MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
_
lC l
.E.
^
N.R.C. OPERATING DATA REPORT
. DOCKET NO. 50-315 DATE 5/1/85 .
. COMPLETED BY CLIMER I I
e TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 ----------
2.. Reporting Period .
Apr. 85 notes !
3r Licensed. Thermal Power-(MWt) 3411 i
- 4. Name Plate. Rating (Gross MWe) . 1133 . I
- 5. Design Electrical Rating (Net MWe) 1100 t i
- 6. Maximum Dependable Capacity (GROSS MWe) 1100 ! !
4 .7. Maximum Dependable Capacity (Net MWe) 1060.----------------------- ]
.O.DIf Changes Occur in Capacity Ratings (Items no. 3 through 7) Since 5 Last Report Give Reasons _________. .________________ _______ ;
J
~~ ~~~ ~~ ~ ~~ ~ ~ ~~~~
9.-PoweE~LeveI~To Uhich Restr5~ctedI~}[ Any (U~et MU~e5~_~[~~ _ ______________ !
- 10. Reasons For Restrictions. If Any:________________________________ ;
This Mo. Yr. to Date CummsJ.
311. Hours in Reporting Period 719.0- 2879.0 64247.0
- 12. No. of Hrs.-Reactor Was Critical 719.0 2588.0 45669.0 13.. Reactor Reserve Shutdown Hours 0.0 0.0 "O.0-
'14. Hours Gen,erator.on Line 719.0 2569.5 44568.1
-15. Unit-Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2449523 8543603 141621664
- 17. Gross. Elect. Energy Gen. (MWH) 811270 2829380 46614810
- 18. Net Elect. Energy Gen. (MWH) 784146 2732510 44950244
- 19. Unit Servico Factor 100.0 89.2 72.2
- 20. Unit Availability Factor 100.0 89.2 72.2
- 21. Unit Capacity Factor (MDC Net) 102.9 89.5 68.8
- 22. Unit Capacity Factor (DER Net) 99.1 86.3 <67 7
- 23. Unit Forced Outage Rate ,
0.0 .
8.7 12.4
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration): 'I
_1981 g uy11 3.0 tap 3 _sghp_Qg(_tg_stayt,0c,tp3r3,_19g__Es[i, mat 34_@yatioy,_
t 19Le a rs _ - _ - _ - _ _ _ _ _ _ _ - _ _ - - - - _ _ - _ - _ - - - - _ _ _ _ - - - -- - _ - - - --- - _ _ - _ - - - - -
- 25. If Shut Down At End of Report Period, Estimated Date of Startups
- 26. Units in Test Gtatuu (Prior to Commercial Operation):
~orcast Achiuved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
g2gg gobi6 PDR R l/g 1
---._____-.--_._-__.-._-._...___.___-____J _
p .~ ,
! .9<,
V .-
L .
l 1
AVERAGE DAILY. POWER. LEVEL ~(MWe-Net)
DOCKET NO. 316 l;
[ UNIT TWO t DATE 5/1/85 COMPLETED BY CLIMER , l TELEPHONE. 616-465-5901 j i
' MONTH Apr. 85 l AVERAGE DAILY AVE' RAGE DAILY DAY POWER LEVEL DAY POWER LEVEL {
l' 1096 17 1094 '
2 1078 10 1092 1
~3 1097 19 1090
'4 .1097 20 1086: ,
5 1098 21 1087 6-1088 22 1086~ , ;
7- 1091 23 1074; . ,.
O 1090 24 1087 ^ t; .
9 1077 25 1088' E-10 1090 26 1090 t 11: 1092 27 1086 12 1094 28 1097.
13 1089 29 1092 14 1093- 30 1080 15 1096 31 0 16 1082 e
e 6
e
_ _ _ - , .W
e DOCKET No.
50-316 . .
81 NIT SIMIIlW)WNS ANI) POWEM IEEIMM'HONS D.C. Cook, Unit 2 INT NAME IDATE 5-8-85 COMPl.ETEin BY B.A. Svensson REFORT MON Hg April 1985 616/465-5901
. TEl.FFiloNE c.
