ML20059J460
ML20059J460 | |
Person / Time | |
---|---|
Site: | Catawba ![]() |
Issue date: | 08/31/1990 |
From: | Tucker H, Robert Williams DUKE POWER CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9009200003 | |
Download: ML20059J460 (13) | |
Text
- -- -- _
, W [
. n- . eil
.*L ._ I) uke l%urr Company , (704,373,qng;
~*'
.. l'0 liox 11189 Charlotte, hc 28242 DUKEPOWER SepteEN184,1990
- - 'l
-U.:S. Nuclear Regulatory Commission
' Attention:- Document' Control Desk.
-- Washington,.D; C. -20555 Re:, Catawba Nuclear Station . .
- Docket No.: 50-413 and--50-41M
Dear Sir:
Please! find attached information concerning the performance and operating status of the Catawba Nuclear Station for~the month of' August 1990.
~
Very truly yours, Hal B. Tucker i j
JAR /15/ jar ,
Attachment xc: Mr. Stewart D. Ebneter INP0 Records Center:
Regional Administrator, Region II Suite 500 .
l S.- Nuclear Regulatory Commission 1100' Circle l75 Parkway
~
U'.
Mr. Richard-G. Oehl, NE-44 American- Nuclear Insurers U. S. Department of Energy c/o Dottie~Sherman, ANI Library
'19901 Germantown Road The. Exchange, Suite-245 ;
Germantown, Maryland 20874 270 Farmington. Avenue '
Farmington, CT 06032_ i Mr. W. T. Orders Ms. Vickie White- .
NRC Resident Inspector Nuclear Assurance Corporation; Catawba Nuclear Station 6251 Crooked Creek Road- i Norcross, Georgia 30092:
~
'9009200003 900831 j PDR ADOCK O$000413 '
iR PDC { 6 2.84 -
,g y
7 -- ,
w ,
n a
DPERAi!N6'DATAREPORT.
i
~
DOCKET ND 50-413-
! DATE Scotenber 14. 1990 OPERATIN6 STATUS COMPLETEDBY R.A. Willines JTELEPHONE- 704-373-5907 ;
3.UnitHase:Catawbat- .
- 2. Reporting Feriod: August 1,1990-August 31,1990.' ;
- 3. Liter:sedTherealPower(Mt):. 3411,
- 4. Nameplatt Rating (Bross Me): - 13055 NotecltNaseplateRating- [
- 5. Design Electrical Rating (Net M elt' 1145 (Bross We) calculated as ;
- 6. Mazinus Dependable Capacity (6tess me):: 1192 1450.000 MVA i .90 power <
- 7. Marisus Dependable Capacity (Net We): 1129 .
factor per Page til,
- 8. If Changes Occur in Capacity Raiings (Itees Nusber 3 Through 7) Since Last' NURE6-0020.-
Report,GiveReasons
- 9. Power Level To Walch Restricted,_lf Any (Net We):
- 10. Reason For Restrictions, If any:
LThisMonth;,Yr.-to-Date Cueuldive
!! Hours in Reporting Period 744.0: - 5831.0 45360.0~
- 12. Nueber Of Hours Reactor Was Critical 744.0 3489.0 '33157.8
- 13. Reactor Reserve Snutdown Hours- --0--- --0" --0-*-
- 14. Hours Benerator On Line 744.0 - 3429.5- 32315.5
- 15. Unit Reserve Shutdown Hours --0--- --0-- --0--
( 16. Gross Thersal Energy Generated ( MH) 2496182' 103855964-l11322859l l 17. Gross Electrical Energy Generated (NH) 870413~ 3963377 36416198 IB. Net Electrical Energy Generated (MH) 823466 3700066 34096444
- 19. Unit Servi:e Factor 100.0 58.8 71.2
- 20. Unit Availability Factor :100.0 - 50.0 - 71.2
- 21. Unit Capacity Factor _(Using MDC Net) 99.0 56.2- 66.1
- 22. Unit Capacity factor (Using IER Net) 96.7i . 55.4 = 65.7 23.' Unit Forced Outage Rate 0,0 " 13.7- 13.5
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Nnno
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startupt-26.UnitsinTestStatus(PriortoCommercialOpration): -Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY i
COMERCIAL OPERATION
T .,a
~r
--!!( fig 9
>;c v-
, .a .
