_ _ _ . _ . _ _ . _ _ _ . . . _ . _ . . _ . _ _ . _ _ _ _ _ - - _ _ _ . _ _ . _ _ _ .

OFERAtlN6DATAREPORT I

DDCrli NO $0-413 i

l' ATE Detesber 16. 1990 QPEAATINGSTATUS COMPLETEDBy F.A. Willi m TELEPHONE 704 373-5957

1. Unit Note: Catawba 1

- 2. Reporting Periods Novesber 1, lo90 Novesber 30,1990

3. Licensed Thersal Ptver (MWtli 3411 4, Naseplate Rating (6 toss MWe): 1305s Notes *Nastplate Retirig 5.DesignElectricalRating(WetMWeli 1145 (BrossMWelcalculatedas
6. Marious Dependable Capacity (6 toss M"eli- 1192 1450.000MVA .90 power 7.MaissusDependableCapacity(httMWe,# lip factor per Page ill, B. If thanges Octor in Capacity Ratings uters Wester 3 Through 71 Sinre Lest NURE6-0020.

Peport. Give Reasonsi .

9.PowerLevelleWhichRestritted,IfAny(NetMWelt 10.ReasonforRestrictions,ifanyi ihls Month Yr. to-Date Cusulative

11. Hours in Reporiing Peried .

720.0 0016.0 47545.0

12. Nusber Of Hours Reactor Was Critical- 720.0 5604.9- 35273.7
13. Reactor Reserve Shutdown Hours - ~0- - 14. Hours Benerator On-Line 720.0 5534.9 34420.9
15. Unit Reserve Shutdown Hours ~0- --0-- 16, 6 toss iberaal Energy Benersted (MWH! 240325? IB295452  !!0620557
17. Bross Electrical Energy Generated (MWH) 05B562 6425044 36877665 18.NetElectricalErergyGenerated(MWW) 814897 6029082 36425460 19.UnitServiceFatter 100.0 69.1 72.4 20.UnitAvailabilityfactor 100.0 69.1 72.4
21. Unit Capacity factor (Using MDC Net) 100.3 66.6 67.4
22. Unit Capacity Factor (Using DER Net) 98.B 65.7 66.9 23.UnitForced.DutageKate _

0,0 10,1 12,9 theduled Over Neit 6

20. Sh' Nefue tdsen (ling - March 12, 1991-Dwee Months (Type and Duration of Each):

Date, ks

25. If Shut Deut. t,t End Of Report Period. Estisated Date of Startup:
26. Units in Test Status (Prior to Cessercial Operationit forecast Achieved INlilALCR!ilCAlliy IN!TIALELECTRICliy COMERCIAL OPERAT10N 9012180291 901214

, PDR ADOCK 05000413 R PDR

.-w-.-- - ,--, . - -, .. ,r-,, 3 ...,.,vp...yy..__,w, . ,y_.,,_,#w4, y.. , , , . , .e., g, .- . , , _ . _ . , . , _.,_--_-r.-.,...c.., ,u_ - - , . . - y ., ,

D'ERAtlN6 DATA REPORT DDCLET NO 50 613 UN!I Cet eta 1 DATE Dttester 14,1990 COMPLETEDBY P,A, Willl m TELEPHONE 704 373-59B7 >

90 NTH November. 1990

[4] AVERA6EDAILYPOWERLEVEL DA1 AVERAGEDAILYPOWERLEVEL (MWe-hel) (MWe4 ell ,

1  !!27 17 1134 2 1191 18 1138  ;

3 3 il30 19 1137 4  !!29 20 1132 5 1126 El 1134 6 1130 22 1133 7- 1131 23 1131 8 1135 24 1134 9 1134 25  !!33 to 1130 26 1132

!! 1119 - 27 1129

[

12 1134 20 1121 13  !!37 29 1130 14 1159 30 1136

!$ i135 ,

16 1132

. . - . - . _ . . . - . - - . . . - . . - . , , - - . - _ - _ _ , . - . - - . . - . , - , . - . = . . - . - . , _ - _ . . . . . . . - . - . . - . . . - . . - . . . . . .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 -

