Letter Sequence Request |
---|
|
|
MONTHYEARML20024C7691983-07-0505 July 1983 Forwards Comments on SER Re Util Relief Requests from Inservice Testing Requirements.Sers Should Be Revised by 830901 to Ensure That Unit 2 Outage Will Not Be Impacted Project stage: Request ML20078D1551983-09-27027 September 1983 Submits Evaluation of Existing Westinghouse STS Provisions, ASME Code Section Xi,Reactor Safety Study (Wash 1400), NUREG-0677 & Eg&G Rept, Inservice Leak Testing of Primary Pressure Isolation Valves, as Applicable to Plant Design Project stage: Request ML20081B2161983-10-21021 October 1983 Application to Amend License NPF-2,permitting one-time Tech Spec Change Re Movable in-core Detectors.Change Does Not Involve Significant Hazards Consideration Project stage: Request ML20080Q9541984-02-22022 February 1984 Requests That Schedule for Upgrading Environ Qualification of Accident Monitoring Equipment,Per Reg Guide 1.97 & 10CFR50.49(g),be Extended to Sixth Refueling Outage,But No Later than 851130 Project stage: Request ML20087P8551984-03-30030 March 1984 Forwards Reg Guide 1.97 Compliance Rept, Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant & Environ Conditions During & After Accident,Vols 1-4, Per NUREG-0737,Suppl 1 Project stage: Other ML20083N5001984-04-16016 April 1984 Requests That LB Lewis Replace RA Thomas on Mailing List Project stage: Request ML20092P3201984-06-29029 June 1984 Forwards Reg Guide 1.97, 'Instrumentation for Light-Water- Cooled Nuclear Power Plants to Assess Plant & Environs Conditions During & Following Accident,' Compliance Rept Per Suppl 1 to NUREG-0737 Project stage: Other ML20095A2251984-08-17017 August 1984 Forwards List of Accident Monitoring Equipment to Be Replaced within Extended Schedule of 10CFR50.49,per Reg Guide 1.97 Project stage: Other ML20099C9291984-11-13013 November 1984 Forwards Response to NRC 841031 Request for Info Re Safety Parameter Display Sys Electrical Isolation Device Compliance W/Environ & Seismic Qualifications Which Were Basis for Licensing of Plant Project stage: Request ML20106H0841984-12-31031 December 1984 Conformance to Reg Guide 1.97,JM Farley Nuclear Plant, Units 1 & 2, Interim Rept Project stage: Other ML20113D5411985-04-10010 April 1985 Forwards Response to NRC 850207 & 0330 Interim Reg Guide 1.97 Rept,Jm Farley Units 1 & 2. Revised Pages for Variables 19/32 & 19/33 for Unit 2 Also Encl Project stage: Other ML20214J6261986-08-0808 August 1986 Forwards Response to Request for Addl Info Re Reg Guide 1.97 Compliance,Including Info on Pressurizer Heater Status,Per Item II.E.3.1 of NUREG-0737 Project stage: Request ML20211D5441986-11-30030 November 1986 Rev 1 to, Conformance to Reg Guide 1.97,JM Farley Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20211D5231987-01-0707 January 1987 Forwards Safety Evaluation Accepting Response to Generic Ltr 82-33 Re Conformance to Reg Guide 1.97 & Rev 1 to Technical Evaluation Rept EGG-EA-6794, Conformance to Reg Guide 1.97,Joseph M Farley Nuclear Plant,Units 1 & 2 Project stage: Approval ML20211D5081987-02-12012 February 1987 Forwards Correction to Re Conformance to Reg Guide 1.97.Entire Rev 1 to Technical Evaluation Rept EGG-EA-6794 Encl Project stage: Other 1984-04-16
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7131990-09-17017 September 1990 Advises That Due to Reassignment,Jj Clark No Longer Needs to Maintain Senior Reactor Operator Licenses ML20059J2811990-09-14014 September 1990 Forwards List of Key Radiation Monitors Which Will Be Used as Inputs to Top Level Radioactivity Status Bar Re Spds.List Identifies Monitors Which Would Provide Concise & Meaningful Info About Radioactivity During Accidents ML20065D5961990-09-13013 September 1990 Responds to Violations Noted in Insp Repts 50-348/90-19 & 50-364/90-19.Response Withheld ML20059J1661990-09-13013 September 1990 Forwards Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant & Rev 10 to ODCM ML20059L0751990-09-12012 September 1990 Forwards Revised Pages to Rev 3 to, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2911990-09-12012 September 1990 Forwards Operator Licensing Natl Exam Schedules for FY91 Through FY94,per Generic Ltr 