ML20039C072

From kanterella
Jump to navigation Jump to search
Amend 68 to Application for Ols,Consisting of Revision 42 to FSAR
ML20039C072
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/21/1981
From: Parker W
DUKE POWER CO.
To:
Shared Package
ML20039C073 List:
References
NUDOCS 8112280375
Download: ML20039C072 (1)


Text

,

i . 4 n J DUKE POWER COMPm '

Powra Urttnixo -

4c2 SorTu Curucu Srnrer, Ciuntorre, N. C. 2s242 ,

www o emanen.a m ** c s e r * ' December 21. 1981 't tw r ^at* 7:4

= - .. . m _ c,4

. 334m

'Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation -

U. S. Nuclear Regulatory Commission G Washington, D. C. 20555 D

,p Attention: Ms. E. G. Adensam, Chief NECDV2O 9 Licensing Branch No. 4 > ~

0EC241ggg 3g

Reference:

McGuire Nuclear Station Units I and 2 { yg;Trym g';~ a Docket Nos. 50-369, 50-370 //

~ v{> #

Dear Mr. Denton:

-Duke Power Company is filing herewith Amendment No. 68 to its Application for Licenses for the McGuire Nuclear Station which is under construction pursuant to Construction Permit CPPR-84. This filing includes three signed original copies of the amendment with attachments entitled, " Revision 42 to the Final Safety Analysis Report" and Revision 5 to Report No.~MDS/PDG-77-1, " Evaluation of the Effects of Postulated Pipe Failures Outside Containment for McGuire Nuclear Station". This filing also includes-15 additional conformed copies of the amendment with an additional.45 copies of Revision 42 to the Final Safety Analysis Report and 22 copies of Revision 5 to Report No'. MDS/PDG-7.7-1.

Revision 5 to Report No. MDS/PDG-77-1 provides the final documentation of tihe pipe break anal fsis performed on Unit 1. Revision 42 updates various sections: -

'of the Final Safety Analysis Report to support licensing of-Unit 2. Major items in this revision include:

(1) Chapter 4 changes to account for use of B C4 hybrid control rods *

~

on Unit 2 (2) Chapter 15. changes to account for differences in the various

~

safety analyses due to B 4 C hybrid control rods in Unit 2

-(3) Updated station personnel resumes in Chapter 13 (4) Miscellaneous changes and clarifications Copies of this amendment 68 have been distributed in accordance.with the requirements of Part 2.101 of the Cotanission's regulations and the instructions contained in Mr. Roger S. Boyd's letter of August 6, 1976.

spectfully submit

\ j.

~

, u.' d. .

William O. Parker, Jr.

GAC/jfw' h~

. Attachments hk o .,

l Mr. Harold R. Denton, Director December 21, 1981 Page 2 ,

WILLIMI 0. PARKER, JR. , being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this Amendment'68 to its application and documents appended thereto; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

~

/ -)

O%_- d) i 64 - "

William O. Parker, Jr. , ('ip) President Subscribed and sworn to before me this 21st day of December, 1981.

G u ( $ evu

~

Notary Public My Ccomission Expires:

September 20, 1984

-