UNIT NAME uTAw BA 1 DATE 12/14/'30 REPORT MONTH November 1990 COMPLETED BY s. w. Mustx TELEPHONE (ius)-aiJ-didz (1) (4) (5)

{2) _

E HOD T A OF LICENSE M Y S SHUT EVENT SYS- CAUSE AND CTIRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S i

4 (1) (2) (3) (4) i i

F Forced S Scheduled Reason:

A-Equipment Failure (Explain)

Method:

1-Manual Exhibit G - Instructions for Preparation of Data B-Malnuenance or test C-Refueling 2-Manual Scram Ent W Sheets For Licensee 3-Automatic Scram (LER D-Regulatory Restrictiory , , 4-Other (Explain) Event File Report (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain) l l

> . _ _ - _ . _ _ . _ _ _ _ . _ _ _ _ _ . . = _ _ _ . _ . . _

DOCKET NO: 50 413 UNIT: Catawba 1 DATE: 12/14/90 NARRATIVE

SUMMARY

t MONTH: November 1990 Catawba Unit 1 began the month of November operating at 100% full power.

The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power, Prepared by: S. W. Moser Telephone: 704 373 5762 3

... - . . . _ . . . ~ , . , , . . _ . . . . _ , -.. . , _ , , _ . _ - , _ . . ~ . . . . , . . _ . . . _ . , _ . , . _ . _ . . . , , r. _ . _ , __ . _ . - . , _ _ . , _ , _ . . , , . . , , , . . _ . . - , , - . . . _ . . .

_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ = . - _ _ _ _ _ _ _ _ _ _ _ . _ . - _

w MONTALY REFUELING INFORMATION REQUEST

1. Facility Name: Catawba. Unit 1
2. Scheduled next refueling shutdown: March 1991
3. Scheduled restart following refueling: June 1991
4. Will refueling nr resumption of operation thereafter reouire a technical a

. ecification chn cc or other license amendment? No If yes, what will these be?

if no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6, important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent f uel pool: 264
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
h. Projected date of last refueling which can be accommodated by present-licensed capacity: September 2009 DUKE POWLR COMPANY DATE: December 14. 1990 L

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

l OFEFAllhB DATA FEFORT 00ttET ND  %-414 0ATEDetester 14. 1990 OPEufl% STAN1 COVLETEDSY R.8. Williar ,.

TELEPHONE 704-373-59D

1. Unit haset h tawba E
2. Reperting Feriod W ateter 1, 1990-Novceter 30,1990
3. Licensed Thereal Po,er (MWtli 3411
4. Nameplate Fating (Stoss MWe): 1305 Notes 'Nastplate Eating
5. Design Electrital Fating (Net MWe): 1145 (6ross MWel calculated as
6. Marious Dependable Capacity (Brist MWe): 1192 1450.000 MVA s .90 poner
7. Matteue Dependable Capacity (Net MWelt 1129 f atter per Fage lii,
8. If Changes Occur in Capetity Eatings (Ite:5 Nueber 3 Through 7) Since (nt NUFEG-0020.

ftport.GiveReasons:

9. Power level to Which Feltricted, if Any (het MWe):
10. Reason For Restrictions, If ano This Month Yr.-to-Date Cueulative
11. Hours in Reporting Feriod 720.0 0016.0 37561.0
12. Nusber Of Heur$ Reactor Was critical 720.0 5303.5 26654.0
13. F.eatter Reserve Shutot+n Hours --0-- --0-- --0--
14. Hours Benerater On-Ltr'e 720.0 5242.2 26197.0
15. Unit Reserve Shutdc$n Hours --C - - - 16. Gross Thereal Energy Benerated (MWH) 2399145 16728694 B0901294
17. Eress Electratal Energy Benerated (MW) 853013 598124'l 20597413
18. Net Electrical Energy Cenerated (MilH) 809437 5615676 26760692
19. Unit Service Factor 100.0 65.4 69.8
20. Unit Availability Factor 100.0 65.4 69.0
21. Unit Capacity factor (Using MDC Net) 99.6 62.1 62.B
22. Unit Capacity Fattor (Using DER het) 98.2 61.2 62.2 7 E3. Unit Forced Outage Rate 0.0 1.8 14.9
24. Shutdan Scheduled Over heat 6 Months (Type, Date, and Duration of Eachh

