

,,

.

.

.

l

',,

..

.

'

.

Texas Utilities Generating Co.

-2-December 16,,1975

.

'

This notice is sent to you pursuant to the provisions of Section 2.201 i

cf the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

.

Regulations. Section 2.201 requires you to submit to this office, within

'

30 days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2) corrective' steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

,

j In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter and the

.

enclosed inspection report will be' placed in the NRC's Public Document Room.

.

If the report contains any information that you believe to be preprietary,

'

it is necessary that you submit a written application to this offits, within'

20 days of the date of this letter, requesting that sch information be with-

~

held from public disclosure. The application must include a full statement

,

of the reasons why it is claimed that the information is proprietary.

The

'

~-cpp11 cation should be prepared so that any proprietary information ide'ntified i

is sontained in an enclosure to the application, since the application.rithout-

the enclosure will also be placed in the Public Document Room. If we do not hear from you in this regard within the specified period, the report will be

!

placed in the Public Document Room.-

Should you have any questions concerning this inspection, we will be pleased l

to discuss them with you.

-

'

!

Sincerely,

hhhw

-

  • C. L. Madsen, Acting Chief,

-

j Reactor Construction and Engineering Support Branch Enclosure:

!

-

IE Inspection Report Nos. 50-445/75-13 50-446/75-13 i

.cc: Texas Utilit.ies Generating Company

.

ATTN:

R. W. Caudle, Project Manager

!

'

2001 Bryan Tower

-

Dallas', Texas 75201

!

'

.

e

i i

,

!.

'

g

. _ _,,, _ _,

_

...

_.. - -..

- -. -

. '

..__ _ _, _

.

_

-

.. _ _ _ _ _. _. _., -.

..

..

...

....

- -

..

.

.

-

.

-......

. \\_~/

... _ _ _.. _ _ _..

...

...

.

.

.

i - -

..

... _. _. _

s

.

\\

'

'

.

.

.

.

,

.

l

.

.

Texas Utilities Generating Co.

I 50-445 & 446/75-13

.

bec: w/0 enc 1.

.

H. D. Thornburg, IE:HQ (1)

-

C. W. Roy, IE:HQ (1)

-

,

IE:HQ (1)

'

.

,

DR Central Files (1)

.

L:HQ (4)

_ !

l PDR:HQ

-

'

'

  • ' -

'

Local PDR i

TIC i-

,

,

NSIC

.

'

Texas Department of Health Resources

~

,

,

.

I

'

e.

["

!

-

.

i

,

!

.

I e

.

.

S e

I e

e

.

e

$

e

-

-m.

,._-

.,

-_a

-.,-,.

_ _.,

-

d

..