=---
, ;; .. v -
- ..- ji 1 1
5n 3.. *
- ~
- OPERATINGDATA_REPORii
+
o x; -
DOCKET NO - 50-413 -
. Imli - Catasha !=
DATE Sentenber 14. 1990:-
3 * :COMPLETEDBY R.A. Willians=
TELEPHONE 7%-373-5997 9, .
J f
MONTH' -Auntsti1990' e
~ LAJ, AVERA6EDAILYPOWERLEVELl d AVERA6E DAILY POWE!! LEVEd 96J ?-
(MWe-ket) >
(Inle-Net) t m
.g , 4 r> ,
1 1114 1 )17; - 1109 - <
2 1117 IBf; 1106 3 1116 il9{f 1104+ ,
4 1100 20 1103 5 1109'- 1 21l , -
1107
.a 6' 1110 t 22\ '1109-
- 7. 1110- ? 23 : 1109
-8 1109 24'
- 1104-9 1100 25. 1102' , , , , .
10 1112 ' _ E26 - 1100 11 1108 l 27 - 1101 l 1
12 =1089 '28 -1104- !
13 1100 29 11 % ,
a 14 -1108 '30 ,
1109 l
-15 -1106 31 1100
> j
.16 1106 ,
\
o
- j I
s
. q 4
f , 1
g %
.: =- -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKF"*/ NO.. 50-413 .
- - UNIT NAME- uTAwtsA 1 DATE' Uy/14/ y u --
REPORT MONTH August 1990 COMPLETED BY s. w. Must;x .
TELEPHONE tevej-Jea-3/02 (1) 2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- - CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT. TEM COMPONENT ACTION TO-0 DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (2 (3 (4bxhibit G -- Instructions
'(1h' Forced -
eason- ethod:
S Scheduled 1-Manual 'for Preparation of, Data A-Equipment FailureB-Maintenance.or test (Explain)' 2-Manual . Scram Entry: Sheets For Licensee C-Refueling 3-Automatic Scram Event Ee rt (LER D-Regulatory R9striction- , .
..4-Other (Explain)- File ( '
G-0161))'
E-OgeratorTraining-ELicenseExaminatloa r r or xhibit I - Same Source H-O her (Explain) (Explain)
-+
J'4*" - " - - -
J- M 'm="" '
w me -e' - -h -e . -'--ertw -->2
-maem- .-
-._mi-e
.a . -
., t f
o .
, N
,t l' DOCKET NO: 50-413 li .
i l, '
. UNIT: Catawba 1- ,
DATE: 09/14/90; NARRATIVE
SUMMARY
MONTH: August;1990 l
Catawba Unit 1 began the monthLof August operating at-100% full power.. ,
The. unit operated at,or near 100% full power for the sntire month,=and1
~
ended the month: operating at 1006.fu11-power.
9 l
t-K l'
l' l-l
. t l l g Prepared by: S. W. Moser Telephone: 704-373-5762 l l
s s lii o .
.t
.,- .o l
t a -i- MONTHLY REFUELING INFORMATION RE0 VEST' .
L 1. Facility name:: Catawba.' Unit 1 _
- 2. Scheduled next refueling: shutdown: March 1991 ,
}
- 3. Scheduled restart-following' refueling: June'1991 j i
- 4. . Will' refueling or resumption of operation thereafter require'aLtechnical; j , ,
R specification change or other license amendment?' . No-If.yes, what'will these be?
If no, has reload design and core configuration been reviewed by. Safety..
Review Committee regarding unreviewed safety questions?'N/A~'
l S. Scheduled date(s) for submitting propose'd licensing' action 'and supporting.
i information: N/A l
" 6. Important licensing considerations (new or different design or' supplier..
unreviewed design or performance analysis methods, significant changes in :l L design or new operating procedures). !
