N.R.C. OPERATING DATA REPORT

. DOCKET NO. 50-315 DATE 5/1/85 .

. COMPLETED BY CLIMER I I

e TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 ----------

2.. Reporting Period .

Apr. 85 notes  !

3r Licensed. Thermal Power-(MWt) 3411 i

4. Name Plate. Rating (Gross MWe) . 1133 . I
5. Design Electrical Rating (Net MWe) 1100 t i
6. Maximum Dependable Capacity (GROSS MWe) 1100 !  !

4 .7. Maximum Dependable Capacity (Net MWe) 1060.----------------------- ]

.O.DIf Changes Occur in Capacity Ratings (Items no. 3 through 7) Since 5 Last Report Give Reasons _________. .________________ _______  ;

J

~~ ~~~ ~~ ~ ~~ ~ ~ ~~~~

9.-PoweE~LeveI~To Uhich Restr5~ctedI~}[ Any (U~et MU~e5~_~[~~ _ ______________  !

10. Reasons For Restrictions. If Any:________________________________  ;

This Mo. Yr. to Date CummsJ.

311. Hours in Reporting Period 719.0- 2879.0 64247.0

12. No. of Hrs.-Reactor Was Critical 719.0 2588.0 45669.0 13.. Reactor Reserve Shutdown Hours 0.0 0.0 "O.0-

'14. Hours Gen,erator.on Line 719.0 2569.5 44568.1

-15. Unit-Reserve Shutdown Hours 0.0 0.0 0.0

16. Gross Therm. Energy Gen. (MWH) 2449523 8543603 141621664
17. Gross. Elect. Energy Gen. (MWH) 811270 2829380 46614810
18. Net Elect. Energy Gen. (MWH) 784146 2732510 44950244
19. Unit Servico Factor 100.0 89.2 72.2
20. Unit Availability Factor 100.0 89.2 72.2
21. Unit Capacity Factor (MDC Net) 102.9 89.5 68.8
22. Unit Capacity Factor (DER Net) 99.1 86.3 <67 7
23. Unit Forced Outage Rate ,

0.0 .

8.7 12.4

24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration): 'I

_1981 g uy11 3.0 tap 3 _sghp_Qg(_tg_stayt,0c,tp3r3,_19g__Es[i, mat 34_@yatioy,_

t 19Le a rs _ - _ - _ - _ _ _ _ _ _ _ - _ _ - - - - _ _ - _ - _ - - - - _ _ _ _ - - - -- - _ - - - --- - _ _ - _ - - - - -

25. If Shut Down At End of Report Period, Estimated Date of Startups
26. Units in Test Gtatuu (Prior to Commercial Operation):

~orcast Achiuved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

g2gg gobi6 PDR R l/g 1

---._____-.--_._-__.-._-._...___.___-____J _

p .~ ,

! .9<,

V .-

L .

l 1

AVERAGE DAILY. POWER. LEVEL ~(MWe-Net)

DOCKET NO. 316 l;

[ UNIT TWO t DATE 5/1/85 COMPLETED BY CLIMER , l TELEPHONE. 616-465-5901 j i

' MONTH Apr. 85 l AVERAGE DAILY AVE' RAGE DAILY DAY POWER LEVEL DAY POWER LEVEL {

l' 1096 17 1094 '

2 1078 10 1092 1

~3 1097 19 1090

'4 .1097 20 1086: ,

5 1098 21 1087 6-1088 22 1086~ ,  ;

7- 1091 23 1074; . ,.

O 1090 24 1087 ^ t; .

9 1077 25 1088' E-10 1090 26 1090 t 11: 1092 27 1086 12 1094 28 1097.

13 1089 29 1092 14 1093- 30 1080 15 1096 31 0 16 1082 e

e 6

e

_ _ _ - , .W

e DOCKET No.

50-316 . .

81 NIT SIMIIlW)WNS ANI) POWEM IEEIMM'HONS D.C. Cook, Unit 2 INT NAME IDATE 5-8-85 COMPl.ETEin BY B.A. Svensson REFORT MON Hg April 1985 616/465-5901

. TEl.FFiloNE c.