90-07.Requalification Schedules & Estimated Number of Candidates Expected to Participate in Generic Fundamental Exam,Also Encl ML20064A7111990-09-12012 September 1990 Forwards Rev 1 to Relief Request RR-1, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2891990-09-12012 September 1990 Confirms Rescheduling of Response to Fitness for Duty Program Notice of Violation 90-18-02,per 900907 Telcon ML20065D6621990-09-12012 September 1990 Forwards NPDES Permit AL0024619 Effective 900901.Limits for Temp & Residual Chlorine Appealed & Stayed ML20064A3431990-08-28028 August 1990 Forwards Corrected Insertion Instructions to Rev 8 to Updated FSAR for Jm Farley Nuclear Plant ML20059D4711990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for Jan-June 1990 ML20059B5101990-08-22022 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990.No Changes to Process Control Program for First Semiannual Period of 1990 Exists ML20056B2751990-08-20020 August 1990 Forwards Relief Requests from Second 10-yr Interval Inservice Testing Program for Class 1,2 & 3 Pumps & Valves. Request Incorporates Commitments in 891222 Response to Notice of Violation ML20056B2741990-08-20020 August 1990 Forwards Rev 2 to Unit Inservice Testing Program,For Review & Approval.Rev Incorporates Commitments Addressed in Util 891222 Response to Notice of Violation & Other Editorial & Technical Changes ML20058Q1481990-08-15015 August 1990 Forwards Rev 3 to FNP-1-M-043, Jm Farley Nuclear Plant Unit 1 Second 10-Yr Inservice Insp Program,Asme Code Class 1,2 & 3 Components ML20058P6201990-08-15015 August 1990 Forwards Rev 1 to FNP-2-M-068, Ten-Yr Inservice Insp Program for ASME Code Class 1,2 & 3 Components, Per 891207 & 900412 Responses to NRC Request for Addl Info ML20055G7701990-07-18018 July 1990 Updates 900713 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20055F7411990-07-11011 July 1990 Forwards Monthly Operating Rept for June 1990 & Corrected Monthly Operating Repts for Nov 1989 Through May 1990.Repts Revised to Correct Typo on Value of Cumulative Number of Hours Reactor Critical ML20055F3781990-07-10010 July 1990 Submits Final Response to Generic Ltr 83-28,Items 4.2.3 & 4.2.4.Util Position That Procedures Currently Utilized by Plant Constitute Acceptable Ongoing Life Testing Program for Reactor Trip Breakers & Components ML20055D4861990-07-0202 July 1990 Requests Authorization to Use Encl ASME Boiler & Pressure Vessel Code Case N-395 Re Laser Welding for Sleeving Process Described by Oct 1990,per 10CFR50.55a,footnote 6 ML20055D1001990-06-26026 June 1990 Responds to Violations Noted in Insp Repts 50-348/90-12 & 50-364/90-12 on 900411-0510.Corrective Actions:Electrolyte Level Raised in Lights Identified by Inspector to Have Low Electrolyte Level ML20044A6191990-06-26026 June 1990 Suppls 900530 Ltr Containing Results of SPDS Audit,Per Suppl 1 to NUREG-0737.One SPDS Console,Located in Control Room,Will Be Modified So That Only SPDS Info Can Be Displayed by Monitor.Console Will Be Reconfigured ML20043G4741990-06-11011 June 1990 Submits Addl Info Re 900219 Worker Respiratory Protection Apparatus Exemption Rev Request.Proposed Exemption Rev Involves Features Located Entirely within Restricted Area as Defined in 10CFR20 ML20043C1851990-05-29029 May 1990 Forwards Proposed Schedules for Submission & Requested Approval of Licensing Items ML20043B5941990-05-25025 May 1990 Provides Rept of Unsatisfactory Performance Testing,Per 10CFR26,App A.Error Caused by Olympus Analyzer Which Allowed Same Barcode to Be Assigned to Two Different Samples. Smithkline Taken Action to Prevent Recurrence of Scan Error ML20042G7461990-05-10010 May 1990 Certifies That Plant Licensed Operator Requalification Program Accredited & Based Upon Sys Approach to Training,Per Generic Ltr 87-07.Program in Effect Since 890109 ML20042F0831990-05-0101 May 1990 Forwards Rev 18 to Security Plan.Rev Withheld ML20042G3081990-04-25025 April 1990 Forwards Alabama Power Co Annual Rept 1989, Unaudited Financial Statements for Quarter Ending 900331 & Cash Flow Projections for 1990 ML20042E4121990-04-12012 April 1990 Provides Addl Info Re Review of Second 10-yr Inservice Insp Program,Per NRC 890803 