- 7. Number of' fuel assemblies'(a) in the core:'193 (b) in'the spent fuel pool: 264-i
- 8. Present licensed fuel pool capacity: 1418 .
Size of requested or planned increase: - i
- 9. Projected date of last refueling which can be accommodated by present ,
licensed capacity:. September 2009 1
- i i
L DUKE POWER COMPANY DATE: September 14, 1990 4 I
L Name of
Contact:
J. A. Reavis phone: 704-373-7567 ,
m'
=.
DPERAilk6DAlf.REPCRI-I' DOCKET NC 50-414 -
1 DATE Sentreber 14. 1990
~'
OPERATING STATUS- COMPLETEDBY R.A. Pillians TELEPkONE 704-373-5987 q
- 1. Unit hase: Catawba 2 _
2.ReportingPeriod: August 1,1990-August 31,1990,
- 3. Licensed Thereal Power ( W t): '~ 3411 ,; 7
- 4. Naseplate Rating (Gross Melt *
- 10054 ' Notes eNaseplate Rating-
- 5. Design Electrical Rating (Net Weh 1145 (Bross MWel calculated as .
- 6. Marisue Dependable Capacity (Bross We) - -!!92 1450.000 MVA x'.90 power.
-7. Natious Dependable Capacity (Net MWeh = 1129 ..
factor per Page lit, ,
. B.' If Changes Occur in Capacity Ratings (Itess Nueber 3 Through 7) Since Last - NURE6-0020.
Report.GiveReasons ;
- 9. Power f.evel To Which Restricted,,if Any (Net Welt-10.ReasonForRestrictions,ifanyt s
This Month-- Yr.-to Date- Cuau'tative -
!!. Hours in Reporting Feriod.
744.0' 5831.0 - 35376.0'
- 12. Ntaber Of Hours Reactor Was Critical 0.0 3789.4. 25339.9
- 13. Reactor Reserve Shutdenn kours --0-- - . '--0-- !
- 14. Hours Generator On-Line. 0.0, 3771.3~ 24726.2
--0-- - - '
- 13. Unit Reserve S'iutdown Hours
- 16. Bross Thereal Energy Generated (NH) 0 12157069 76269669 . 3
- 17. Gross Electrh:al Energy Generated (NH) 0 4328211: 2690377 IB. Net Electrical Energy Generated (MH) -11608 4075399 25220415
- 19. Unit Service Fa: tor 0.0 >64.7 69.9
- 20. Ualt Avallability factor 0.0 64.7 69.9 t
- 21. Unit Capa:ity Factor (Using MDC Nat) 0.0 61.9 62.8
- 22. Unit Capacity factor =(Using nER Net) '0.0 61.0 ' 62.3
- 23. Unit Forced Outage Rate .
0.0 - 1.5 15.6 Date and Duration of Each):
- 24. Shutdown Scheduled Over Next Currently Ref6 Months (Tvpe'ueli,ng
- 23. If Shut Down At End Of Report Furied. Estleated Date of Startup September 216,1990
- 26. Units-In Test Status (Prior to Coesercial Operation): Forecast Achieved.
INITIALCRiflCALITY, INITIALELECTRICITY i<
COMMERCIAL DPERATICN
m:-- n 1.o
' ? ,0 , l v-.* 4
-m - ,
n ,
' ti r^ lj7 g'7t { -
.e , '
- ,3.+' 9 ;' .a, ,.
,t..
_3rt
- at:
O*f,;.
jit , ];jgf ac g;;gg;-y 7- -;; -
c l:w.n o a ,
s
+S; , hlf s l,' '
% ' Yh
- OPERAllN6 DATA REPORT-
$, . 41J Yy '
, . 4 ,
y
' ,'g m ~>
1
, g, , " '
J
<rin , j h '
7, d ,i %< f s
- i.../
s
, , . .. A -DOCKETN0'- 50-414 p4 4 ? UNIlg Catanha 2 '
DATE Sectember 14. 1990 =
y . COMPLETED BYm R. A,' Williams :
i " TELEPHONE ~ 704-373-5987 e a: 4 4
. r:
l
, o lA.-:.-p
'. MONTH ~ Aunust. 1990
,:i;: ,;,
,c ,, '3.
