Monthly Operating Repts for Aug 1990 for Catawba Nuclear Station Units 1 & 2
ML20059J460
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1990
From: Tucker H, Robert Williams
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009200003
Download: ML20059J460 (13)


Text

-- -- _

, W [

. n- . eil

.*L ._ I) uke l%urr Company , (704,373,qng;

~*'

.. l'0 liox 11189 Charlotte, hc 28242 DUKEPOWER SepteEN184,1990

- - 'l

-U.:S. Nuclear Regulatory Commission

' Attention:- Document' Control Desk.

-- Washington,.D; C. -20555 Re:, Catawba Nuclear Station . .

Docket No.: 50-413 and--50-41M

Dear Sir:

Please! find attached information concerning the performance and operating status of the Catawba Nuclear Station for~the month of' August 1990.

~

Very truly yours, Hal B. Tucker i j

JAR /15/ jar ,

Attachment xc: Mr. Stewart D. Ebneter INP0 Records Center:

Regional Administrator, Region II Suite 500 .

l S.- Nuclear Regulatory Commission 1100' Circle l75 Parkway

~

U'.

  • 101 Marietta Street, NW, Suite 2900 . Atlanta, Georgia '30323 l Atlanta,. Georgia' 30323  ;

Mr. Richard-G. Oehl, NE-44 American- Nuclear Insurers U. S. Department of Energy c/o Dottie~Sherman, ANI Library

'19901 Germantown Road The. Exchange, Suite-245  ;

Germantown, Maryland 20874 270 Farmington. Avenue '

Farmington, CT 06032_ i Mr. W. T. Orders Ms. Vickie White- .

NRC Resident Inspector Nuclear Assurance Corporation; Catawba Nuclear Station 6251 Crooked Creek Road- i Norcross, Georgia 30092:

~

'9009200003 900831 j PDR ADOCK O$000413 '

iR PDC { 6 2.84 -

,g y

7 -- ,

w ,

n a

DPERAi!N6'DATAREPORT.

i

~

DOCKET ND 50-413-

! DATE Scotenber 14. 1990 OPERATIN6 STATUS COMPLETEDBY R.A. Willines JTELEPHONE- 704-373-5907  ;

3.UnitHase:Catawbat- .

2. Reporting Feriod: August 1,1990-August 31,1990.'  ;
3. Liter:sedTherealPower(Mt):. 3411,
4. Nameplatt Rating (Bross Me): - 13055 NotecltNaseplateRating- [
5. Design Electrical Rating (Net M elt' 1145 (Bross We) calculated as  ;
6. Mazinus Dependable Capacity (6tess me):: 1192 1450.000 MVA i .90 power <
7. Marisus Dependable Capacity (Net We): 1129 .

factor per Page til,

8. If Changes Occur in Capacity Raiings (Itees Nusber 3 Through 7) Since Last' NURE6-0020.-

Report,GiveReasons

9. Power Level To Walch Restricted,_lf Any (Net We):
10. Reason For Restrictions, If any:

LThisMonth;,Yr.-to-Date Cueuldive

!! Hours in Reporting Period 744.0: - 5831.0 45360.0~

12. Nueber Of Hours Reactor Was Critical 744.0 3489.0 '33157.8
13. Reactor Reserve Snutdown Hours- --0--- --0" --0-*-
14. Hours Benerator On Line 744.0 - 3429.5- 32315.5
15. Unit Reserve Shutdown Hours --0--- --0-- --0--

( 16. Gross Thersal Energy Generated ( MH) 2496182' 103855964-l11322859l l 17. Gross Electrical Energy Generated (NH) 870413~ 3963377 36416198 IB. Net Electrical Energy Generated (MH) 823466 3700066 34096444

19. Unit Servi:e Factor 100.0 58.8 71.2
20. Unit Availability Factor :100.0 - 50.0 - 71.2
21. Unit Capacity Factor _(Using MDC Net) 99.0 56.2- 66.1
22. Unit Capacity factor (Using IER Net) 96.7i . 55.4 = 65.7 23.' Unit Forced Outage Rate 0,0 " 13.7- 13.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Nnno

25. If Shut Down At End Of Report Period. Estiaated Date of Startupt-26.UnitsinTestStatus(PriortoCommercialOpration): -Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY i

COMERCIAL OPERATION

T .,a

~r

--!!( fig 9

>;c v-

, .a .

