Text

T

,

~d$

.

M 2 0193L

Docket No. 50-293

Dr. E. Thomas Boulette

Senior Vice President, Nuclear

Pilgrim Nuclear Power Station

Boston Edison Company

RFD #1 Rocky 11i11 Road

Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUIUECT: EMERGENCY PREPAREDNESS (EP) INSPECTION 50-293/92-26

On December 7-11,1992, as described in the enclosed inspection report, Mr. J. Lusher and

others of this office inspected the Pilgrim emergency preparedness program. That inspection

included selected procedure and record reviews, interviews, evaluation of three crews of

operators during table-top exercises,, and inspector observations. Preliminary inspection

findings were discussed with Mr. Rothert and other members of your staff.

The overall conclusion of this inspection was that the Pilgrim EP program was being

effectively administered and implemented. No violations of NRC requiretrents were found.

Testing of the Technical Support Center ventilation system, the reorganization of the

emergency preparedness program, and training on use of the Protective Action

Recommendation (PAR) procedure were identified for further inspection attention.

No reply to this letter is required. Thank you for your cooperation.

Sincerely,

Original Signed By:

James d. Joynor

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: Inspection Report No. 50-293/92-26

9302010116 930120 OFFICIAL RECORD COPY

PDR ADOCK 05000293 * * O.J [a

G PDR  % g l

I,:a _ % h

i

. .

- _

l*

-

Mi 101993

Boston Edison Company 2

cc w/ encl:

E. Kraft, Acting Vice President, Nuclear Operationi, and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

R. Itallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

The lionorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

'

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

Paul W. G omer, Massachusetts Secretary of Energy Resources

Sarah Wocdhouse, Legislative Assistant

A. Nogee, MASSPIRG ,

Regional Administrator, FEMA

Of0cc of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

Of6cc of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Public Document Room (PDR)

12x:al Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident inspector

Commonwealth of Massachusetts, SLO Designee

OFFICIAL RECORD COPY

l

__.

_ __ - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ _ _ _ _

- . .___ . _ - _ . -- .. . . .

.

.

A%' 2 01993J

Boston Edison Company 3

bec w/ encl:

Region I Docket Room (with concurrences and IFS Forms)

DRS/EB SALP Coordinator

J. Linville, DRP *

E. Kelly, DRP

J. Macdonald, SRI - Pilgrim (with concurrences and IFS Forms)

W. Butler, NRR

R. Eaton, NRR

V. McCree, OEDO

OFFICIAL RECORD COPY

,

. - -

- _ _ . _ .

.

-

JAN l 01993.

Boston Edison Company 4

CONCURRENCES:

/Rh,-

RI:DRSS

' JJE for.

RI:DRSS.

h/ G (oR.

RMDRSS RI:DRSS

Lusher Gordon ,

McCabe ner

l#t/93 1/.2/93 1/ /93 1/19'93

OFFICIAL RECORD COPY