ML20112J436
ML20112J436 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 06/01/1984 |
From: | Bell N NUCLEAR INFORMATION & RESOURCE SERVICE |
To: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
FOIA-84-463 NUDOCS 8501180281 | |
Download: ML20112J436 (2) | |
Similar Documents at Vogtle | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999
[Table view]Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20 Category:INCOMING CORRESPONDENCE MONTHYEARML20217P3791999-10-21021 October 1999
[Table view]Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl ML20205H4051999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3891999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1).Page 2 in Third Amend Power Sales Contract of Incoming Submittal Not Included ML20205A9441999-03-25025 March 1999 Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d ML20205H3811999-03-24024 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3621999-03-22022 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81, as Requested IAW 10CFR50.75(f)(1) ML20204G4361999-03-18018 March 1999 Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Vegp,Iaw Requirements of 10CFR50.54(w)(3) ML20204C0591999-03-17017 March 1999 Forwards Rev 0 to WCAP-15160, Evaluation of Pressurized Thermal Shock for Vegp,Unit 2 & Rev 0 to WCAP-15159, Analysis of Capsule X from Vegp,Unit 2 Reactor Vessel Radiation Surveillance Program ML20207K9551999-03-11011 March 1999 Forwards Response to Rai,Pertaining to Positive Alcohol Test of Licensed Operator.Encl Info Provided for NRC Use in Evaluation of Fitness for Duty Occurrence.Encl Withheld,Per 10CFR2.790(a)(6) ML20207L9721999-03-10010 March 1999 Forwards Rev 15 to EPIP 91104-C of Manual Set 6 of Vogtle Epips.Without Encl ML20207B0191999-02-25025 February 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 980701-1231,IAW 10CFR26.71(d) 05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 9812291999-01-27027 January 1999 Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 ML20199F7701999-01-13013 January 1999 Submits Revised Response to RAI Re Licensee 980713 Proposed Amend to Ts,Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Protection Channels. Corrected Copy of Table,Encl ML20199F7981999-01-13013 January 1999 Forwards Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage. Change Bar in Margin of Affected Pages Denotes Changes to Rept ML20199G1381999-01-13013 January 1999 Forwards Copy of Permit Renewal Application Package for NPDES Permit Number GA0026786,per Section 3.2 of VP Environ Protection Plan 05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.731999-01-13013 January 1999 Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 ML20198F6131998-12-18018 December 1998 Forwards Revised Certification of Medical Exam Form for License SOP-21147.Licensee Being Treated for Hypertension. Util Requests That Individual License Be Amended to Reflect Change in Status ML20198L6631998-12-18018 December 1998 Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21 ML20198D9291998-12-16016 December 1998 Forwards Requested Info Re Request to Revise TSs Elimination of Periodic Pressure Sensor Response Time Tests & Elimination of Periodic Protection Channel Response Time Tests ML20198D9991998-12-16016 December 1998 Forwards Responses to 980916 RAI Re Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations ML20198D8171998-12-14014 December 1998 Forwards NRC Form 396 & Form 398 for Renewal of License OP-20993.Without Encls ML20206N3051998-12-0808 December 1998 Submits RAI Re Replacement of Nuclear Instrument Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys 1999-09-20 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20213G8631987-04-20020 April 1987