33 'h ) E .; I kensee @,, 4 Cauw A Canacceive N.. . Inase g 3g j 2gy livens gy gOi Acss.n s..

e fE 5 j;y, g Nep.us = in O g Psevens Recussence 6

There were no Unit shutdowns or sig-None nificant power reductions during the month. The Unit operated at a ca-pacity factor of 102.9% (MDC).

1 2 3 4 12: I:..sccJ Meas.=i: M cah =l: Enlab6 G - lusie ucci. mis S. Lt.cJuicJ A l'agusemacs.: Faehus(I midasal I muual few Psepasasi.us .4 Data B minisenance ai Test 2-maiul Sciaan. Ensey St cces f.u IJcciasce C Refucieng 3 Autuunaise Ssans- livent Heinus (I 1:RI File INilRI'G-

1) Regulasiuy Best icssuse 44)ehce (Emplami) 0161) 1 Ogwsas..a Tsaananga lkcaw 1:massenssasauss F-AJoensmasassve 5 G E agicsass.maal Lese:s IIisplassel lixlobst 1 - S.anic busce cl/17) II(kl.cs (E splass)

. . ~ .

w u .~. . ,~...a .n. . .. ; . .. . .- ,a .

UNIT SHUTDOWNS AND POWER REDUCTIONS INSTRUCTIONS This report should descr2e a!! plant shutdowns duttng the in accordance with the taole appearms on the report form.

report persed. In addition. it should be the source o(explan. If category 4 must be used. supply brief comments.

anon of sismficant dips in average power lewis. Each ngni.

(1 cant reducuon in power lent (greater than 20% reduction LICENSEE EVENT REPORT m. Reference the applicable m average dady power lew! (or the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) reportable occurrence pertammg to the outage or power should be noted, even though the urut may not have been reduction. Enter the !!rst four parts (event year. sequent:2!

shut down completelyl . For suca reducuons in power few!, report number, occurrence code and report type) of the tive the duration should be !!sted u zero, the method of reduction part designation as descnbed in item 17 of Instrucuons for should be listed as 4 (Other), and the Cause and Correcuve Preparauon of Data Entry Sheets for Licensee Ewnt Resort Action to ?.ennt Rewrtnce column should explain. The (LER) File (NUREC.0161). This informanon may not be Cause and Correcuw Action to Prewnt bcurrence column immediately evident for all sui.h shutdowns.of eourse. smce should be used to provide any needed explanation to fully furtner invesugation may be required to ucettam whether ur dessnbe the circumstances of the outage or power reduction. not a reportable occurrence was involved.) If the outage or power reduct:on will not result in a reportable occurrence.

. NUMBER. This column should indicate the sequenttal num. the postuve indication of this lack of correlanon should be her assigned to each shutdown or signaticant recussionin power noted u not applicable (N/A),

for that calendar year. When a shutdown or stytticant power reduction begins in one report penod and ends m another. SYSTEM CODE. The system in which the ou.tage.or power an entry should be made for both report pnods to be sure recadon onstnated should be noted oy the two digit code of all shutdowns or signu1 cant power redations are reported. Exmbit G . Instrucuans for Preparanon of Data Entry Sheets Unt:1 a unit has achieved trs first powet generation, no num, for Licensee Ewn Report II.ER) File (SUREC4161).

ber should be ungned to each entry. Systems that do not fit any existmg code should be designa.

ted XX. The code ZZ should be used for those events where DATE. This column should indicate the date of the start a system is not applicable, of each shutdown or signir1 cant power reduuon. Report as year. month, and day. August 14.1977 would be reported COMPONENT CODE. Select the most appropnate component as 770414 When a shutdown or uptfkarit power reducuan from Exhibit i . Instructions for Preparatton of Data Entr>

begins in one report pened and ends m another, an entry should Sheets for Lisensee Event Report (LER) File (NUREC4161),

be made for both report penods to be sure 211 shutdowns using the (oilowing entlenat or ngmflcant power reductions are reported.

