Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARRBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed1990-09-10010 September 1990 Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range1990-08-30030 August 1990 Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.211990-08-28028 August 1990 Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment1990-08-28028 August 1990 Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-9003011990-08-28028 August 1990 Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 9009291990-08-22022 August 1990 Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified1990-08-10010 August 1990 Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1990-08-0101 August 1990 Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting1990-07-30030 July 1990 Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank1990-07-26026 July 1990 Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-161990-07-13013 July 1990 Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed1990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 19901990-06-29029 June 1990 Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs1990-06-28028 June 1990 Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads1990-06-26026 June 1990 Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon1990-06-26026 June 1990 Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License1990-06-26026 June 1990 Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 19901990-06-22022 June 1990 Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 ML20043G2211990-06-14014 June 1990 Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys ML20043G8191990-06-12012 June 1990 Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5 ML20043E6531990-06-0606 June 1990 Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility ML20043F9801990-06-0606 June 1990 Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately ML20043D5591990-06-0101 June 1990 Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs ML20043D5421990-06-0101 June 1990 Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. ML20043D5401990-06-0101 June 1990 Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101 ML20043D2371990-05-31031 May 1990 Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow ML20043C8011990-05-29029 May 1990 Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.) ML20043B4231990-05-21021 May 1990 Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program. ML20043A4271990-05-14014 May 1990 Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts ML20042G7031990-05-0909 May 1990 Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators ML20042F9741990-05-0707 May 1990 Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized Valves ML20042G2521990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E3781990-04-0606 April 1990 Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for Acceptability ML20042D8351990-03-30030 March 1990 Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power Sources ML20042E3501990-03-30030 March 1990 Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug Testing ML20012F1571990-03-28028 March 1990 Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01 ML20012F1551990-03-28028 March 1990 Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels ML20042D7041990-03-21021 March 1990 Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage ML20012E0001990-03-20020 March 1990 Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2) ML20012C7901990-03-16016 March 1990 Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21) ML20012C9931990-03-15015 March 1990 Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting ML20012C7881990-03-15015 March 1990 Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock ML20012C0381990-03-0909 March 1990 Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201 ML20012A4431990-03-0101 March 1990 Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits ML20012B3001990-03-0101 March 1990 Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26 ML20012A9161990-02-28028 February 1990 Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading ML20011E8431990-02-0909 February 1990 Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment ML20011E6741990-02-0909 February 1990 Responds to Violation Noted in Insp Rept 50-458/89-41 on 891101-15.Corrective Actions:Procedure Which Would Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys Being Developed ML20011E1531990-01-29029 January 1990 Provides Currently Identified Outage & nonoutage-related Activities to Update NRC of Util Licensing Activities in Order of Priority ML20006C0061990-01-25025 January 1990 Forwards Notification of Nuclear Liability Insurance Coverage for Facility 1990-09-10
[Table view] |
Text
.
O O P O S T O F FIC E GOx 2951
AREA C0DE 409 838 6631 August 2, 1985 RBG - 21773 File No. G9.5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.G. 20555 Dear Mr. Denton River Bend Station - Unit 1
, Docket No. 50-458 Enclosed for your review is Gulf States Utilities Company's proposed revisions to the River Bend Station Technical Specifications.
These changes as identified in Enclosures 1 and 2 are editorial comments or typographical errors that were noted in reviewing the July 24, 1985 River Bend Station " FINAL DRAFT."
Sincerely.
~
J. E. Booker Manager-Engineering Nuclear Fuels & Licensing River Bend Nuclear Group JEB/WJR/JEP
~
8509100267 850002 I PDR ADOCK 05000450 g A PDR l
t ENCLOSURE 1 1
I l
4 i
l Pane No. Description / Justification vi Typo Change page number to 3/4 3-107 for Section 3/4.3.9.
xiv Editorial Delete the words "Drywell and" under Section 3/4.6.1 to be consistent with 3/4.6.1.9.
xx Typo Change page number to 6-19 for Section 6.9.2.
Typo Change page number to 6-19 for Section 6.10.
xxi Typo Change page number to 6-22 for Section 6.13.
Typo Change page number to 6-23 for Section 6.15.