=---

,  ;; .. v -

- ..- ji 1 1

5n 3.. *

  • ~
OPERATINGDATA_REPORii

+

o x; -

DOCKET NO - 50-413 -

. Imli - Catasha !=

DATE Sentenber 14. 1990:-

3 * :COMPLETEDBY R.A. Willians=

TELEPHONE 7%-373-5997 9, .

J f

MONTH' -Auntsti1990' e

~ LAJ, AVERA6EDAILYPOWERLEVELl d AVERA6E DAILY POWE!! LEVEd 96J ?-

(MWe-ket) >

(Inle-Net) t m

.g , 4 r> ,

1 1114 1 )17; - 1109 - <

2 1117 IBf; 1106 3 1116 il9{f 1104+ ,

4 1100 20 1103 5 1109'- 1 21l , -

1107

.a 6' 1110 t 22\ '1109-

7. 1110-  ? 23 : 1109

-8 1109 24'

  • 1104-9 1100 25. 1102' , , , , .

10 1112 ' _ E26 - 1100 11 1108 l 27 - 1101 l 1

12 =1089 '28 -1104-  !

13 1100 29 11 % ,

a 14 -1108 '30 ,

1109 l

-15 -1106 31 1100

> j

.16 1106 ,

\

o

j I

s

. q 4

f , 1

g  %

.: =- -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKF"*/ NO.. 50-413 .

- UNIT NAME- uTAwtsA 1 DATE' Uy/14/ y u --

REPORT MONTH August 1990 COMPLETED BY s. w. Must;x .

TELEPHONE tevej-Jea-3/02 (1) 2) g_ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- - CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT. TEM COMPONENT ACTION TO-0 DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (2 (3 (4bxhibit G -- Instructions

'(1h' Forced -

eason- ethod:

S Scheduled 1-Manual 'for Preparation of, Data A-Equipment FailureB-Maintenance.or test (Explain)' 2-Manual . Scram Entry: Sheets For Licensee C-Refueling 3-Automatic Scram Event Ee rt (LER D-Regulatory R9striction- , .

..4-Other (Explain)- File ( '

G-0161))'

E-OgeratorTraining-ELicenseExaminatloa r r or xhibit I - Same Source H-O her (Explain) (Explain)

-+

J'4*" - " - - -

J- M 'm="" '

w me -e' - -h -e . -'--ertw -->2

-maem- .-

-._mi-e

.a . -

., t f

o .

, N

,t l' DOCKET NO: 50-413 li .

i l, '

. UNIT: Catawba 1- ,

DATE: 09/14/90; NARRATIVE

SUMMARY

MONTH: August;1990 l

Catawba Unit 1 began the monthLof August operating at-100% full power.. ,

The. unit operated at,or near 100% full power for the sntire month,=and1

~

ended the month: operating at 1006.fu11-power.

9 l

t-K l'

l' l-l

. t l l g Prepared by: S. W. Moser Telephone: 704-373-5762 l l

s s lii o .

.t

.,- .o l

t a -i- MONTHLY REFUELING INFORMATION RE0 VEST' .

L 1. Facility name:: Catawba.' Unit 1 _

2. Scheduled next refueling: shutdown: March 1991 ,

}

3. Scheduled restart-following' refueling: June'1991 j i
4. . Will' refueling or resumption of operation thereafter require'aLtechnical; j , ,

R specification change or other license amendment?' . No-If.yes, what'will these be?

If no, has reload design and core configuration been reviewed by. Safety..

