ML20065A568

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including PT/O/A/4600/06 Re Exercises & Drills & PT/O/A/4600/11 Re Function Check of Emergency Vehicle & Equipment
ML20065A568
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/01/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065A538 List:
References
NUDOCS 8302220087
Download: ML20065A568 (2)


Text

.

DUKE POWER GOMPm P.O. BOX 33180 CHAMLOTFE, N.o. 28242 rcterno.<m HALB. TUCKER vna rarsansert (704) 373-4531 February 1, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Atte:ntion: hs. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Enclosed for NRC Staff use and review are two copies of the latest revision to the following McGuire Nuclear Station Emergency Plan Implementing Procedures:

1) OP/0/A/6200/48 " Operating Procedur4 for the Operation of the Post Accident Liquid Sample System" (Changes 0-0, dated January 5,1983)
2) HP/0/B/1009/08 " Evaluation of a Reactor Coolant Leak Inside Containment" '

(Changes 0-0, dated January 11, 1983)

3) HP/0/B/1009/09 " Release of Radioactive Materials through Unit Vent Exceeding Technical Specifications" (Changes 0-2, dated January 11, 1983)

! 4)* PT/0/A/4600/06 " Exercises and Drills" (Changes 0-0, dated Janaury 17, 1983)

5) PT/0/A/4600/ll " Fun: tion Check of Emergency Vehicle and Equipment" (Changes 0-2, dated January 5, 1983)
6) Station Directive 3.7.3 " Bomb Threat / Bomb Search Plan" (Revision ll,

]

dated January 17, 1983)

By copy of this letter, one copy of each of the above documents are being provided 4 to the NRC, Region II.

Very truly yours, j

Hal B. Tucker WHM/php Enclosure 8302220087 830214 PDR ADOCK 05000369

! F PDR .

=*ee- w=,e ,----,m~.,_ . - . . . .

- - . ,, ,, -.m, , y+-

~ ~ ^ '

}l

. l Mr. hsrold R. Denton, Director February.1, 1983 Page 2 i

i cc: Mr. James P. O'Reilly, Regional Admir.istrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100.

Atlanta, Georgia 30303

'(w/o enclosure)

Senior Resident Inspector McGuire Nuclear Station a

4 4

e i

1 i

9 i

t a I f

,- - - - . - - , , - . , y,. , -- ,rr