Forwards IE Insp Repts 50-324/81-16 & 50-325/81-16 on 810727-29.Enforcement Action from Insp Addressed in NRC to Util
ML20054K945
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/02/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20049H201 List:
References
NUDOCS 8207060323
Download: ML20054K945 (2)


See also: IR 05000324/1981016

Text

~

~ .

.

7el/w

J

OCT 0 21981

Carolina Power and Light Company

ATIN: Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject: Report Nos @25/81-16)d 50-324/81-16

This refers to the special safety inspection conducted by Mr. G. L. Troup of this

office on July 27-29, 1981, of activities authorized by NRC License Nos. DPR-62

and DPR-71 for the Brunswick facility. Our preliminary findings were discussed

with Mr. C. R. Dietz, Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

The enforcement action related to this inspection was addressed to the Carolina

Power and Light Company in a letter from the Director of the Office of Inspection

and Enforcement dated October 1,1981.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this

of fice by telephone within ten days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure. This sec+1on further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

8207060323 011231

PDR ADOCK 05000324

G PDR g

-

m 3 .

OCT 0 2198f

Carolina Power and Light Company 2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

b/S

James P. O'Reilly

Director

Enclosure:

Inspection Report Nos. 50-325/81-16

and 50-324/81-16

cc w/ encl:

C. R. Dietz, Plant Manager

bcc w/ enc 1:

NRC Resident Inspector

Document Management Branch

State of North Carolina

1

l RII RII RII RII RII RI

,

r\ [*t. L6 'x

4

GL rt p:aw ' os V AFGibs n CEConer n a er RM tin

10/ 1/81 10/1 81 10/ / /81 10/l /81 10/1/81 1/ g

!