3/4 3-39 Typo Change Footnote ** instrument zero level to EL 98'6" not EL 96'6".
3/4 3-62 Typo Change Item 5.a (LISN602B) to 18.00" not 18,00".
3/4 3-99 Editorial Change the word "is" to "are" in Footnote *.
3/4'3-105 Editorial Add the designation "(NBS)" in Table Notation (2).
3/4 5-3 Typo Change the word "useage" to " usage" in Action g.
3/4 6-2 Editorial In GSU's review of editorial consistency between technical specification sections,' Specification 3/4.6.1.2 did not contain the standard footnote referencing back to Section 3/4.10.1.
Section 3/4.3.10.1 references and L ' applies.to several specifications (including:3/4.6.1.2). Add the Footnote
- to the' APPLICABILITY and' add "# See
~
(( ~ :;
2 Special Test Exception 3.10.1" to the footnotes. l 3/4 6-64 Editorial The word "be" should be added to SR j 4.6.6.3.a.1. I I
3/4 8-15 Editorial Change the number "120" to "119" in SR 4.8.2.1.d.2.C. As submitted in GSU letter dated July 15, 1985 (RBG-21543),
the HPCS battery discharge profile from 1-120 minutes (119 minutes total) is equal to 15.4 amps.
B 3/4 8-3 Typo Change the number "4.8.4.2.a.3" to "4.8.4.1.a.3" for Section 3/4.8.4.
5-2, 5-4 Editorial These two figures should be swapped.
(i.e., Figure 5.1.1-1 before 5.1.2-1 and then 5.1.3-1.)
x
g 3
ENCLOSURE 2 i
b "m- . , , , _ , _
1 i
~
/
INDEX FINAL EAFT i
LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.3.9 PLANT SYSTEMS ACTUATION INSTRUMENTATION. . . . . . . . . . . . . . . . . 3/4 3-tee to7 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 RECIRCULATION SYSTEM Recirculation Loops.................................... 3/4 4-1 Jet Pumps.............................................. 3/4 4-4 Recirculation Loop F1ow................................. 3/4 4-5 Idle Recirculation Loop Startup......................... 3/4 4-6 3/4.4.2 SAFETY VALVES Safety / Relief Va1ves.................................... 3/4 4-7 Safety / Relief Valves Low-Low Set Function............... 3/4 4-9 3/4 4.3 REACTOR COOLANT SYSTEM LEAKAGE 7
Leakage Detection Systems............................... 3/4 4-10
(
Ope rati onal Leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4 4-11 3/4.4.4 CHEMISTRY............................................... 3/4 4-14 3/4.4.5 SPECIFIC ACTIVITY....................................... 3/4 4-18 3/4.4.6 PRESSURE / TEMPERATURE LIMITS Reactor Coolant System.................................. 2/3 4-22 Reactor Steam 0 cme...................................... 3/4 4-26 3/4.4.7 MAIN STEAM LINE ISOLATION VALVES. . . . . . . . . . . . . . . . . . . . . . . . 3/4 4-27 3/4.4.8 STRUCTURAL INTEGRITY.................................... 3/4 4-28 3/4.4.9 RESIDUAL HEAT REMOVAL Hot Shutdown............................................ 3/4 4-29 Cold Shutdown........................................... 3/4 4-30 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ECCS - 0PERATING........................................ 3/4 5-1 3/4.5.2 ECCS - SHUTD0WN......................................... 3/4 5-6 3/4.5.3 SUPPRESSION P00L........................................ 3/4 5-8 RIVER BEND - UNIT 1 vi
.g g g 35
c ,_ FINAL MAFT BASES SECTION PAGE REACTOR COOLANT SYSTEM (Continued) 3/4.4.6 PRESSURE / TEMPERATURE LIMITS........................ B 3/4 4-5 3/4.4.7 MAIN STEAM LINE ISO LATION' VALVES. . . . . . . . . . . . . . . . . . . B 3/4 4-6 3/4.4.8 STRUCTURAL INTEGRITY............................... B 3/4 4-6 3/4.4.9 RESIDUAL HEAT REM 0 VAL.............................. B 3/4 4-6 3/4.5 EMERGENCY CORE COOLING SYSTEMS e