[Table view]Expresses Concern Re NRC Authorization for Util to Load Fuel W/O Completion of Required Safety Tests ML20212P1461987-01-29029 January 1987 FOIA Request for Documents Re Insp Rept 50-424/86-91 Concerning Drug Abuse at Plant ML20207N6821987-01-0909 January 1987 Requests Record to Reflect Dissatisfaction W/Location of Hearing in Bethesda,Md.Intervenor Agrees to Notify Aslab of Name of Person Presenting Oral Argument Per 861215 Order. Related Correspondence ML20212Q3281986-08-13013 August 1986 Advises That D Feig Will Replace Author on Svc Lists. Related Correspondence ML20198K8641986-05-30030 May 1986 Advises That Georgians Against Nuclear Energy Adopted Filings of Proposed Findings Submitted by Wf Lawless & Hm Deutsch & Motion for Correction of Transcript.Certificate of Svc Appended to Document.Svc List Encl ML20141M8361986-02-24024 February 1986 Forwards Testimony of H Deutsch & Attachment to Testimony of W Lawless,Per 860110 Telcon & ASLB 860114 Scheduling Order.Related Correspondence ML20210K4491986-01-15015 January 1986 FOIA Request for Documents Re NRC Investigation Into Register,L Price & J Register Allegations of Illegal & Improper Procedures at Facilities ML20138P5941985-12-20020 December 1985 Forwards Response to ASLB Ruling on Motion for Summary Disposition of Contention 7 Re Groundwater ML20137Y3661985-10-0101 October 1985 Requests Addition of Author to Svc List for Docketing of NRC Documents Re Facility & to NRR & IE Docketing Lists,If Necessary ML20197C5001985-09-0404 September 1985 Requests NRC Investigation of Alleged Improprieties in Conduct of Util Drug Testing Program.Test Results Manipulated in Order to Harass Employees Voicing Legitimate safety-related Concerns.Related Info Encl ML20127K5431985-06-24024 June 1985 Forwards Joint Intervenors Revised Contention Re Emergency Response at Facility ML20100L1541985-04-0909 April 1985 Discusses Response to 850326 Request for Parties to Attempt to Resolve Discovery Differences.Intervenors & Applicant Have Agreed to Discuss Matters After 850417 Deposition. Certificate of Svc Encl.Related Correspondence ML20154R1221985-03-21021 March 1985 FOIA Request for Documents Re Analysis,Review & Preparation of SER & Memos,Correspondence & Studies Re Seismic Characteristics of Plant Site ML20214F1331985-03-20020 March 1985 FOIA Request for Documents Re Insp Repts 50-424/85-04 & 50-425/85-04 Including Info Re Honeycomb Void Defect in Containment Bldg & Allegation of Improperly Prepared Vertical Const Joint in Radwaste Bldg ML20127F2971985-03-10010 March 1985 FOIA Request for Documents Re Law Enforcement Investigation at Plant Concerning Core Cooling Sys,Including Repts, Studies,Test Results,Correspondence,Memos,Meeting Notes & NRC Allegation Case File RII-84A-0145 ML20112E7461985-01-0707 January 1985 Comments on Des ML20112D8331985-01-0707 January 1985 Advises of Incorporation of 850107 W Lawless & 850103 Je Gordon Comments Into 850104 Comments Re Des (NUREG-1087) ML20112A6901985-01-0606 January 1985 Comments on Des.Ebenezer Creek Swamp Area Will Be Adversely Affected as Result of Transmission Lines.Adverse Impact Expected for Some Endangered Species.Des Should Not Be Approved Until Questions Resolved ML20112B4961985-01-0505 January 1985 Forwards Comments Re Des (NUREG-1087).Further Info Needed on Page 8 of Des Re Routing Another 230-kV Line to State of Sc. Main Purpose of Operation of Facility Is Out of State Sales ML20113H9841985-01-0404 January 1985 Submits Comments on Des (NUREG-1087).Plant Operation & Placement Into Rate Base Would Cause Electric Rate Increases,Economic Dislocation,Rising Unemployment & Industry Shutdown ML20112A9651985-01-0404 January 1985 Requests NRC Conduct Public Hearings on Des Re Operation of Plant Due to Magnitude of Environ & Economic Impacts on Citizens of State of Ga.Need for Power Issue Should Be Included in Future Environ & Economic Analyses ML20113J0071985-01-0303 January 1985 Requests Public Hearing on Need for Facility Prior to Issuance of OL ML20101Q7591985-01-0303 January 1985 Comments on Des.Consideration Not Given to Possible Routes for Spent Fuel Transport,Evacuation,Projected Cost Estimate for Shipping Spent Fuel & Onsite Storage Facilities. Responses to Concerns Requested ML20101G5781984-12-20020 December 1984 Forwards Author Affirmation of Responses Prepared for Interrogatories in Proceeding.Certificate of Svc Encl. Related Correspondence