33 'h ) E .; I kensee @,, 4 Cauw A Canacceive N.. . Inase g 3g j 2gy livens gy gOi Acss.n s..
e fE 5 j;y, g Nep.us = in O g Psevens Recussence 6
There were no Unit shutdowns or sig-None nificant power reductions during the month. The Unit operated at a ca-pacity factor of 102.9% (MDC).
1 2 3 4 12: I:..sccJ Meas.=i: M cah =l: Enlab6 G - lusie ucci. mis S. Lt.cJuicJ A l'agusemacs.: Faehus(I midasal I muual few Psepasasi.us .4 Data B minisenance ai Test 2-maiul Sciaan. Ensey St cces f.u IJcciasce C Refucieng 3 Autuunaise Ssans- livent Heinus (I 1:RI File INilRI'G-
- 1) Regulasiuy Best icssuse 44)ehce (Emplami) 0161) 1 Ogwsas..a Tsaananga lkcaw 1:massenssasauss F-AJoensmasassve 5 G E agicsass.maal Lese:s IIisplassel lixlobst 1 - S.anic busce cl/17) II(kl.cs (E splass)
. . ~ .
w u .~. . ,~...a .n. . .. ; . .. . .- ,a .
UNIT SHUTDOWNS AND POWER REDUCTIONS INSTRUCTIONS This report should descr2e a!! plant shutdowns duttng the in accordance with the taole appearms on the report form.
report persed. In addition. it should be the source o(explan. If category 4 must be used. supply brief comments.
anon of sismficant dips in average power lewis. Each ngni.
(1 cant reducuon in power lent (greater than 20% reduction LICENSEE EVENT REPORT m. Reference the applicable m average dady power lew! (or the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) reportable occurrence pertammg to the outage or power should be noted, even though the urut may not have been reduction. Enter the !!rst four parts (event year. sequent:2!
shut down completelyl . For suca reducuons in power few!, report number, occurrence code and report type) of the tive the duration should be !!sted u zero, the method of reduction part designation as descnbed in item 17 of Instrucuons for should be listed as 4 (Other), and the Cause and Correcuve Preparauon of Data Entry Sheets for Licensee Ewnt Resort Action to ?.ennt Rewrtnce column should explain. The (LER) File (NUREC.0161). This informanon may not be Cause and Correcuw Action to Prewnt bcurrence column immediately evident for all sui.h shutdowns.of eourse. smce should be used to provide any needed explanation to fully furtner invesugation may be required to ucettam whether ur dessnbe the circumstances of the outage or power reduction. not a reportable occurrence was involved.) If the outage or power reduct:on will not result in a reportable occurrence.
. NUMBER. This column should indicate the sequenttal num. the postuve indication of this lack of correlanon should be her assigned to each shutdown or signaticant recussionin power noted u not applicable (N/A),
for that calendar year. When a shutdown or stytticant power reduction begins in one report penod and ends m another. SYSTEM CODE. The system in which the ou.tage.or power an entry should be made for both report pnods to be sure recadon onstnated should be noted oy the two digit code of all shutdowns or signu1 cant power redations are reported. Exmbit G . Instrucuans for Preparanon of Data Entry Sheets Unt:1 a unit has achieved trs first powet generation, no num, for Licensee Ewn Report II.ER) File (SUREC4161).
ber should be ungned to each entry. Systems that do not fit any existmg code should be designa.
ted XX. The code ZZ should be used for those events where DATE. This column should indicate the date of the start a system is not applicable, of each shutdown or signir1 cant power reduuon. Report as year. month, and day. August 14.1977 would be reported COMPONENT CODE. Select the most appropnate component as 770414 When a shutdown or uptfkarit power reducuan from Exhibit i . Instructions for Preparatton of Data Entr>
begins in one report pened and ends m another, an entry should Sheets for Lisensee Event Report (LER) File (NUREC4161),
be made for both report penods to be sure 211 shutdowns using the (oilowing entlenat or ngmflcant power reductions are reported.