Request.Relief Request RR-30 Requested Reduced Holding Time for Hydrostatically Testing Steam Generator Secondary Side ML20012E9571990-03-27027 March 1990 Forwards Annual Diesel Generator Reliability Data Rept,Per Tech Spec 6.9.1.12.Rept Provides Number of Tests (Valid or Invalid),Number of Failures for Each Diesel Generator at Plant for 1989 & Info Identified in Reg Guide 1.108 ML20012D9661990-03-22022 March 1990 Forwards Annual ECCS Evaluation Model Changes Rept,Per Revised 10CFR50.46.Info Includes Effect of ECCS Evaluation Model Mods on Peak Cladding Temp Results & Summary of Plant Change Safety Evaluations ML20012D8901990-03-20020 March 1990 Clarifies 891130 Response to Generic Ltr 83-28,Item 2.2.1 Re Use of Q-List at Plant,Per NRC Request.Fnpims Data Base Utilized as Aid for Procurement,Maint,Operations & Daily Planning ML20012C4701990-03-15015 March 1990 Responds to NRC 900201 Ltr Re Emergency Planning Weaknesses Identified in Insp Repts 50-348/89-32 & 50-364/89-21. Corrective Actions:Cited Procedures Revised.Direct Line Network Notification to State Agencies Being Implemented ML20012C6241990-03-14014 March 1990 Informs of Resolution of USI A-47,per Generic Ltr 89-19 ML20012C4651990-03-13013 March 1990 Provides Verification of Nuclear Insurance Reporting Requirements Specified in 10CFR50.54 w(2) ML20012C2051990-03-0505 March 1990 Forwards SPDS Critical Function Status Trees,Per G West Request During 900206 SPDS Audit at Plant.W/O Encl ML20012A1621990-03-0202 March 1990 Forwards Addl Info Inadvertently Omitted from Jul-Dec 1989 Semiannual Radioactive Effluent Release Rept,Including Changes to Process Control Program ML20012A1301990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire Encl ML20043A7481990-02-0202 February 1990 Forwards Util Exam Rept for Licensed Operator Requalification Written Exams on 900131 ML20006D2311990-01-31031 January 1990 Responds to NRC Bulletin 89-003 Re Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures Will Be Revised to Incorporate Guidance That Will Preclude Inadvertent Loss of Shutdown ML20006A9091990-01-23023 January 1990 Forwards Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Has Program to Perform Visual Insps & Cleanings of Plant Svc Water Intake Structure by Means of Scuba Divers ML20005E4931989-12-28028 December 1989 Provides Certification That fitness-for-duty Program Meets 10CFR26 Requirements.Testing Panel & cut-off Levels in Program Listed in Encl ML20005E3681989-12-28028 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-28 & 50-364/89-28 on 891002-06.Corrective Actions:All Piping Preparation for Inservice Insp Work in Containment Stopped & All Participants Assembled to Gather Facts on Incident ML20005E1971989-12-27027 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22 on 890911-1010.Corrective Actions:Steam Generator Atmospheric Relief Valve Closed & Core Operations Suspended.Shift Supervisor Involved in Event Counseled ML20011D5041989-12-22022 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-26 & 50-364/89-26.Corrective Actions:Personnel Involved in Preparation of Inservice Test Procedures Counseled. Violation B Re Opening of Pressurizer PORV Denied ML19332F2111989-12-0707 December 1989 Forwards Final Response to NRC 890803 Request for Addl Info Re Review of Updated Inservice Insp Program,Summarizing Results of Addl Reviews & Providing Exam Listing Info ML19332F0791989-12-0707 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22.Corrective Actions:All Managers Retrained on Intent of Overtime Procedures & Sys Established to Provide Independent Check of All Time Sheets Each Pay Period ML19332F1141989-12-0707 December 1989 Forwards Description of Instrumentation Sys Selected in Response to Generic Ltr 88-17, Loss of DHR, Per Licensee 890127 Commitment.Hardware Changes Will Be Implemented During Unit 1 Tenth & Unit 2 Seventh Refueling Outages ML19332F1241989-12-0707 December 1989 Forwards Response to NRC 890803 Request for Addl Info Re Review of Second 10-yr Inservice Insp Program,Per 891005 Ltr ML19353B0071989-12-0606 December 1989 Forwards Rev 1 to Safeguards Security Contingency Plan.Rev Withheld 1990-09-17
[Table view] |
Text
. . _ _ .
