ML20133H951

From kanterella
Jump to navigation Jump to search
Documents & Confirms Agreement Between NRC & Util That Util Will Provide to NRC,60 Days Prior to Each Plant Refueling Outage,List of Human Engineering Deficiency Mods Scheduled for Completion During Outage,Per 850701 Telcon
ML20133H951
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/17/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8508090584
Download: ML20133H951 (2)


Text

,, ,

of&

So- %4 So - S 90 July 17,1985 Duke Power Company

/ ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 472 South C'1urch Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR HUMAN ENGINEERING DEFICIENCY MODIFICATIONS This letter is to document and confirm the agreement reached during a telephone call on July 1,1985, between Robert Gill of your staff and Harold Christensen of the NRC, Region II.

We understand that Duke Power Company plans to provide to the NRC, Region II, 60 days prior to each McGuire Nuclear Station refueling outage, a list of Human Engineering Deficiency (HED) modifications scheduled to be completed during that outage. An additional item is that Duke plans to complete all identified HED modifications by the end of the fourth refueling outage for units 1 and 2, as outlined in the implementation schedule enclosed in your May 3,1985, letter to Harold R. Denton.

If your understanding of the July 1,1985, conversation is different, please inform the Rehion II staff as soon as possible.

Sincerely, original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects cc:/T.L.McConnell,StationManager vil. Gill, Nuclear Production Department bcc: 60'. Hood, NRR vNRC Resident Inspector Document Control Desk State of North Carolina 8508090504 850717 PDR ADOCK 05000369

/ x diu A'^' *

~N[ O[

[RII RII RII RII RII RII g HChristensen BDebs CJulian AGibson HDance VBrownlee /

07/ /85 07/ /85 07/ /85 07/ /85 07/ /85 07/ /85 8 ,

Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR HED MODIFICATIONS This letter is to document and confirm the agreement reached during a telephone call on July 1,1985, between Robert Gill of your staff and Harold Christensen of the NRC, Region II.

We understand that Duke Power Company plans to provide to the NRC, Region II, 60 days prior to each McGuire Nuclear Station refueling outage, a list of Human Engineering Deficiency (HED) modifications scheduled to be completed during that outage. An additional item is that Duke plans to complete all identified HED modifications by the end of the fourth refueling outage for units 1 and 2, as outlined in the implementation schedule enclosed in your May 3,1985 letter to Harold R. Denton. ,

If your understanding of the July 1,1985 conversation is different, please inform the Rehion 11 staff as soon as possible.

Roger D. Walker, Director Division of Reactor Projects cc: T. L. McConnell, Station Manager R. Gill, Nuclear Production Department bcc: D. Hood, NRR NRC Resident Inspector Document Control Desk State of North Carolina 0 RII RII RI RI! dp?