TYPE. Use "F" or "S" to indicate ettter " Forced" or "$che.
duled." respectively. (or each shutdown at significant power B. !( not a component fadure use the related component:
reducuon. Forced shutdowns include those required to be e.g.. wrong valw operated through errott list vsive as uuttated by no later than the weekend followmg discovery component.
of an u(f. normal condition. It is recoptzed that some judg.
ment is required a categortung shutdowns in this way. In C. If a chaan of failures occurs, the first component to mal.
general, a forced shutdown is one that would not han been function should be listed. The sequence of events. melud.
comp!*ted in the absence of the condition tot which corrective ing the other components which fail, should be desenbed acuon was tanen. under the Cause and Correcuve Action to Frennt Recur.
rence column.
DURATION. Self. explanatory. When a shutdown extends Comoonents that do not fit any exastmg code snould be de.
beyond the and of a report period 5ount only the time to the tips'ted XXXXXX. The eode ZZZZZZ ihould be used for end of the report period and sicic up the ensuing down tune to the fullowmg report penods. Report durauon of outages events where a component desapatton is not applicaole.
ruunded tu the neatest tenth u(an hout to factiltate summation.
The sum u( the total outage hours plus tne hours the genera.
CAUSE & CORRICTIVE ACTION TO PREVENT RICVR.
RENCE. Use the column in a narrattw fashaon to ampitly or for was on line thoWd squal the gross hours m the reportmg emplans the circumstances of the shutdown or power redutton.
P'dO4. The column should include the specaric cause for each shut.
Jown or siptitcant pnwer reduction and the immediate and REAs0N. Cmgonae n 'etter Jeuvnattun in acordance sentemeisted lung term correcuve sciton taken 1(speropn.
- tth ine taole apoearing un the report form. If :stegory H ste. This column should also be used for a Joser.ption of tne must be used.suopty ener .umments.
maior safety.< elated eorrective maintenance performed dunns METHOD Olr $ HUTTING DOWN THE REACTOR OR 'h* 0"'8 d' E"* "d"'"*" *"I"d'"8 "" 'd'""'I'#'I " 'I REDUCING POWER. Catesonde ey numner despauan ' A' #8"I ?*'h "'"Y 8"d * "P*" # '"Y "" U' """' N radioaettvit) or unge radiation exposure spectkaily ususi.
lhe that this Jiffers frem the Ejison E!estne Institut, ated with the outage wruch accounts for more tnan 10 ser.ent IEEll detintuons os "Furged Partial Outage" and "Sene, u( the allowsoinnnual values.
Juled Partial Outave " Fw these terms. FEl uses 4 hange or Fut tung textual reports sonimue nstrat:ve on seestate ;.sper 10 MW as the been tunnt Fur (Jrger puwer re 6 turn.JO MW .nJ reteren.e the shutdown or rmer redu. tion im u.i.
- s rs=* imall a .hanpr to warrant erlanallon. nJrrat6ve.
p **
- . _ = . . ..
DockCt No.: 50-316 Unit Name: D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: May 10, 1985 Page: 1 of 2 MONTHLY OPERATING ACTIVITIES - APRIL, 1985 t HIGHLIGHTS:
The reporting period began and ended with the Unit in Mode 1 at 100% power with electrical load at 1135 megawatts.
The Unit remained essentially at 100% power the entire reporting period.
Gross electrical generation for the reporting period was 811,270 MWH.
SUMMARY
4-02-85 At 0608, a power decrease to 97% was started for surveillance testing. Reactor power reached 97% at 0659.
At 0642 CD Diesel Generator was removed from service for maintenance.
At 0647, the AB Diesel while on the load bank tripped (negative sequence trip) and the breaker would not stay closed.
