Updates Status of Full Core Reserve at Facility.Full Core Reserve Will Be Lost During Outage Scheduled for Early 1986 If Fuel Performs Properly During Future Operating Cycles
ML20078K696
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/13/1983
From: Maupin M
HUNTON & WILLIAMS, VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Wolfe S
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OLA-1, ISSUANCES-OLA-2, NUDOCS 8310190200
Download: ML20078K696 (3)


Text

9 g-DOCKETED HUNTON & WILLIAMS USNRC 707 East MAIN STntti R o. box 1535 9 3 & T SusLo. .

R O, fon 8o0 R1cumown,vzROINIA 23212  % @} .h ,cM p.c.somesaac

.A Ave gc, . w, KALEien, esomtn cAnoussa atson wasumoton, a c.aco3e

****'** TELEPMONE 804-788 8200 r.9.,v..om ca .vo**"

0FFICE OF "0'd'O*0*-8-50-20-54-1 m o. som **** October 13, 1983 00CKETING & SEHW8-50-20-55-1 esDKr$6st, veneesseA 33864 BRANCM*-

44**tas Seos pimECT DIAL No. So* 788 Honorable Sheldon J. Wolfe Atomic Safety and Licensing Board Panel DOCKET NUMBER -Ch-f U.S. Nuclear Regulatory Commission K00. a E N. -

t Washington, D.C. 20555 C0C CT NUMBER q_-g g PROD. L UTIL FAC..W. . . ...... .

d-}

Virginia Electric and Power Company OLA-1 and OLA-2

Dear Judge Wolfe:

In the Applications filed by Virginia Electric and Power Company (Vepco) in these proceedings, Vepco estimated that it

, would lose full core discharge capability at Surry "as early as j the fall of 1984." This letter will bring you up to date on the status of Vepco's full core reserve at Surry.

At the time the Applications were filed, Vepco had ahead of it four refueling outages (two at each Surry Unit),

including the late 1984 outage at which it was estimated that full core reserve would be lost. Changes in operating schedules and cycle energy requirements, combined with the appearance of defective fuel in a recently completed Surry j operating cycle, caused minor adjustments in the Company's reload plans after the Applications were filed. As a result, as recently as a month ago, Vepco estimated that it would lose full core reserve at the Surry Station in early 1985, by two fuel assemblies.

Still more recently Vepco completed back-to-back refuelings of Surry Units 1 and 2 and, in that connection, undertook a reevaluation of its core design and fuel i

requirements for the next two outages, scheduled for late 1984

~

and early 1985. Vepco has now completed the reevaluation. It indicates that Vepco will not lose full core reserve during the outage scheduled for early 1985 after all, but will lose it instead during the Surry Unit 1 outage scheduled for early 1986. This conclusion assumes, of course, that Vepco's fuel will perform properly during future operating cycles. If additional fuel proves to be defective, it could cause a substantial revision in this estimate.

8310190200 031013 gDRADOCK 05000338 903

dl Howrow & WILLIAus Honorable Sheldon J. Wolfe October 13, 1983 Page 2

It is important to emphasize that a one-year delay in the loss of full core reserve dces not mean that Vepco may postpone the commencement of its shipping program for a year. Had Vepco's most recent prior estimate--that it would lose full core reserve in early 1985 by only two assemblies--been correct, Vepco would have wanted to begin shipping Surry fuel to North Anna in the fall of 1984. If necessary, it could have waited until just before the early 1985 outage to begin shipping, but this would have left no time for decling with c unexpected developments _should.they have arisen. Under its new estimate, Vepco-will lose full core reserve in early 1986 by 58 assemblies and,..in the fall of.1986L by an additional 61 assemblies, unless it provides more storage space for Surry fuel. In order (a) to ensure that a sufficient number of assemblies is removed from the Surry pool prior to the early 1986 outage, (b) to avoid shipping during bad weather or while i

an outage is underway at one of Vepco's nuclear unite nnd (c) ,

to provide for contingencies, Vepco ought to begin-shipping Surry fuel to North Anna by the summer of 1985. In short, the one-year delay in the loss of full core reserve translates into a much' smaller change in the time when the Surry-to-North Anna shipping campaign ought to begin.

There is another development that might affect loss of full core reserve at Surry. Pursuant to the Nuclear Waste Policy Act, the Department of Energy (DOE) solicited proposals for a dry cask demonstration program. In August 1983, Vepco submitted a proposal recommending, among other things, that it ship Surry spent fuel assemblies to a federal site for dry cask storage and for certain research and monitoring work. DOE has l recently announced that it will enter into negotiations with ~

Vepco with the object of reaching agreement on such a demonstration project. It is too early to predict precisely what DOE and Vepco might agree upon. But if such a progran is implemented by the parties, it could further affect the le-e. of l full' core reserve at Surry.

_ If you have any questions on these devclopments, I shall '

j be happy to answer them.

j Sincerely, l

biotd. D -

Michael W. Maupin l 42/821 l

l l

wrv=- y,-- e.--,+-wr-- -,Wy ge,p - w --a,.g.,c T'-'-r- T '8'y-- -

g@ M'h tg e ,nd-- @__h_,-.e,

/l '

Howrox & WILLIAxs Honorable Sheldon J. Wolfe October 13, 1983 Page 3 cc: Honorable Jerry Kline Honorable George A. Ferguson Henry J. McGurren, Esq.

J. Marshall Coleman, Esq.

James B. Dougherty, Esq.

Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Secretary, U.S. Nuclear Regulatory Commission Attention: Chief, Docketing and Service Section 1

f

.N

"