ML20056G757

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Rept of Plant for Period of 910929- 930313
ML20056G757
Person / Time
Site: Pilgrim
Issue date: 08/30/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20056G758 List:
References
NUDOCS 9309070130
Download: ML20056G757 (4)


Text

r ,

~

q s

  • AUS 3 0133 Docket No. 50-293 E. Thomas Boulette, PhD Senior Vice President-Nuclear

' Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Dr. Boulette:

SUBJECT:

FINAL SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) REPORT NO. 50-293/91-99 This letter forwards the final report of Pilgrim Nuclear Power Station's SALP for the period September 29,1991 thmugh March 13, 1993. The initial report was forwarded by our May 21,1993 letter and discussed with you and your staff at a meeting held in Plymouth, Massachusetts on June 10, 1993.

Based upon the discussions at that meeting and your written response dated June 25,1993, no changes in the assessment were made.- However, based on public comments, the SALP Board was mconvened on August 10,1993 to discuss the Emergency Preparedness evaluation (Section III.D). After consideration of these comments and an independent review of past emergency preparedness exercise performance, the Board concluded that no change to the rating in this area was warranted. One minor change was made to the Emergency l Preparedness section for clanfication purposes.

1 We are pleased by your commitments toward improvement through self-assessment practices l and your desire to improve the performance of the nuclear organization. We are also encouraged by your recognition of needed modifications to the electrical switchyard to better cope with weather-related challenges.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in the NRC Public Document Room. No reply to this letter is required. Your cooperation is appreciated.

Sincerely, Original Signed by:

Thomas T. Martin Thomas T. Martin Regional Administrator

! 9309070130 930830 A l I

PDR ADOCK 05000293 l

  • OFFICIAL RECORD COPY ,

4 I _

l

! AUG 3 01993 ,

E. Thomas Boulette, PhD 2 f

Enclosures:

1. ' Final SALP Report No. 50-293/91-99 L 2. USNRC_ Region I Ixtter, T. T. Martin to E. T. Boulette dated May 21,1993 i L

' 3. BECo 12tter, E. T. Boulette to T. T. Martin dated June 25,1993

4. SALP Management Meeting Slides <
5. . SALP Board Report Revision Sheet  !

.6. July 27,1993 Memorandum (F. Congel to C.W. Hehl), Independent Assessment of Pilgrim Emergency Preparedness ~ ,

r i

h l

l l

[

f l

i i

k I

?

l i

f j; '

L OFFICIAL RECORD COPY

\

t - . .

i E. Thomas Boulette, PhD 3 AUG 3 0 m cc w/encls:

E. Kraft, Vice President, Nuclear Operations and Station Director L. Schmeling, Plant Manager V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department D. Tarantino, Nuclear Information Manager N. Desmond, Compliance Division Manager R. Hallisey, Department of Public Health, Commonwealth of Massachusetts R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts The Honorable Edward M. Kennedy The Honorable John F. Kerry The Honorable Edward J. Markey The Honorable Terese Murray The Honorable Peter V. Forman B. Abbanat, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director Paul W. Gromer, Massachusetts Secretary of Energy Resources Sarah Woodhouse, Legislative Assistant A. Nogee, MASSPIRG Regional Administrator, FEMA Office of the Commissioner, Massachusetts Department of Environmental Quality ;

Engineering Office of the Attorney General, Commonwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy The Chairman Commissioner Rogers Commissioner Remick Commissioner de Planque Institute for Nuclear Power Operations (INPO) l Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (32 copies)

NRC Resident Inspector l Commonwealth of Massachusetts, SLO Designee OFFICIAL RECORD COPY

. Mr. E. Thomas Boulette, PhD 3 ALE 3 0 m i

bec w/encls:

Region I Docket Room (with concurrences and IFS Forms)  !

i I

bec w/enci (Via E-Mail): '

J. Taylor, EDO D. Wheeler, OEDO .

J. Lieberman, OE l L. Bajwa, NRR j W. Butler, NRR ,

R. Eaton, NRR  !

Region I Staff (Refer to SALP Drive) f l

t

/

[ $^

y/meo g Linville Coo r g'D Maytin/FJ i

g ff3c) 7/f/93 I/93 g t$'

i OFFICIAL RECORD COPY

~

i A:SALP9199.MEO '

f. . ..

AUG 3 01993 ,

E. Thomas Boulette, PhD 4 i bec w/encis:  !

Region I Docket Room (vdth concurrences and IFS Forms) {

bec w/enci (Via E-Mail):

J. Taylor, EDO  ;

D. Wheeler, OEDO  !

J. Lieberman, OE -

' L. Bajwa, NRR W. Butler, NRR -

'R. Eaton, NRR .

Region I Staff (Refer to SALP Drive) ,

i f

t l

t i

f i

RI:DRP* RI:DRP* RI:DRP* RI:DRA RI: ,

l Kelly /meo Linville - Cooper # ane X

7/6/93 Martin [ff 7 3D OFFICIAL RECORD COPY A:SALP9199.MEO

. ' *SEE PREVIOUS CONCURRENCE i

.-