Memng Address Alabama Power Company
- 800 North 18th Street Post Offica Box 2641 Birmingh5m. Atbam:35291 Telephone 205 783@81 l
F. L. Clayton, Jr.
Senior Vice President Fhntridge Buildmg AlabamaPbwer July 5,1983 the sMhern ddric systern Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Requests For Relief From Inservice Testing Requirements Gentlemen:
Alabama Power Company has reviewed the NRC safety evaluations related to the subject requests as set forth in your letters dated April 8,1983 for Farley Nuclear Plant Unit 2 and dated May 2,1983 for Farley Nuclear Plant Unit 1. Alabama Power Company concurs with the granted reliefs with the exception of the items discussed in Attachments 1 and 2.
Included in the attachments are clarifications and corrections to the SERs and results of telecons with the NRC Staff.
It is requested that the NRC revise the Unit 1 and 2 SERs by September 1,1983 as described in Attachments 1 and 2. Such revisions would ensure that the upcoming Unit 2 refueling outage (scheduled to begin September 16,1983) is not impacted and that Alabama Power Company will be in compliance with an NRC approved IST program.
If you have any questions, please advise.
Yours very truly, YU '
F. L. Clayton, r.
FLCJr/BDM:Jc-D29 Attachment cc: Ns1 MF.' G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Dr. I. L. Myers 8307130262 830705 i PDR ADOCK 05000348 1 P PDR lI
ATTACHMENT 1 J. M. Farley Nuclear Plant - Unit 1 Inservice Testing Program Comments on NRC Safety Evaluation Report
- 1. Page 2 of cover letter - The application of this paragraph to Unit 2 is unclear. Specifically, Alabama Power Company is uncertain as to which schedular requirements the NRC refers. Based on telephone conversations with the NRC Staff on June 29, 1983, it is our understanding that this paragraph applies only to Unit 2 items 3 & 4 of Attachment 2 to this letter which are related to the RWST check valve (Q2E13V014) and the accumulator discharge check valves (Q2E21V032A, B, C and QE21V037A, B and C).
- 2. Page 3 of summary and pages 40 and 47 of Attachment 2 - The position indicators for these valves are designed such that physical actuator movement must take place in order to activate the indicator. It is the judgement of Alabama Power Company that valve position indication from physical actuator movement provides accurate position status. The leak-rate test verifies that the position indicators accurately reflect the valves' fully closed position.
The air pressure following each leak-rate test is relieved by opening these valves, thus verifying that the disk moves away from the seat because of the actuator. It is the judgement of Alabama Power Company that the proposed alternatives provide sufficient technical basis for granting of this relief request and that these alternatives meet the intent of the code.
During a telephone conversation with the NRC Staff on June 29, 1983, it was proposed that remote valve position indication from physical actuator movement be considered adequate to verify valve position.
It is requested that the NRC grant relief by September 1,1983 to delete the requirement for visual observation of RHR valves (Q1E11V025A and B) and containment spray valves (Q1E13V003A and B).