ML20101G7071984-12-19019 December 1984 Forwards Response to NRC Second Set of Interrogatories. Response Available for Insp & Copying at Ofcs of Citizens for Prosperous Georgia.Related Correspondence ML20108E1531984-12-10010 December 1984 Forwards Response to NRC Interrogatories 1-7.Related Correspondence ML20093L0111984-10-10010 October 1984 Forwards Joint Proposed Rev to Contention 8 Re QA Program. Rev Narrows Focus on Proposed Contention ML20154R1141984-08-30030 August 1984 FOIA Request for Documents Re Analysis,Review & Preparation of SER & Memos,Correspondence & Studies Re Seismic Characteristics of Plant Site ML20137K7241984-08-0606 August 1984 FOIA Request for Documents Re SER & Des for OL Stage. Documents Re Analysis,Review & Preparation of SER & EIS Also Requested ML20107J0501984-08-0606 August 1984 FOIA Request for All Documents Re Analysis,Review & Preparation of SER for CP Stage of Facility ML20140C7201984-06-13013 June 1984 Forwards Second Amend to Suppl to Petition for Leave to Intervene & Request for Hearing.Amends Concern Contentions CPG-2,CPG-3 & CPG-11 ML20112J4361984-06-0101 June 1984 FOIA Request for Documents Re SER - OL Stage for Facilities ML20101D9151984-05-23023 May 1984 FOIA Request for Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle Nuclear Power Plant ML20087P0851984-03-29029 March 1984 Requests Any Hearings Re Facility Be Held in Burke County, Ga.Residents of Burke County Will Benefit from Positive Impact & Suffer from Negative Impact of Facility & Should Be Heard ML20112E5911984-03-23023 March 1984 FOIA Request for Documents Re Allegations,Insps & Investigations Concerning Possibility That Portions of Plant Built 10 Ft off-grade ML20080R7561984-02-24024 February 1984 Requests That Hearings on Contentions Be Held in Atlanta Rather than in Waynesboro or Augusta to Accommodate Local Residents.Certificate of Svc Encl ML19291A8561979-08-21021 August 1979 Requests Consideration of Georgians Against Nuclear Energy Request for Rehearing on Const License for Facility ML20125A8601979-08-0909 August 1979 Requests Addl Attention to Request of Georgians Against Nuclear Energy Re Rehearing on Const & Licensing of Proposed Plant 1987-04-20 |
Text
- .
~4,
(:?f >;
t=) s rowd$li-r_
l\ucear In"ormation anc Resource Service l 1346 Connecticut Avenue NW. 4th Floor. Washington. O C 20036 (202)295 7552 June 1, 1984 James M. Felton, Director Division of Rules and Records Office of Adminstration FREEDOM OF INFORMATK)N U.S. Nuclear Regulatory Commission ACT REQUEST Washington, D.C. 20555 hp fy ,yg FREEDOM OF INFORMATION ACT REOUEST k/ gg
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 U.S.C. 522, as amended, the Nuclear Information and Resource Service re-quests the following documents regarding the Safety Evaluation Report for the Vogtle nuclear power plant for the operating license stage. Please consider ' documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, meeting minutes, working papers, graphs, charts, diagrams, notes and summaries of conversations and interviews, computer records, and any other forms of written communication, including internal NRC Staff memoranda. In your response, please identify which documents correspond to which requests below.
Pursuant to this request, please provide all documents pre-pared or utilized by, in the possession of, or routed through the NRC related to:
l
- 1. Analysis, review and preparation of the Safety Evaluation Report for the operating license stage for the Vogtle Nuclear power plant, including all memoranda, correspondence and draft inputs.
l In our opinion, it is appropriate in this case for you to waive copying and search charges, pursuant to 5 U.S.C.
552 (a) (4) ( A) "because furnishing the information can be considered as primarily benefiting the general public." The l Nuclear Information and Resource Service is a non-profit l
l 8501180281 840601 PDR FOIA DELL 84-63 PDR l
1
2 --
organization serving local organizations concerned about nuclear power and providing information to the general public.
Sincerely,
- 25 Nina Bell Nuclear Safety Analyst cc