TYPE. Use "F" or "S" to indicate ettter " Forced" or "$che.

duled." respectively. (or each shutdown at significant power B.  !( not a component fadure use the related component:

reducuon. Forced shutdowns include those required to be e.g.. wrong valw operated through errott list vsive as uuttated by no later than the weekend followmg discovery component.

of an u(f. normal condition. It is recoptzed that some judg.

ment is required a categortung shutdowns in this way. In C. If a chaan of failures occurs, the first component to mal.

general, a forced shutdown is one that would not han been function should be listed. The sequence of events. melud.

comp!*ted in the absence of the condition tot which corrective ing the other components which fail, should be desenbed acuon was tanen. under the Cause and Correcuve Action to Frennt Recur.

rence column.

DURATION. Self. explanatory. When a shutdown extends Comoonents that do not fit any exastmg code snould be de.

beyond the and of a report period 5ount only the time to the tips'ted XXXXXX. The eode ZZZZZZ ihould be used for end of the report period and sicic up the ensuing down tune to the fullowmg report penods. Report durauon of outages events where a component desapatton is not applicaole.

ruunded tu the neatest tenth u(an hout to factiltate summation.

The sum u( the total outage hours plus tne hours the genera.

CAUSE & CORRICTIVE ACTION TO PREVENT RICVR.

RENCE. Use the column in a narrattw fashaon to ampitly or for was on line thoWd squal the gross hours m the reportmg emplans the circumstances of the shutdown or power redutton.

P'dO4. The column should include the specaric cause for each shut.

Jown or siptitcant pnwer reduction and the immediate and REAs0N. Cmgonae n 'etter Jeuvnattun in acordance sentemeisted lung term correcuve sciton taken 1(speropn.

  • tth ine taole apoearing un the report form. If :stegory H ste. This column should also be used for a Joser.ption of tne must be used.suopty ener .umments.

maior safety.< elated eorrective maintenance performed dunns METHOD Olr $ HUTTING DOWN THE REACTOR OR 'h* 0"'8 d' E"* "d"'"*" *"I"d'"8 "" 'd'""'I'#'I " 'I REDUCING POWER. Catesonde ey numner despauan ' A' #8"I ?*'h "'"Y 8"d * "P*" # '"Y "" U' """' N radioaettvit) or unge radiation exposure spectkaily ususi.

lhe that this Jiffers frem the Ejison E!estne Institut, ated with the outage wruch accounts for more tnan 10 ser.ent IEEll detintuons os "Furged Partial Outage" and "Sene, u( the allowsoinnnual values.

Juled Partial Outave " Fw these terms. FEl uses 4 hange or Fut tung textual reports sonimue nstrat:ve on seestate ;.sper 10 MW as the been tunnt Fur (Jrger puwer re 6 turn.JO MW .nJ reteren.e the shutdown or rmer redu. tion im u.i.

s rs=* imall a .hanpr to warrant erlanallon. nJrrat6ve.

p **

- . _ = . . ..

DockCt No.: 50-316 Unit Name: D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: May 10, 1985 Page: 1 of 2 MONTHLY OPERATING ACTIVITIES - APRIL, 1985 t HIGHLIGHTS:

The reporting period began and ended with the Unit in Mode 1 at 100% power with electrical load at 1135 megawatts.

The Unit remained essentially at 100% power the entire reporting period.

Gross electrical generation for the reporting period was 811,270 MWH.

SUMMARY

4-02-85 At 0608, a power decrease to 97% was started for surveillance testing. Reactor power reached 97% at 0659.

At 0642 CD Diesel Generator was removed from service for maintenance.

At 0647, the AB Diesel while on the load bank tripped (negative sequence trip) and the breaker would not stay closed.

At 0718, the AB Diesel was stopped. The CD Diesel clearance tags had been hung and verified. At 0719, AB Diesel restarted on its own due to a stuck fuel injector. The AB Diesel was manually tripped at 0722 and declared inoperable. An Unusual Event was declared due to both diesels being inoperable.