- 3. Paga 3 of summary and page 51 of Attachment 2 - In addition to the information previously submitted it should be noted that during refueling, i.e., with water in the refueling canal, approximately 150,000 gallons of water remain in the RWST. In order to disassemble V014, the RWST would have to be drained which could potentially degrade some of the plant safety features and present radiological and other problems associated with temporary storage of the 150,000 gallons of radioactive water. Alabama Power Company knows of no means to verify full stroke exercising of this valve without an expensive design change to install a safety grade manual isolation valve between the RWST and this check valve. Such a modification would necessitate extension of a regularly scheduled refueling outage by approximately two weeks. It is Alabama Power Company's understanding that the performance of inservice testing as mandated by regulatory requirements should not require a design change.
1 I
l
ATTACHMENT 1 Page 2 4
As discussed during the conversation with the NRC Staff on June 29, 1983, Alabama Power Company will provide the NRC additional information to support permanent relief from full stroke exercising of valve Q1E13V014 This additional information will be provided to tae NRC prior to the end the Unit 1 sixth refueling outage.
- 4. Page 4 of summary and pages 64, 65 and 66 of Attachment 2 - From the information previously submitted it has been determined that full-stroke exercising of the accumulator discharge valves is impractical from a flow standpoint. The only other means of full-stroke testing these valves, of which we are aware of, is to remove the valve bonnet and physically exercise these valves. This is impractical from a radiation exposure standpoint. Alabama Power Company anticipates that approximately 3.5 manrems of exposure would be used to disassemble, exercise, and reassemble each valve. This results in approximately 21 manrems of exposure for these six valves, which directly conflicts with the NRC's ALARA requirements.
In addition, disassembly of these valves would have to be conducted with the reactor vessel water level at mid plane which could significantly extend the critical path outage time requirement for normal refueling.
During conversations with the NRC Staff on June 29, 1983, it was stated that Alabama Power Company would provide additional information to the NRC supporting permanent relief from full-stroke exercising of valves Q1E21V032A, B, C and Q1E21V037A, B, C. This additional information will be provided to the NRC prior to the end of the Unit 1 sixth refueling outage.
- 5. Page 5 of summary - Valves Q1E21V037A, B, C were previously identified in item C of page 2 of the summary, therefore it is requested that these valves be deleted from item E of the summary list.
- 6. Pages 6 and 7 of summary - During the Unit 2 licensing process, the NRC added several valves to the Unit 2 Technical Specification requiring leak-rate testing. Alabama Power Company did not agree with the valves included in the Unit 2 Technical Specifications and upon subsequent review has determined that several valves should be deleted. During review of Alabama Power Company's Unit 1 IST program, the NRC added several valves to be leak-rate tested such that the same valves would be tested for Unit 1 as Unit 2.
As in the case of Unit 2, Alabama Power Company has determined that several valves should be deleted from the Unit 1 leak-rate test req ui rements.
ATTACHMENT 1 Page 3 In order to protect certain low pressure systems from overpressurization from the reactor coolant system (RCS) it has been determined that certain check valves are required to be leak-rate tested. Listed below are the check valves which Alabama Power Comparty has determined will provide protection for low pressure systems by establishing a two check valve pressure isolation barrier.
Pressure Isolation Valves System Unit 1 Valves HHSI/CVCS Q1E21V032A,B, C V037A,B, C V076A,B V077A,B, C RHR/LHSI Q1E11V021A,B, C
- Valves V042A,B and V021A,B are two sets of check valves in series with V051A,B,C. Alabama Power Comparty has reviewed the valve configurations and has determined that valves V021A,B,C and V042A,B should be leak-rate tested. Such testing would protect the RHR system (low pressure) from the reactor coolant system and, in the case of safety injection actuation, the HHSI punp discharge pressure. Since testing of V021A,B,C and V042A,B meets the NRC criteria for high to low pressure system protection, valves V051A,B,C need not be tested.
I i
0 The remaining check valves on page 7 of the summary are located downstream of the HHSI/CVCS pumps. It is the judgement of Alabama Power-Company that these check valves are not required to be leak-rate tested to protect the HHSI/CVCS system on the suction side of the pumps. Below is the basis for this position.
- a. The three Farley centrifugal charging pumps provide a dual function of providing flow for the CVCS and the HHSI. On some other plants the charging pumps and the HHSI pumps are separate pumps.
l b. During normal operation (Modes 1, 2 & 3) two charging pumps are required by the Technical Specifications to be operable. Duri ng l hot shutdown (Mode 4) the Technical Specifications require that one charging pump be operable.
