ML20034B015

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/90-10 & 50-414/90-10 on 900322-26.Violations Noted.Insp Found Several Problems Including Lack of Mgt Control Over Plant Status & Failure to Rept Event as Required
ML20034B015
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/16/1990
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20034B016 List:
References
NUDOCS 9004250217
Download: ML20034B015 (4)


See also: IR 05000413/1990010

Text

_

,-

-ti

.,7

,

3,

'

.

April 16, 1990-

~l

!

Docket Nos. 50-413, 50-414

License.Nos; NPF-35, NpF-52

Duke Power Company.

.

.

ATTNi Mr. H.-B. Tucker, Vice Preside'nt

Nuclear. Production Department

422 South: Church Street

Charlotte, NC -28242

'

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-413/90-10 AND 50-414/90-10

This refers to the special, onsite . inspection conducted'by'the Nuclear Regulatory:

Commission (NRC) during the period March 22 - 26, 1990. -The. inspection included-.

a review:of actions concerning the March 20, 1990,: overpressure event at:your

Catawba facility.

At the conclusion .of_ the : inspection, - the findings were -

discussed with those members of your staff identified in the' enclosed

i

inspection report.

j

QQQ

The inspection concluded that the licensee's immediate actions'during th,e1 event

dy

were appropriate, the licensee's investigation ?of the event was thorough 'and-

i

,

jg.i

technically adequate, no significant damage toLRHR .(ND) system components was

My

caused by the overpressurization, and the event did not violate the-low temper-

-

'

ature crittle fracture limit for the Reactor. Coolant System (RCS)-(NC). .-However,

L

the inspection-found several problems including lack of management control'over

1

plant status, failure to report the event as requireo, failure to conduct

Technical Specification (TS)' required surveillances on the Power Operated

Relief Valves (PORVs), and an inadequate design change'on the RHR (ND) suction.

isolation valve logic.

I

Areas examined during the inspection are identified in the report. Within these

' I

'

areas, the inspection consisted of selective examinations of procedures and

!

representative records, interviews with personnel, and observation of activities

in progress.

.

The inspection findings indicate that certain activities appear to violate NRC

l

requirements.

The apparent violations described in the enclosed inspection

~

report are under consideration for escalated enforcement action.

Accordingly,

no Notice of Violation is being issued at this time, and no response to this

letter is required for these apparent violations. However, please be advised-

that the number and characterization of the apparent violations described in

the enclosed inspection report may change as a result of further NRC review.

An Enforcement Conference to discuss these apparent violatians is scheduled for

April 25, 1990. You will be advised by separate' correspondence of the results

of our deliberations on this matter,

,

i

O

p

l'

-

O

= .21= 0 / ,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . . .

y

..

-,

t

,

b

'

.

April 16, 1990

.

Docket Nos. 50-413. 50-414

License Nos. NPF-35, NPF-52

Duke Power Company

w

ATTN: Mr. H. B. Tucker, Vice President

.

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: :NRC INSPECTION REPORT NOS. 50-413/90-10 AND 50-414/90-10

This refers to the special, onsite inspection conducted by the Nuclear Regulatory-

~

Commission (NRC) during the period. March 22'- 26, 1990.

The inspection included

a review of actions concerning the March 20, 1990,- overpressure eventLat your

Catawba - facility. .At the conclusion; of; the i n spection', the findings were

i

discussed with those members of your staff identified in the. enclosed

inspection report.

!

The inspection concluded that the licensee's immediate actions during the event

were appropriate, the licensee's investigation -of the event was -thorough and -

technically adequate, no significant damage - to RHR (ND) system components was:

caused by the overpressurization, and the event'did not violatetthe low temper-

1

ature brittle fracture limit.for the Reactor Coolant System (RCS) (NC).

However,

-the inspection found several problems including lack of management control over-

plant status, failure to report the event. as required, failure -to conduct

Technical Specification (TS) required . surveillances on .the Power Operated

i

Relief Valves (PORVs), and an inadequate design cha.nge.on the RHR (ND) suction

I

isolation valve logic.

i

Areas examined during the inspection are identiiied in the report. 'Within these

areas, the inspection consisted of selective examinations of procedures and

,

representative records, interviews with personnel, and observation of activities

J

&n progress.

The inspection findings indicate that certain activities appear to violate NRC

~l

requirements.

The apparent violations described in the enclosed inspection

report are under consideration for ercalated enforcement action. Accordingly,

j

no Notice of Violation is being issued at this time, and no response to this

j

letter is required for these apparent violations.

However, please be advised.

'

that the number and characterization of the apparent violations described in

,

the enclosed inspection report may change as a result of further NRC review.