At 0814, the CD Diesel was proven operable and the Unusual Event terminated.

At 1736, reactor power increase to 100% was started which was reached at 1916.

4-03-85 At 0840, the primary to secondary steam generator tube Icak rate increased significantly from approximately 0.002 gpm to a peak valve of 0.1 gpm. The leak rate has stabilized at approximately 0.03 gpm

D ckSt No.: 50-316

  • ~ Unit Name: D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: May 10, 1985 Page: 2 of 2 4-09-85 At 0600, a power reduction to 97% was initiated to perform surveillance testing. Reactor power reached 97% at 0655.

At 1450,a reactor power increase to 100% was started which was reached at N 1600.

4-11-85 At 0645, Train B of Post Accident Containment Hydrogen Monitoring System has been declared inoperable. It was declared operable at 1821 on 4-15-85.

4-12-85 At 1218, Engineered Safety Feature Ventilation Fan (2-HV-AES-2) was declared inoperable.

4-16-85 At 0601, a power decrease to 97% was started to perform surveillance testing. At 0648 reactor power reached 97%.

At 1430, a reactor power increase to 100% was started which was reached at 1558.

4-17-85 At 1030, Train A Post Accident Containment Hydrogen Monitoring System was declared inoperable. It was declared operable at 1135 on 4-25-85.

4-23-85 At 0600, a power reduction to 97% was initiated to perform surveillance testing. Power reached 97% at 0650.

At 1403, a reactor power increase to 100% was started which was reached at 1600.

4-29-85 At 0419, the Turbine Driven Auxiliary Feedwater Pump was declared inoperable. The pump was declared operable at 2245.

4-30-85 At 0610, a power decrease to 97% was started to perform surveillance testing. Power reached 97% at 0730.

At 1430, a power increase to 100% was initiated. Power reached 100% at 1521.

The Control Room Cable Vault System remains inoperable as of 1707 on 4-14-83. The backup CO 2 System for the Control Room Cable Vault remains operable.

  • . u h:

..' I s +

3 P

d DOCKET NO. L50 - 316 UNIT NAME D. C. Cook - Unit No. 2 v DATE' 5-8-85

-COMPLETED BY B. A. Svensson

. MAJOR SAFETY-RELATED MAINTENANCE APRIL, 1985 n

^

M-1 No. 3 Steam Generator PORV valve, MRV-233 was removed from

~

service to correct a leak-by condition. Replacement parts included plug, seal ring and gaskets. The pilot valve seat was machined and the. pilot valve' stroke checked. The valve was reassembled and a retest was performe's to verify proper

- operation. ,

M-2 During the performance of surveillance testing of 2AB Diesel Generator, the No. l'f,ront cylinder fuel pump linkage failed to close allowing the'! engine to freewheel and produce ele-

. vated exhaust temperature. . The defective fuel pump was re- ' .

placed and a connecting rodsbearing inspection of the affected cylinder was performed.

j w

g.

'O N

W 4

A f

'4

r. mr

C ,<'

, 2. c , ." .

\

h l\ ,

ySt Doneid C. Cook Nuclear Plant ,

P.O. Som 468. Bridgman, Michgan 49106 , O/b

~

May 8, 1985 , ,

%+1 Director, Office Of Management Information

~

-and. Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specificat.ip 6.9.1.6, the attached Monthly Operating Report for the Month.of April, 1985 is, submitted.

~  % .

Sincerely,  %

\ ,

GU-W. G. Smith, Jr 1U *

'5 Plant Manager '\ \"

WGS:ab

. Attachments cc: J. E. Dolan M. P. Alexich _

R. W. Jurgensva NRC Region III B. L.IJorgeneen R. O. Bruggee-R. C. Callen

~

S. J. Hierzwa

+

R. F. Kroeger B. H. Bennett '

P. D. Rennix ,

J. H. Hennigan Z. Cordero J. J. Markowsky J. F. Stietzel J PNSRC File INPO Records Center ANI Nuclear Engineering Department g g

t S. g

\s n,

I

. __