3/4.5.1 and 3/4.5.2 ECCS - OPERATING and SHUTDOWN.......... B 3/4 5-1 3/4.5.3 SUPPRESSION P00L................................... B 3/4 5-2 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 CONTAINMENT Primary Contai nment -Integri ty. . . . . . . . . . . . . . . . . . . . . . B 3/4 6-1 Primary Containment Leakage........................ B 3/4 6-1 Primary Containment Air Locks...................... B 3/4 6-1 Main Steam-Positive Leakage Control System......... S 3/4 6-2 Primary Containment Structural Integrity........... B 3/4 6-2 Primary Containment Internal Pressure. . . . . . . . . . . . . . B 3/4 6-2 Primary Containment Average Air Temperature........ B 3/4 6-2 dL4Drywell and Primary Containment Purge System. . . . . . . B 3/4 6-3 l Penetration Valve Leakage Control System........... B 3/4 6-3 3/4.6.2 DRYWELL D rywe l l I nte gr i ty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B 3/4 6-3 Drywell Bypass Leakage............................. B 3/4 6-3 Orywell Air Locks.................................. B 3/4 6-4 Drywell Structural Integrity....................... B 3/4 6-4 Drywell Internal Pressure.......................... 8 N/4 6-4 Drywell Average Air Temperature.................... B 3/4 6-4 Drywell Vent and Purge............................. B 3/4 6-4 i
RIVER BEND - UNIT 1 xiv
$ 19 I
~
~
/
INDEX FMAL DRAFT ADMINISTRATIVE CONTROLS SECTION PAGE 6.5.3 NUCLEAR REVIEW BOARD (NRB).................................. 6-9 FUNCTION................................................. 6-9 COMPOSITION.............................................. 6-10 ALTERNATES............................................... 6-10 CONSULTANTS.............................................. 6-10 MEETING FREQUENCY........................................ 6-11 QU0 RUM................................................... 6-11 REVIEW................................................... 6-11 AUDITS................................................... 6-11 RECOR05.................................................. 6-12 6.6 REPORTABLE EVENT ACTI0N....................................... 6-13 6.7 SAFETY LIMIT VIOLATION........................................ 6-13 6.8 PROCEDURES AND PR0 GRAMS....................................... 6-13 6.9 REPORTING REQUIREMENTS........................................ 6-15 6.9.1 ROUTINE REP 0RTS.......................................... 6-15 Startup Report........................................... 6-15 Annual Reports........................................... 6-16 Monthly Operating Reports................................ 6-17 Annual Radiological Environmental Operating Report....... 6-17 Semiannual Radioactive Effluent Release Report........... 6-18 6.9.2 SPECIAL REP 0RTS.......................................... 6-EWkli )
6.10 RECORD RETENTION.'............................................ 6-39 19 I i 6.11 RADIATION PROTECTION PR0 GRAM................................. 6-21 6.12 HIGH RADIATION AREA.......................................... 6-21 RIVER BEND - UNIT 1 xx gh l
l
i INDEX FINAL DET (
ADMINISTRATIVE CONTR0LS j SECTION PAGE 6.13 PROCESS CONTROL PROGRAM (PCP)................................ 6-M 22 f 6.14 0FFSITE DOSE CALCULATION MANUAL (00CM)....................... 6-23 6.15 MAJOR CHANGES TO RADI0 ACTIVE LIQUID, GASEOUS AND SOLIO WASTE TREATMENT SYSTEMS............................................ 6-G4 23
.i l
i 1
(
T s
RIVER BEND - UNIT 1 xxi g1 % N l
TABLE 3.3.3-2 (Continued) d EMERGEPCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SETPOINTS
$ ALLOWABLE is TRIP FUNCTION TRIP SETPOINT VALUE c- D. LOSS OF POWER (continued) 2 Q 2. Division III
,_. a. 4.16 kv Standby Bus Undervoltage a. 4.16 kv Basis -
(Sustained Undervoltage) 3045 i 153 volts 3045 1 214 volts
- b. 3 1 0.3 sec. time 3 1 0.33 sec. time delay delay
- b. 4.16 kv Standby Bus Undervoltage a. 4.16 kv Basis -
(Degraded Voltage) 3777 i 30 volts 3777 i 75 volts
- b. 60 1 6 sec. time 60 1 6.6 sec. time delay delay (w/o LOCA)
R
- c. 3 1 0.3 sec. time 3 1 0.33 sec. time delay delay (w/LOCA)
Y
- See Bases Figure B 3/4 3-1. 98
- (Bottom of CST is at EL 95'1".) The levels are measured from the instrument zero level of EL M'6".