!

An Enforcement Conference to discuss these apparent violations is scheduled for

,

April 25, 1990. You will be advised by separate correspondence of the results

a

of our deliberations on this matter.

'

i

900425 g $ $ [413

PDR

A

PDC

l

g

O

4

J)

120/

-

,

,

b

3,

a ,,

x

~

<

.+;

,

.

,

5I

~,L

~ % .-

Duke PowerLCompany'

'2

April;16', 1990

L

Inaccordance with Section 2- 790 of? the NRC's!" Rules of Practice," Part

2,,

.

Title 10,-Code of Federal-Regulations, a copy of this= letter;and its enclosures'

-

will be placed in the NRC Public-Document-Room.

Should you have any' questions concerning this _ letter, please contact us.

Sincerely,

(ORIGINAL SIGNED BY A.! F. _ GIBSON. ) _.

~

Albert F; Gibson, Director-

.

Division:of Reactor Safety.

Enclosure:.

NRC: Inspection Report.

<

cc w/ encl:

T.-B.-Owen,-Station-Manager

Catawba Nuclear' Station

P. O. Box 256

Clover, SC 29710

A. V. Carr, Esq.

Duke Power Company

422 South Church Street

Charlotte,1NC 28242

J. Michael _McGarry, III, Esq.

' Bishop, Cook, Purcell and Reynolds

1400 L Street, NW

Washington, D. C.

20005

North Carolina MPA-1

3100 Smoketree Ct., Suite 600

P. O. Box 29513

Raleigh, NC 27626-0513

Heyward G. Shealy, Chief

. Bureau of Radiological Health

South Carolina Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Richard P. Wilson, Esq.

Assistant Attorney General

S. C. Attorney General'.s_ Office

P. O. Box 11549

,

Columbia, SC 29211

"

(cc w/enci cont'd - See page 3)

-

!

L:

. A{-: (l'

l

'

'

n iq;p., . l

-

~

'

c

n

,

,

v

n

c(

r,E

-

[i'

'

q.g

%

4 -

.L ^3 j-

April:16,11990 ?

h

.'Ouk/ Power' Company'

_

,

(cc w/e'nc1Lcont'd)

4 LMichaelEHirschl

Federal' Emergency; Management Agency-

'

x

,

,

1500-C-Str'eet,iSWi; Room.840i

Washington,'D.EC: L20472-.

'

'

-

.

.

. North Carolina'Electrici

-

' Membership. Corporation = A

'

'

3400'Sumner' Boulevard

P . ' 0. > Bo'x 27306~.

.Raleigh, NC-':27611:

'

y

.

-Karen'E. Long::

.

Assistant Attorney _ General.

'N. C.EDepartment of Justice

P. O.1Boxi629:

Ra'leigh, NC- 27602'

-

,,

Saluda River: Electric.

Cooperative,lInc.

.

-

P. O. Box 929

Laurens, SC 29360-

S. S. Kilborn, Area.' Manager

'Mid-South-Area ESSD-Projects:

Westinghouse.-Electric Corporation

MNC West Tower - Bay 239-

P. O, Box 335

'i

'

Pittsburg, PA 15230'

County Manager'of' York' County

York County Cour.thouse

-

,

York, SC 29745

H

,

Piedmont Municipal Power Agency

'121 Village Drive

-Greer, SC 29651

..

State of~ South Carolina-

bec w/encis:

K. N. Jabbour, NRR

'B.

R. Bonser, RII

m

M. B. S ymlock, RII

h

L

(bec w/encls cont'd - See page 4)

,

,

it

,

.,.

,

'

u

L

i

!

'!

<

!

.

..

.

-- .

.

.g

' '

'

..

..

,.

-

. Duke' Power Company

4-

April 16, 1990.

'*

,

(bec w/encls cont'd)'

E. Merschoff, DRS

' T.- Murley, NRR/DONRR -

cument Control Desk

NRC Resident Inspector

U.S.~ Nuclear Regulatory Comission

Route 2. Box'179-N

! York,'SC 29745

~

,

I

i

!

l

l

,

i

l

I

.i

L.

'

i

.i

-

t.t-

'I

'

.

l

l

i

RII:

RII:DRS

RII:

S

RII:

.-

-:RII: RP

R I: RS

_

9ktY

Ih9

X

i

s

g,04//l/90

RGi

/[jPKellogg04//p90-

04/;~; /90

04

/90

T ebles

EMers hoff

rdt

. AF

l s on-

ci

04/06/90

04/$.90-

/

'

,

,,

8

c a s ~ ( ),. yl 4

" , ^ ~ ,

3

e

YSfl

%?Tedi)

i