At 0718, the AB Diesel was stopped. The CD Diesel clearance tags had been hung and verified. At 0719, AB Diesel restarted on its own due to a stuck fuel injector. The AB Diesel was manually tripped at 0722 and declared inoperable. An Unusual Event was declared due to both diesels being inoperable.
At 0814, the CD Diesel was proven operable and the Unusual Event terminated.
At 1736, reactor power increase to 100% was started which was reached at 1916.
4-03-85 At 0840, the primary to secondary steam generator tube Icak rate increased significantly from approximately 0.002 gpm to a peak valve of 0.1 gpm. The leak rate has stabilized at approximately 0.03 gpm
D ckSt No.: 50-316
- ~ Unit Name: D.C. Cook Unit 2 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: May 10, 1985 Page: 2 of 2 4-09-85 At 0600, a power reduction to 97% was initiated to perform surveillance testing. Reactor power reached 97% at 0655.
At 1450,a reactor power increase to 100% was started which was reached at N 1600.
4-11-85 At 0645, Train B of Post Accident Containment Hydrogen Monitoring System has been declared inoperable. It was declared operable at 1821 on 4-15-85.
4-12-85 At 1218, Engineered Safety Feature Ventilation Fan (2-HV-AES-2) was declared inoperable.
4-16-85 At 0601, a power decrease to 97% was started to perform surveillance testing. At 0648 reactor power reached 97%.
At 1430, a reactor power increase to 100% was started which was reached at 1558.
4-17-85 At 1030, Train A Post Accident Containment Hydrogen Monitoring System was declared inoperable. It was declared operable at 1135 on 4-25-85.
4-23-85 At 0600, a power reduction to 97% was initiated to perform surveillance testing. Power reached 97% at 0650.
At 1403, a reactor power increase to 100% was started which was reached at 1600.
4-29-85 At 0419, the Turbine Driven Auxiliary Feedwater Pump was declared inoperable. The pump was declared operable at 2245.
4-30-85 At 0610, a power decrease to 97% was started to perform surveillance testing. Power reached 97% at 0730.
At 1430, a power increase to 100% was initiated. Power reached 100% at 1521.
The Control Room Cable Vault System remains inoperable as of 1707 on 4-14-83. The backup CO 2 System for the Control Room Cable Vault remains operable.
..' I s +
3 P
d DOCKET NO. L50 - 316 UNIT NAME D. C. Cook - Unit No. 2 v DATE' 5-8-85
-COMPLETED BY B. A. Svensson
. MAJOR SAFETY-RELATED MAINTENANCE APRIL, 1985 n
^
M-1 No. 3 Steam Generator PORV valve, MRV-233 was removed from
~
service to correct a leak-by condition. Replacement parts included plug, seal ring and gaskets. The pilot valve seat was machined and the. pilot valve' stroke checked. The valve was reassembled and a retest was performe's to verify proper
- operation. ,
M-2 During the performance of surveillance testing of 2AB Diesel Generator, the No. l'f,ront cylinder fuel pump linkage failed to close allowing the'! engine to freewheel and produce ele-
. vated exhaust temperature. . The defective fuel pump was re- ' .
placed and a connecting rodsbearing inspection of the affected cylinder was performed.
j w
g.
'O N
W 4
A f
'4
- r. mr
C ,<'
, 2. c , ." .
\
h l\ ,
ySt Doneid C. Cook Nuclear Plant ,
P.O. Som 468. Bridgman, Michgan 49106 , O/b
~
May 8, 1985 , ,
%+1 Director, Office Of Management Information
~
-and. Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specificat.ip 6.9.1.6, the attached Monthly Operating Report for the Month.of April, 1985 is, submitted.
~ % .
Sincerely, %
\ ,
GU-W. G. Smith, Jr 1U *
'5 Plant Manager '\ \"
WGS:ab
. Attachments cc: J. E. Dolan M. P. Alexich _
R. W. Jurgensva NRC Region III B. L.IJorgeneen R. O. Bruggee-R. C. Callen
~
S. J. Hierzwa
+
R. F. Kroeger B. H. Bennett '
P. D. Rennix ,