- (Bottom of suppression pool is at EL 70'.) The levels are measured from the instrument zero level of EL 89'9".
- These are inverse time delay voltage relays or instantaneous voltage relays with a time delay. The voltages shown are the maximum that will not result in a trip. Lower voltage conditions will result in decreased trip times.
im:r as d'
F-g e
- Y rii
- p
$ Ln "vi W
TABLE 3.3.6-2 CONTROL ROD BLOCK INSTRUMENTATION SETPOINTS g TRIP FUNCTION TRIP SETPOINT ALLOWABLE VALUE
- $ 1. ROD PATTERN CONTROL SYSTEM s a. Low Power Setpoint 27.5 1 3% of RATED THERMAL POWER 27.5 1 7.5% of RATED THERMAL
, e POWER
}
ea 2.
b.
APRM High Power Setpoint 62.5 i 3% of RATED THERMAL POWER 62.5 i 7.5% of RATED THERMAL POWER
- a. Flow Biased Neutron Flux
- Upscale $ 0.66 W + 42%* $ 0.66 W + 45%*
- b. Inoperative NA NA
- c. Downscale 15% of RATED THERMAL POWER 1 3% of RATED THERMAL POWER
- d. Neutron Flux - Upscale Startup $ 12% of RATED THERMAL POWER $ 14% of RATED THERMAL POWER
- 3. SOURCE RANGE MONITORS w a. Detector not full in NA NA
' 0 5 D b. Upscale $ 1 x 10 cps 5 1.6 x 10 c, w c. Inoperative NA NA h d. Downscale 1 0.7 cps 1 0.5 cps **
- 4. INTERMEDIATE RANGE MONITORS
- a. Detector not full in NA NA
- b. Upscale $ 108/125 division of full 5 110/125 division of full scale scale
- c. Inoperative NA NA I d. Downscale 1 5/125 division of full' 1 3/125 division of full scale scale
- 5. SCRAM DISCHARGE VOLUME
- a. < 18.00" "T1 Water Level-High - LISN602A < 21.12" LISN602B 5 18 [
- 6. REACTOR COOLANT SYSTEM RECIRCULATION FLOW
C
- a. Upscale $ 108% of rated flow $ 111% of rated flow P
! O
- *The Average Power Range Monitor rod block function is varied as a function of recirculation loop flow (W). N j @
The trip setting of this function must be maintained in accordance with Specification 3.2.2.
- Provided signal to noise ratio is 1 2, otherwise setpoint of 3 cps and allowable 1.8 cps.
g 9
N
INSTRUMENTATION a
! RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.7.11 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.3.7.11-1 shall be OPERABLE with their alarm / trip
- setpoints set to ensure that the limits of Specification 3.11.2.1 are not exceeded. The alarm / trip setpoints of these channels shall be determined and adjusted in accordance with the methodology and parameters in the ODCM.
APPLICABILITY: As shown in Table 3.3.7.11-1.
ACTION:
- a. With a radioactive gaseous effluent monitoring instrumentation channel alarm / trip
- setpoint less conservative than required by the above Specification, immediately suspend the release of radioactive gaseous effluents monitored by the affected channel, or declare the channel inoperable.
- b. With less than the minimum number of radioactive gaseous effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.3.7.11-1. Restore the inoperable instrumentation to OPERABLE status within the time specified in the ACTION or explain in the next Semiannual Radioactive Effluent Release Report why this inoperability was not corrected within the time specified,
- c. The provisions of Specifications 3.0.3 and 3.0.4, are not applicable.
