ML20128L813
ML20128L813 | |
Person / Time | |
---|---|
Site: | Oconee, Mcguire, McGuire, 05000000 |
Issue date: | 06/12/1985 |
From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Tucker H DUKE POWER CO. |
Shared Package | |
ML20128L817 | List: |
References | |
NUDOCS 8507110467 | |
Download: ML20128L813 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999
[Table view]Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20058H4551990-11-0707 November 1990
[Table view]Forwards Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101.No Violations or Deviations Noted ML20058H0631990-11-0606 November 1990 Forwards Partially Withheld Insp Repts 50-269/90-32, 50-270/90-32 & 50-287/90-32 on 901015-19 IR 05000369/19900141990-10-17017 October 1990 Ack Receipt of 900928 Response Re Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14 ML20058B2271990-10-12012 October 1990 Confirms 901010 Telcon W/T Curtiss Re Request for Regional Waiver of Compliance.Waiver Granted on One Time Basis & for Max of 4 H to Allow Testing of Reactor Coolant Makeup Pump Prior to 901102 ML20058B9631990-10-12012 October 1990 Advises That Liquid Samples,Spiked W/Radionuclides,Will Be Sent to Facilities for Radiochemical Analyses for Tritium, Fe-55,Sr-89 & Sr-90.Analyses Should Be Completed within 60 Days ML20058A2931990-10-10010 October 1990 Forwards Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted ML20058A6491990-10-0202 October 1990 Forwards SALP Repts 50-269/90-24,50-270/90-24,50-287/90-24 & 72-0004/90-24 for Feb 1989 - Jul 1990 ML20059M8081990-09-25025 September 1990 Approves 900820 Revised Relief Request 89-02 to Replace 20- Inch Carbon Steel Elbow W/Stainless Steel Pipe ML20059K4451990-09-17017 September 1990 Advises That Ta Reed Assigned as Project Manager for Plant ML20059L5611990-09-13013 September 1990 Forwards Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828.Violations Noted But Not Cited ML20059K6671990-09-10010 September 1990 Forwards Insp Repts 50-369/90-15 & 50-370/90-15 on 900813- 17.Violation Noted But Not Cited IR 05000369/19900111990-09-0505 September 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11 ML20059K0051990-09-0505 September 1990 Forwards Exam Rept 50-369/OL-90-02 Administered on 900730- 0802 ML20058N7901990-08-0909 August 1990 Forwards Safety Evaluation Supporting Util 890213 Relief Request 89-01 Re ASME Code Section XI Hydrostatic Testing Requirements ML20058P8381990-08-0303 August 1990 Discusses 900731 Enforcement Conference Re 900626 Event at Facility Involving Inoperability of Both Emergency Generators.List of Attendees & Supporting Info Encl ML20056A5571990-08-0202 August 1990 Requests Addl Info Re DPC-NE-2004, Core Thermal-Hydraulic Methodology Using VIPRE-01 for McGuire & Catawba. Requests Response Expeditiously IR 05000369/19900091990-07-30030 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09 ML20055J1301990-07-24024 July 1990 Forwards Partially Withheld Safeguards Insp Repts 50-269/90-22,50-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviations Noted ML20056A5171990-07-24024 July 1990 Confirms Arrangements for 900731 Enforcement Conference in Region II Ofc to Discuss Util Recent Problems Re Inoperability of Both Unit 1 Emergency Diesel Generators for Approx 26 H ML20056A5811990-07-24024 July 1990 Forwards Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625 & Notice of Violation.Util Requested to Include in Response,Any Mgt Actions to Be Taken to Prevent Subj Event from Recurring ML20055H4811990-07-13013 July 1990 Forwards Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705.Violations Noted.Enforcement Conference Scheduled for 900731 to Discuss Violations ML20055H4721990-07-0303 July 1990 Ack Receipt of 900522 & 0621 Ltrs Forwarding Objectives & Scenario Package for Emergency Preparedness Exercise Scheduled for Wk of 900813 ML20055C9631990-06-25025 June 1990 Forwards Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08.No Violations or Deviations Noted ML20059M9241990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) IR 05000369/19890141989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-369/89-14 ML20248B6601989-09-22022 September 1989 Forwards Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09 & 19-23.No Violations or Deviations Noted. Attention Invited to Weaknesses Identified in Rept Re Program for Molded Case Circuit Breakers ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248D5891989-09-20020 September 1989 Ack Receipt of 890818 Response to Violations Noted in Insp Repts 50-369/89-05 & 50-370/89-05 ML20248C6181989-09-20020 September 1989 Ack Receipt of 890628 Response Transmitting Description of Additions to & Deviations from Generic Emergency Response Guidelines for Plant as Requested in ML20247P4051989-09-20020 September 1989 Forwards Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted IR 05000369/19890271989-09-19019 September 1989 Forwards Insp Repts 50-369/89-27 & 50-370/89-27 on 890814-18.Violations Noted But Not Cited ML20247G6451989-09-13013 September 1989 Ack Receipt of 890828 Request for Relief from Limiting Condition for Operation Action Statement 3.6.1.8, Annulus Ventilation Sys. Understands That One Train of Sys Returned to Svc & Both Trains Declared Operable on 890825 ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247K1281989-09-11011 September 1989 Forwards Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20247B5711989-08-31031 August 1989 Forwards Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246N2501989-08-29029 August 1989 Advises That Portions of 890725 Rev 29 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p).Util Should Revert to Commitments Previously Approved or Modify Plan to Accommodate Encl Comments & Resubmit Corrected Plan Pages