Review Committee regarding unreviewed safety questions?'N/A~'

l S. Scheduled date(s) for submitting propose'd licensing' action 'and supporting.

i information: N/A l

" 6. Important licensing considerations (new or different design or' supplier..

unreviewed design or performance analysis methods, significant changes in :l L design or new operating procedures).  !

7. Number of' fuel assemblies'(a) in the core:'193 (b) in'the spent fuel pool: 264-i
8. Present licensed fuel pool capacity: 1418 .

Size of requested or planned increase: - i

9. Projected date of last refueling which can be accommodated by present ,

licensed capacity:. September 2009 1

i i

L DUKE POWER COMPANY DATE: September 14, 1990 4 I

L Name of

Contact:

J. A. Reavis phone: 704-373-7567 ,

m'

=.

DPERAilk6DAlf.REPCRI-I' DOCKET NC 50-414 -

1 DATE Sentreber 14. 1990

~'

OPERATING STATUS- COMPLETEDBY R.A. Pillians TELEPkONE 704-373-5987 q

1. Unit hase: Catawba 2 _

2.ReportingPeriod: August 1,1990-August 31,1990,

3. Licensed Thereal Power ( W t): '~ 3411 ,; 7
4. Naseplate Rating (Gross Melt *
10054 ' Notes eNaseplate Rating-
5. Design Electrical Rating (Net Weh 1145 (Bross MWel calculated as .
6. Marisue Dependable Capacity (Bross We) - -!!92 1450.000 MVA x'.90 power.

-7. Natious Dependable Capacity (Net MWeh = 1129 ..

factor per Page lit, ,

. B.' If Changes Occur in Capacity Ratings (Itess Nueber 3 Through 7) Since Last - NURE6-0020.

Report.GiveReasons  ;

9. Power f.evel To Which Restricted,,if Any (Net Welt-10.ReasonForRestrictions,ifanyt s

This Month-- Yr.-to Date- Cuau'tative -

!!. Hours in Reporting Feriod.

744.0' 5831.0 - 35376.0'

12. Ntaber Of Hours Reactor Was Critical 0.0 3789.4. 25339.9
13. Reactor Reserve Shutdenn kours --0-- - . '--0--  !
14. Hours Generator On-Line. 0.0, 3771.3~ 24726.2

--0-- - - '

13. Unit Reserve S'iutdown Hours
16. Bross Thereal Energy Generated (NH) 0 12157069 76269669 . 3
17. Gross Electrh:al Energy Generated (NH) 0 4328211: 2690377 IB. Net Electrical Energy Generated (MH) -11608 4075399 25220415
19. Unit Service Fa: tor 0.0 >64.7 69.9
20. Ualt Avallability factor 0.0 64.7 69.9 t
21. Unit Capa:ity Factor (Using MDC Nat) 0.0 61.9 62.8
22. Unit Capacity factor =(Using nER Net) '0.0 61.0 ' 62.3
23. Unit Forced Outage Rate .

0.0 - 1.5 15.6 Date and Duration of Each):

24. Shutdown Scheduled Over Next Currently Ref6 Months (Tvpe'ueli,ng
23. If Shut Down At End Of Report Furied. Estleated Date of Startup September 216,1990
26. Units-In Test Status (Prior to Coesercial Operation): Forecast Achieved.

INITIALCRiflCALITY, INITIALELECTRICITY i<

COMMERCIAL DPERATICN

m:-- n 1.o

' ? ,0 , l v-.* 4

-m - ,

n ,

' ti r^ lj7 g'7t { -

.e , '

,3.+' 9 ;' .a, ,.

,t..

_3rt

- at:

O*f,;.

jit , ];jgf ac g;;gg;-y 7- -;; -

c l:w.n o a ,

s

+S; , hlf s l,' '

% ' Yh

- OPERAllN6 DATA REPORT-

$, . 41J Yy '

, . 4 ,

y

' ,'g m ~>

1

, g, , " '

J

<rin , j h '

7, d ,i %< f s

- i.../

s

, , . .. A -DOCKETN0'- 50-414 p4 4  ? UNIlg Catanha 2 '

DATE Sectember 14. 1990 =

y . COMPLETED BYm R. A,' Williams :

i " TELEPHONE ~ 704-373-5987 e a: 4 4

. r:

l

, o lA.-:.-p

'. MONTH ~ Aunust. 1990

,:i;: ,;,

,c ,, '3.