'!-,.--1.--
- .y y
-I# ,
E AVERA6E DAILY POWER LEVEL- 1M AVERA6EDAILYP0bEfLEVEL /- ,
JMWe-Wet,1- '. UWe Net)'
?
'- - < ^ \ ',
.i? <.L- ' -1
, i ' !
2' 0 10:
0'
- 3 -- 0 19-
.(
0'- <
. g
, a 4 'O : 20 -0~ '
~l I
u 00 ,y.1 1 5 0 l 21 -0 ' '
p
=6s O' '
. 22k _ "O t i, 1
-..? ; O i!
23 4 0-
. y-
- 81 0 . }'
P4 -0' '
- 9. 0: 25 0=
.; j ',- ,a - x ,;
- j 10 0 '26 0' \
.-i
,i
, +
11., 0 3
\
27 0 '
, - 42 0 28 -
, 0 m .
- 13 0 ~ 29 ' 0 '
]s ll 14' 0 .,
- 30. 0 y
d';
E15- 0 31 0 l w
i;: -16 0 1,
- lc. -
J
} g .-
N 9
2
- }' rj
. . . .y f
i...t,, , .] } ~
- i 1 '
$ __c- 1- k_ :
qua w-wg am ; i '
1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 .
UNIT NAME CATAW13A 2 DATE uv/14/vu PAGE 1 OF 2 REPORT MONTH August 1990 COMPLETED BY s. W. rivst M .
TELEPHONE (/u4J-J/J->/ez (1) 2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO o DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 2 90 1 S 384.00 C 1 RC FUELXX END-OF-CYCLE "3" REFUELING OUTAGE 3 90- 8-16 S 96.00 B 1 WA PUMPXX 4 DAY SCHEDULED OUTAGE EXTENSION DUE TO NUCLEAR SERVICE WATER PUMP "2A" BEING PLACED ON UNIT 1 4 90- 8-20 S 24.00 B 1 RB XXXXXX 1 DAY SCHEDULED OUTAGE EXTENSION DUE TO INSPECTION OF REMOTE UPPER INTERNALS GUIDE CARD PROBLEMS 5 90- 8-21 S 48.00 B 1 SF PUMPXX 2 CAY SCHEDULED OUTAGE EXTENSION DUE TO SAFETY INJECTION PUMP TESTING 6 90- 8-23 S 48.00 B 1 EE ENGINE 2 DAY SCHEDULED OUTAGE EXTENSION FOR DIESEL GENERATOR FUEL TANK CLEANING 7 90- 8-25 S 48.00 B 1 EE ENGINE 2 DAY SCHEDULED OUTAGE EXTENSION DUE TO "2A" DIESEL GENERATOR FUEL PROBLEMS (1) (2) (3) (4)
F Forced Reason- Method:
1-Manual Exhibit G -- Instructions for Preparation of Data S Scheduled l A-Eqt,ipment FailureB-Maintenance or test (Explain) Ent o Sheets For Licensee 2-Manual Scram Event Re C-Refueling 3-Automatic Scram rt (LER D-Regulato W Restriction , ,
4-Other (Explain) File ( G-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)
- - -==. -
4 2
8 .
UNIT SHUTDOWNS-AND POWER REDUCTIONS' ' DOCKET NO. 50-414 .
UNIT NAME CATAWISA 2 DATE vy/14/yv l PAGE 2 OF 2 REPORT. MONTH August 1990 - COMPLETED BY s. w. rivst,x -
TELEPHONE t/usj-J/J-3/b4 (1)
{2) g_ (4) (5 ) .-
E HOD T A OF LICENSE .