SUREVEILLANCE REQUIREMENTS 4.3.7.11 Each radioactive gaseous effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3.7.11-1.
- The alarm / trip setpoints for the Explosive Gas Mixture in the Main Condenser Offgas Treatment System
- set in accordance with Specification 3.11.2.6.
are St 19 BBS RIVER BEND - UNIT 1 3/4 3-99
TABLE 4.3.7.11-1 (Continued)
TABLE NOTATIONS FEAL MAFT At all times.
During main condenser offgas treatment system operation.
(1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
- a. Instrument indicates measured levels above the alarm setpoint.
- b. Circuit failure.
- c. Instrument indicates a downscale failure.
- d. Instrument controls not set in operate mode.
(2)
The initial CHANNEL CALIBRATION shall be performed using one or more using standards that have been obtained from suppliers that participate h with NBS in measurement assurance activities. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.
(3) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
- a. One volume percent hydrogen, balance nitrogen, and
- b. Four volume percent hydrogen, balance nitrogen.
f I
RIVER BEND - UNIT 1 3/4 3-105
EMERGENCY CORE COOLING SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
ACTION: (Continued)
- d. For ECCS divisions I and II, provided that ECCS division III is OPERABLE:
- 1. With LPCI subsystem "A" and either LPCI subsystem "B" or "C" inoperable, restore at least the inoperable LPCI subsystem "A" or inoperable LPCI subsystem "B" or "C" to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- 2. With the LPCS system inoperable and either LPCI subsystem "B" or "C" inoperable, restore at least the inoperable LPCS system or inoperable LPCI subsystem "B" or "C" to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- 3. Otherwise, be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.
- e. For ECCS divisions I and II, provided that ECCS division III is OPERABLE and divisions I and II are otherwise OPERABLE:
- 1. With one of the above required ADS valves inoperable, restore the inoperable ADS valve to OPERABLE status within 14 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to 1 100 psig within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 2. With two or more of the above required ADS valves inoperable, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dome pressure to i 100 psig within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- f. With an ECCS discharge line " keep filled" pressure alarm instrumentation channel inoperable, perform Surveillance Requirement 4.5.1.a.1 at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- g. In the event an ECCS system is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and sub-mitted within 90 days to the Commission, pursuant to Specification 6.9.2,describingthecircumstancesoftheactuationandthetota[l accumulated actuation cycles to date. The current value of the u ge (
factor for each affected safety injection nozzle shall be provided in l this Special Report whenever its value exceeds 0.70.
- Whenever two or more RHR subsystems are inoperable, if unable to attain COLD SHUTOOWN as required by this ACTION, maintain reactor coolant temperature as
( low as practical oy use of alternate heat removal methods.
RIVER BEND - UNIT 1 3/4 5-3 N
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT INTEGRITY - FUEL HANDLING LIMITING CONDITION FOR OPERATION 3.6.1.2 PRIMARY CONTAINMENT INTEGRITY - FUEL HANDLING shall be maintained.
APPLICABILITY: Operational Condition * #
l l
ACTION:
Without PRIMARY CONTAINMENT INTEGRITY - FUEL HANDLING, suspend handling of irradiated fuel in the primary containment, CORE ALTERATIONS and operations with a potential for draining the reactor vessel.
SURVEILLANCE REQUIREMENTS 4.6.1.2 PRIMARY CONTAINMENT INTEGRITY - FUEL HANDLING shall be demonstrated:
- a. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to entering and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during Operational Condition
- by verifying that all primary con-tainment penetrations required to be closed during accident condi-tions are closed by hatches, valves, blind flanges, or deactivated automatic valves secured in position.
- b. By verifying each containment air lock is in compliance with the requirements of Specification 3.6.1.4.
- When handling irradiated fuel in the primary containment and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel.
- See Spes/.I Test Excep4'ea 3.1o.1.
RIVER BEND - UNIT 1 3/4 6-2 g hN
CONTAINMENT SYSTEMS
[ .