'!-,.--1.--

  • .y y

-I# ,

E AVERA6E DAILY POWER LEVEL- 1M AVERA6EDAILYP0bEfLEVEL /- ,

JMWe-Wet,1- '. UWe Net)'

?

'- - < ^ \ ',

.i? <.L- ' -1

, i '  !

2' 0 10:

0'

3 -- 0 19-

.(

0'- <

. g

, a 4 'O  : 20 -0~ '

~l I

u 00 ,y.1 1 5 0 l 21 -0 ' '

p

=6s O' '

. 22k _ "O t i, 1

-..? ; O i!

23 4 0-

. y-

81 0 . }'

P4 -0' '

9. 0: 25 0=

.; j ',- ,a - x ,;

j 10 0 '26 0' \

.-i

,i

, +

11., 0 3

\

27 0 '

, - 42 0 28 -

, 0 m .

13 0 ~ 29 ' 0 '

]s ll 14' 0 .,

30. 0 y

d';

E15- 0 31 0 l w

i;: -16 0 1,

- lc. -

J

} g .-

N 9

2

}' rj

. . . .y f

i...t,, , .] } ~

i 1 '

$ __c- 1- k_ :

qua w-wg am  ; i '

1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 .

UNIT NAME CATAW13A 2 DATE uv/14/vu PAGE 1 OF 2 REPORT MONTH August 1990 COMPLETED BY s. W. rivst M .

TELEPHONE (/u4J-J/J->/ez (1) 2) g_ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO o DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 2 90 1 S 384.00 C 1 RC FUELXX END-OF-CYCLE "3" REFUELING OUTAGE 3 90- 8-16 S 96.00 B 1 WA PUMPXX 4 DAY SCHEDULED OUTAGE EXTENSION DUE TO NUCLEAR SERVICE WATER PUMP "2A" BEING PLACED ON UNIT 1 4 90- 8-20 S 24.00 B 1 RB XXXXXX 1 DAY SCHEDULED OUTAGE EXTENSION DUE TO INSPECTION OF REMOTE UPPER INTERNALS GUIDE CARD PROBLEMS 5 90- 8-21 S 48.00 B 1 SF PUMPXX 2 CAY SCHEDULED OUTAGE EXTENSION DUE TO SAFETY INJECTION PUMP TESTING 6 90- 8-23 S 48.00 B 1 EE ENGINE 2 DAY SCHEDULED OUTAGE EXTENSION FOR DIESEL GENERATOR FUEL TANK CLEANING 7 90- 8-25 S 48.00 B 1 EE ENGINE 2 DAY SCHEDULED OUTAGE EXTENSION DUE TO "2A" DIESEL GENERATOR FUEL PROBLEMS (1) (2) (3) (4)

F Forced Reason- Method:

1-Manual Exhibit G -- Instructions for Preparation of Data S Scheduled l A-Eqt,ipment FailureB-Maintenance or test (Explain) Ent o Sheets For Licensee 2-Manual Scram Event Re C-Refueling 3-Automatic Scram rt (LER D-Regulato W Restriction , ,

4-Other (Explain) File ( G-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

- - -==. -

4 2

8 .

UNIT SHUTDOWNS-AND POWER REDUCTIONS' ' DOCKET NO. 50-414 .

UNIT NAME CATAWISA 2 DATE vy/14/yv l PAGE 2 OF 2 REPORT. MONTH August 1990 - COMPLETED BY s. w. rivst,x -

TELEPHONE t/usj-J/J-3/b4 (1)

{2) g_ (4) (5 ) .-

E HOD T A OF LICENSE .