N Y S SHUT lSYS- CAUSE'AND CORRECTIVE' O P DURATION O DOWN EVENT . ' TEM REPORT COMPONENT -
-ACTION TO o DATE E HOURS N' R/X NO. CODE CODE ~ PREVENT RECURRENCE 8 90- 8-27 S 96.00 B 1 WA ZZZZZZ~- -4 DAY' SCHEDULED DELAY DUE'TO NUCLEAR SERVICE WATER TRAIN 'B '
ISOLATION, PROBLEMS I
i (2 - .(3 .(4
-(1hForced
- eason-r ethod: xhibit'G -' Instructions- -
'S Scheduled A-Equipment Failure-(Explain)- 1-Manual 'for Preparation of Data B-Maintenance or-test 2-Manual Scram- Entry Sneets For Licensee i-C-Refueling 3-Automatic Scram 'Eyent R rt D-Regulatory. Restriction 4-Other.- (Explain) File ( G0{LER) 61)
- E-Operator' Training E'Licensa . Examination- . ,
F-Aoministrative -(5)
! ,G-Operator Errgr (Explain)- Exhibit I - Same SourceL H-Other (Explain) >
t i
s t
k
. ' , , . , + , . . , , , , _ _ _ _ . _ _ . , _
. _. - ..~.,...y -. -- ..-.c % . . - , . r . g& . ,r -- s.,-; .~~w -
_ m_. _ ._ . . _ , _ _ _ _ _ , . _ . __-er-
'S 4 r d
L
>l DOCKET NO:_. 50-414 ,;
^ UdIT :' Catawba 2' -j DATE: 09/14/90. _,
- v. 1 NARRATIVE
SUMMARY
l
. MONTH :-- August 1990 Catawba Unit 2 began the-month of August shut down for'its End Of-Cycle "3" refueling outage. TheLunitl remained'in the' outage for the entire -
3 i
month. I d.q I
i
-j i
Prepared by: S. W. Moser Telephone: 704-373-5762 4
.' i s . .
T j
< MONTHLY REFUELING INFORMATION REQUEST
.i i
L1., Fa'cility.name:-Catawba. Unit'2:
2- .
Scheduled next refueling shutdown: Currently Refueling :
3.., Scheduled. restart following refueling:. September 1990 1
- 4. :Will refueling or: resumption of operation thereafter requireLa.. technical specification change lor other license amendment? No .,
Ifyes,whatwillfthesebe? ,
If.no, has reload design and core configuration been reviewed'by Safety Review Committee regarding unreviewed-safety questions?l N/A
'5. Scheduled date(s) for submitting proposed licensing action and_ supporting ,
information: N/A
- 6. I'mportant licensing considerations-(new or different .. sign' or supplier,:
unreviewed design or performance analysis methods, significant changes in 1 design ~or new operating procedures). i, u?. Number of fuel-assemblies (a) in the core: -193 (b)- in the spent fuel pool: 204:
- 8. Present licensed fuel pool capacity: . 1418-Size of requested or planned increase: - --- i
- 9. Projected date of last refueling which can be accon,modated by present licensed capacity: September 2011
' DUKE POWER COMPANY DATE: September- 14, 1990 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 .
e- r w -,o p , , _ . ,,.
k i
I e
CATAWBA NUCLEAR STATION
.. J
' MONTHLY OPERATING STATUS REPORT-4 July 1990
'1. Personnel' Exposure - i For the month of July,--no indiYidual(s)' exceeded 10-. =i parcent of their allowable annual;radiationsdose limit.
The total station liquid-release lfor-Jdly has'been compared 2.
with the Technical Specifications maximum annual' dose !
commitment and, was less than 10' percent - of this limit. : "
The total station gaseous release'for July'hasJbeen.-
compared'with the Technical' Specifications maximum annual dose' commitment-and was less than 10 percent of this' list. ,
4 l
o e ?
l 3
.i j!
l l
1 >
l.
l t
. .. ., . _, - . . . .. - - . . . . .. . - - - - -- . ._ .- . . -