ML20246F0891989-08-24024 August 1989 Approves Route Request for Shipments of Spent Fuel from Plant to Lynchburg,Va,Per 890720 Request.Proposed Route Encl ML20246E8541989-08-23023 August 1989 Forwards Exam Repts 50-369/OL-89-01 for Units 1 & 2 Administered on 890626-30 ML20246P2411989-08-22022 August 1989 Forwards Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted ML20246N6381989-08-21021 August 1989 Forwards Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18 & Notice of Violation ML20246D0391989-08-18018 August 1989 Forwards Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations or Deviations Noted ML20246C9591989-08-17017 August 1989 Requests Deletion of NRC to Licensee on NRC Followup of Plant Alert Critique Action Items from Licensee Records & to Refer to 890714 Version of Ltr in Any Future Correspondence on Same Subj ML20246C3941989-08-15015 August 1989 Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted ML20246C8211989-08-11011 August 1989 Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl ML20246D0651989-08-0909 August 1989 Forwards Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217F8011999-10-13013 October 1999
[Table view]Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206L5631999-05-11011 May 1999 Forwards Two Documents Requesting That NRC Place on Docket 50-369 & 50-370,technical Interface Agreement 97-02 & Related Staff Evaluation ML20206M2121999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created ML20206N3451999-05-11011 May 1999 Forwards SE of Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206C0451999-04-23023 April 1999 Forwards Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted ML20205Q6641999-04-15015 April 1999 Forwards Amend 10 to Indemnity Agreement B-83 for Signature & Return to Document Control Desk ML20205M6741999-04-13013 April 1999 Discusses 980318 Telcon of Licensing Bases Record Change Re Duke Energy Corp License Amend Request, & Staff Approval in Form of TS Amends 184 & 166,dtd 980930.Forwards Revised Pp to SE of 980930 ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML20205T1711999-04-0909 April 1999 Informs That on 990317 Ho Christensen & a Orton Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates for Wks of 000508 & 22 for Approx 13 Candidates ML20205M2601999-03-25025 March 1999 Informs That NRC Completed PPR of Plant on 990201.Plant Issues Matrix & Insp Plan for Next 8 Months Encl ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML20205A9371999-03-24024 March 1999 Forwards Evaluated & Final Rept from Ferc,Related to 981014 Dam Safety Audit Conducted at McGuire Nuclear Station for Category I Standby Service Water Pond Dam.List of Actions That Should Be Taken by Util to Ensure Safety of Dam,Encl ML20205H9201999-03-18018 March 1999 Forwards Exam Repts 50-369/99-301 & 50-370/99-301 on 990125- 0205.Of Eleven SRO & RO Candidates Taking Written Exam & Operating Tests,Nine Passed & Two Failed,Representing 82% Pass Rate ML20204E3221999-03-10010 March 1999 Forwards Insp Repts 50-369/99-01 & 50-370/99-01 on 990103- 0213.Non-cited Violation Noted ML20207M9091999-03-0505 March 1999 Informs That Info Submitted by Application, Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20203J0431999-02-16016 February 1999 Discusses Review of Plant,Units 1 & 2 IPEEE Submittal.Staff Concludes That Util IPEEE Process,Capable of Identifying Most Likely Severe Accidents & Severe Accidents Vulnerabilities.Intent of Suppl 4 to GL 88-20 Met ML20203C2411999-02-0505 February 1999 Discusses Draft Operation Insp Rept for McGuire Nuclear Station Standby Nuclear Service Water Pond Dam Conducted on 981028.Draft Rept States That Dam Appeared to Be in Good Condition & Adequately Maintained ML20203G3361999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Names of Candidates for Exam ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202E3861999-01-28028 January 1999 Refers to GL 96-05 Issued on 960918 & DPC 980331 Updated Response to GL 96-05 Indicating Intent to Implement Provisions of JOG Program on MOV Periodic Verfication at Mcguire.Rai Re JOG Program McGuire Encl ML20199L4421999-01-25025 January 1999 Informs That by Encl Ltrs & 981223,NRC Has Responded to WOG Positions Re C/As to Address Generic Aspects of part-length CRD Mechanism Housing Issue That Originated as Result of 980123 Leak at Pings ML20203A4171999-01-22022 January 1999 Refers to 990119 Meeting Conducted in Region II Ofc for Presentation of self-assessment of McGuire Nuclear Station Performance & Future Plant Initiatives.List of Attendees & Presentation Handouts Encl ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198Q7551999-01-0505 January 1999 Forwards RAI Re 980722 Request for Amend to Plant,Units 1 & 2 TSs to Permit Use of Westinghouse Fuel.Response Requested on or Before 990131 1999-09-23 |
See also: IR 05000269/1985013
Text
l' ,
Me}CS
.
.
JUN 121985
Duke Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NOS. 50-269/85-13, 50-270/85-13, 50-287/85-13,
50-369/85-18 AND 50-370/85-19
On May 28-31, 1985, NRC inspected activities authorized by NRC Operating License
Nos. OPR-38, DPR-47, DPR-55, NPF-9 and NPF-17 for your Oconee and McGuire
f acil i ti e:. . At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
\S\
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-269/85-13,
50-270/85-13, 50-287/85-13,
50-369/85-18 and 50-370/85-19
cc w/ enc 1:
T. L. McConnell, Station Manager
M. S. Tuckman, Station Manager
bec w/ enc 1: (See page 2)
hh l
J EO/ , f;
ir >
.
.
Duke Power Company 2 JUN 121985
bec w/ encl:
NRC Resident Inspector
Document Control Desk
State of North Carolina
State of South Carolina
1
-
.
.
-L* 1 (* .,
? ~} e
N
i
l
l
l
t
l RII RII)I RII
l
l
t#A
Wang:cdg
\kj
JBlake
h
AHerdt
( 06/ 4 /85 h//l/ 06/// /85
k
1
L.