N Y S SHUT lSYS- CAUSE'AND CORRECTIVE' O P DURATION O DOWN EVENT . ' TEM REPORT COMPONENT -

-ACTION TO o DATE E HOURS N' R/X NO. CODE CODE ~ PREVENT RECURRENCE 8 90- 8-27 S 96.00 B 1 WA ZZZZZZ~- -4 DAY' SCHEDULED DELAY DUE'TO NUCLEAR SERVICE WATER TRAIN 'B '

ISOLATION, PROBLEMS I

i (2 - .(3 .(4

-(1hForced

eason-r ethod: xhibit'G -' Instructions- -

'S Scheduled A-Equipment Failure-(Explain)- 1-Manual 'for Preparation of Data B-Maintenance or-test 2-Manual Scram- Entry Sneets For Licensee i-C-Refueling 3-Automatic Scram 'Eyent R rt D-Regulatory. Restriction 4-Other.- (Explain) File ( G0{LER) 61)

E-Operator' Training E'Licensa . Examination- . ,

F-Aoministrative -(5)

! ,G-Operator Errgr (Explain)- Exhibit I - Same SourceL H-Other (Explain) >

t i

s t

k

. ' , , . , + , . . , , , , _ _ _ _ . _ _ . , _

. _. - ..~.,...y -. -- ..-.c % . . - , . r . g& . ,r -- s.,-; .~~w -

_ m_. _ ._ . . _ , _ _ _ _ _ , . _ . __-er-

'S 4 r d

L

>l DOCKET NO:_. 50-414 ,;

^ UdIT :' Catawba 2' -j DATE: 09/14/90. _,

v. 1 NARRATIVE

SUMMARY

l

. MONTH :-- August 1990 Catawba Unit 2 began the-month of August shut down for'its End Of-Cycle "3" refueling outage. TheLunitl remained'in the' outage for the entire -

3 i

month. I d.q I

i

-j i

Prepared by: S. W. Moser Telephone: 704-373-5762 4

.' i s . .

T j

< MONTHLY REFUELING INFORMATION REQUEST

.i i

L1., Fa'cility.name:-Catawba. Unit'2:

2- .

Scheduled next refueling shutdown: Currently Refueling  :

3.., Scheduled. restart following refueling:. September 1990 1

4. :Will refueling or: resumption of operation thereafter requireLa.. technical specification change lor other license amendment? No .,

Ifyes,whatwillfthesebe? ,

If.no, has reload design and core configuration been reviewed'by Safety Review Committee regarding unreviewed-safety questions?l N/A

'5. Scheduled date(s) for submitting proposed licensing action and_ supporting ,

information: N/A

6. I'mportant licensing considerations-(new or different .. sign' or supplier,:

unreviewed design or performance analysis methods, significant changes in 1 design ~or new operating procedures). i, u?. Number of fuel-assemblies (a) in the core: -193 (b)- in the spent fuel pool: 204:

8. Present licensed fuel pool capacity: . 1418-Size of requested or planned increase: - --- i
9. Projected date of last refueling which can be accon,modated by present licensed capacity: September 2011

' DUKE POWER COMPANY DATE: September- 14, 1990 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 .

e- r w -,o p , , _ . ,,.

k i

I e

CATAWBA NUCLEAR STATION

.. J

' MONTHLY OPERATING STATUS REPORT-4 July 1990

'1. Personnel' Exposure - i For the month of July,--no indiYidual(s)' exceeded 10-. =i parcent of their allowable annual;radiationsdose limit.

The total station liquid-release lfor-Jdly has'been compared 2.

with the Technical Specifications maximum annual' dose  !

commitment and, was less than 10' percent - of this limit. : "

The total station gaseous release'for July'hasJbeen.-

compared'with the Technical' Specifications maximum annual dose' commitment-and was less than 10 percent of this' list. ,

4 l

o e  ?

l 3

.i j!

l l

1 >

l.

l t

. .. ., . _, - . . . .. - - . . . . .. . - - - - -- . ._ .- . . -