.__ Nano

'25. If Shut Down At End Of Report Period. Estisated tate of Startup:

26. Units Ift fest Status (Prior to Coseercial Operation): Forecast Achieved INiilAL CRif!CAllit INiilAL ELECTRICliY COMERCIAL OPERAT10N 1

OPERAllN6 DATA REPDR1 DOELE1 ND 50-414 UNIT Estamba 2 DATEDeceober 14. 1990 COMPLETEDBY R.A Willi m

- !![ PHONE 706-373-5987 90ti1H Noyether,1994 M. MERABE DAILY POWER LEVEL E AVERABE DAILY POWER LEVEL, (MWe-Net) (MWe-Net)

I 1128 17 -1127 2 1128 10 1130 3 1127 19 1122 4 1126 20 1124 5 1121 21 1124 6 'i129 22 1122 7 1129 23 1097 8'  !!30 24 - 1120 9 1191 _ R5 1122 10 _

1127 26 1127 11 ML 27 1118 12 1127 28 1110

'3

, 1129 29 1123

-14 1124 30 ,_

!!29 15 1l29 16'- 1127

)

l ll ~ .

l UNIT SHUTDOWNS ANE ?OWER REDUCTIONS DOCKET NO. 50-414 -

UNIT NAME CAfAW6A 2 DATE 12 /14/ v u November 1990 COMPLETED BY s. w. Must,x -

REPORT MONTH TELEPHONE ( / v4 ) -3 / J-:) / 62 (1) (3) (4) (5) d)

(2 E

SEi-HOD T A OF LICENSE CAUSE AND CORRECTIYZ N Y S SHUT EVENT SYS- .

I P DURATION O Dn'4N REPORT TEM COMPONENT ACTION TO O CODE CODE PREVENT RECUP"lsCE

. DATE E HOURS N R/E NO.

NO SHUTDOWNS OR REDUCTION S l

(2) (3) (4)Exhibit G - Instructions (1) Reason: Method:

F Forced 1-Manual for Preparation of, Data S Scheduled A-Equipment Failure (Explain) 2-Manual Scram Entry Sheets For Licensee B-Mainwenance or test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Other (Explain) File (NUREG-Ol61)

D-Regulatory Restrictior ,

E-Operator Training & Licen3a Examination (5)Exhibit I - Same Source F-Administrative G-Operator Error H-Other (Explain) (Explain)

,, z ,

i E

i *.

o.

DOCKET NO: 50 414 UNIT: Catawba 2 DATE: 12/14/90 NARRATIVE

SUMMARY

MONTil: November 1990 Catawba Unit 2 began the monti. of November operating at 100% full power.

The unit operated at or near 100% full power for the entire month, ar.J ended the month oparating at 100% full power.

Prepared by: S. W. Moser Telephone: 704 373-5762

4 MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Catawba, Unit 2
2. Scheduled next refueling shutdown: September 1991
3. Scheduled restart following refueling: November 1991
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by >fety Review Committee regarding unreviewed safety questions? N/A

5. Scheduled date(s) for submitting proposed licensing ac.; ion cnd supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 204
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ----
9. Projected date of last refueling which can be accommodated by present licensed' capacity: September 2011 DATE: December 14, 1990 0VKE POWER COMPANr Name of

Contact:

J. A. Reavis Phone: 704-373-7567

., - - . . . , - , -_ . - .