I t
PRIMARY CONTAINMENT /DRYWELL HYDROGEN IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.6.3 The primary containment /drywell hydrogen ignition system, consisting of two independent primary containment /drywell hydrogen ignition subsystems each consisting of ten circuits, shall be OPERABLE with no more than two igniter assemblies inoperable per circuit and no more than five igniter assemblies inoperable per subsystem and no adjacent igniter assemblies inoperable.
APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2 ACTION:
- a. With one primary containment /drywell hydrogen ignition subsystem and/or circuit inoperable, restore the inoperable subsystem and/or circuit to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
- b. With any adjacent igniter assemblies inoperable, restore all igniter assemblies adjacent to an inoperable igniter assembly to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.6.3 The primary containment /drywell hydrogen ignition system shall be demon-strated OPERABLE:
- a. At least once per 184 days by energizing all the igniter assemblies and performing current / voltage measurements of each circuit.
be
- 1. If more than three igniter assemblies on either subsystem are determined to inoperable, Specification 4.6.6.3.a shall be per- [
formed at least once per 92 days until this condition no longer exists.
- 2. If more than one igniter assembly on each subsystem are deter-mined to be inoperable, determine if the inoperable igniter assemblies are adjacent.
- b. At least once per 18 months, by energizing each igniter assembly, verifying a surface temperature of at least 1700*F for each of the accessible igniters and verifying by measurement sufficient current /
voltage to develop 1700*F surface temperature for those igniter assemblies in inaccessible areas.
l
.. l i
RIVER BEND - UNIT 1 3/4 6-64 'J$Ll'H$S i
-ELECTRICAL POWER SYSTEMS FIMI.DRPET SURVEILLANCE REQUIREMENTS (Continued) b) Division II 1502 amperes for the first 60 seconds 1 261 amperes for the next 9 minutes 1 327 amperes for the next 60 seconds 1261 amperes for the next 228 minutes 1 327 amperes for the last 60 seconds c) Division III 1 53.2 amperes for the first 60 seconds
> 15.4 amperes for the next tee minutes
~~
119 e.
. .-e-At least once per 60 months by verifying during shutdown that the-battery capacity is at least 80% of the manufacturer's rating whe'n 1
subjected to a performance discharge test. Once per 60 month interval, this performance discharge test may be performed in lieu of the battery service test.
f.
At least once per 18 months, during shutdown, performance discharge tests of battery capacity shall be given to any battery that shows signs for theofapplication.
degradation or has reached 85% of the service life expected Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
f RIVER BEND - UNIT 1 3/4 8-15 JUL 2 41985 a
ELECTRICAL POWER SYSTEMS ,g g BASES t
3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Containment electrical penetrations, penetration conductors, main control room lighting, and RPS alternate source of power are protected by either de-energizing circuits not required during reactor operation or demonstrating the OPERABILITY of the overcurrent protection circuit breakers and/or motor starters by periodic surveillance.
The surveillance requirements applicable to lower voltage circuit breakers and/or motor starters provide assurance of breaker and starter reliability by testing at least one representative sample of each manufacturer's brand of circuit breaker and/or starter. Each manufacturer's molded case and metal case circuit breakers and/or motor starters are grouped into representative samples whicn are tested on a rotating basis to ensure that all breakers and/or star-ters are tested. If a wide variety exists within any manufacturer's brand of circuit breakers and/or motor starters, it is necessary to divide that manufac-turer's breakers and/or starters into groups and treat each group as a separate type of breaker or starter for surveillance purposes.
Specific surveillance tests on the bypass circuits of motor operated valves' thermal overload protection is not required at River Bend because the circuits are integral with the starting circuits of the motor operated valves and are therefore tested during functional tests of the valves. For the motor operated valve thermal overloads not bypassed, the thermal overloads are tested under Specification 4.8.4 a.3. These surveillance requirements are in accordance with RG 1.106, "The al Overload Protection for Electric Motors on Motor Operated Valves," Reiision 1, March 1977.
The reactor prot tion system (RPS) electric power monitoring assemblies provide redundant protection to the RPS, and to other systems that receive power from the RPS buses, by acting to disconnect the RPS from the power source cir-cuits in the presence of an electrical fault in the power supply.
y)l.13 RIVER BEND - UNIT 1 8 3/4 8-3 l
1
--