- c. During normal operation (Modes 1 through 4) at least one charging pump is running to provide normal charging to the RCS and to provide flow to reactor coolant pump seals. Therefore,
ATTACHMENT 1 Page 4 the charging pump discharge header is at normal charging pressure
.which is higher than RCS pressure. This precludes the RCS from interfacing with low pressure portions of the HHSI/CVCS.
- d. In series with check valves V062A,B,C exists two normally closed MOVs, the HHSI pump discharge check valve and V051A,B,C. These MOVs only open on a safety injection signal.
In series with check valves V066A,B,C exists one normally closed MOV, the HHSI pump discharge check valve and V051A,B,C. This M0V would only be opened during the recirculation phase following safety injection actuation and low-low level in the RWST.
In series with check valves V078A,B,C (V079A,B,C) exists one normally closed M0V, the HHSI pump discharge check valve and V077A,B,C which Alabama Power Company proposes to leak-rate test.
As required by Technical Specifications, the power for the valve operator is locked open. In addition, this MOV is only opened during the recirculation phase following safety injection actuation and low-low level in the RWST.
Alabama Power Company proposes not to test any of the above check valves.
Also, page 7 of the summary lists four motor operated valves as pressure isolation valves. These valves are listed below:
Motor Operated Valves System Valve RHR/LHSI Q1E11V001A,B V016A,B It is the judgement of Alabama Power Company that these valves are not required to be leak-rate tested in order to protect the RHR/LHSI low pressure systems. Below is the basis for this position.
a) Valves are interlocked such that they cannot be opened when the r
reactor coolant system pressure is above 402.5 psig.
b) Valves V001A&B currently receive a Type C test per Appendix J of 10 CFR 50.
c) In the event of high to low pressure system leakage, the RHR i
_ suction relief valves would operate protecting the RHR system l from overpressure. These relief valves have their setpoints
- verified as required by Technical Specifications. The RHR suction relief valves discharge to the containment.
l
~~
ATTACHMENT 1 Page 5 d) Motor operated valves are not subject to the same type of failures as check valves.
It is concluded that the valves previously listed as " Pressure Isolation Valves" and their equivalents in Unit 2 should be the valves leak-rate tested as pressure isolation valves. A Technical Specification change has already been submitted to request that the allowable leakage rates for the Unit 2 valves be changed to agree with that in Unit 1 as described in letters from F. L. Clayton to S. A. Varga, dated August 10, 1982 and December 23, 1982.
During conversations held on June 29,1983, the NRC staff stated that they were reviewing the above list of proposed valves to be leak-rate tested. In addition, the NRC Staff stated that a revised valve leakage criteria is being reviewed by the CRGR. Alabama Power Company stated that a change in the technical specification criteria for valve leakage testing would be requested for the upcoming Unit 2 refueling outage if the August 10, 1982 request is not approved prior to September 1,1983. Subseq uent to the finalization of NRC leakage criteria, Alabama Power Company will submit a revised technical specification change related to valve leakage criteria and the scope of valves to be leak-rate tested.
- 7. Page 8 of summary - Valve Q1P19V004 is a check valve and it is the judgement of Alabama Power Company that verifying check valve position quarterly and each time the check valve is cycled is impractical. It was discussed during conversations held on June 29, 1983 with the NRC staff that Alabama Power Company would not verify the position of this check valve until the NRC formally identifies the test criteria to Alabama Power Company.
- 8. Page 8 and 9 of summary - As discussed with the NRC Staff on June 29, 1983, Alabama Power Company commitments made in response to IEB 83-03 will be sufficient to meet the intent of item K and will define the status of these valves, relative to the IST program.
D-29
ATTACHMENT 2 J. M. Farley Nuclear Plant - Unit 2 Inservice Testing Program Comments on NRC Safety Evaluation Report
- 1. Page 11 - To agree with the requested relief the following should be inserted in place of the brackets as shown on page 11 "... paragraph 2.1.1.2. In the event the quarterly requirments of Table P-I and During the June 29, 1983 telephone conversation with the NRC Staff, it was proposed that the above comment be included in the revised SER.
- 2. Pages 52 and 61 - The position indication for three of the four valves is obtained from physical actuator movement. The fourth valve utilizes a torque switch to provide valve position. A modification is planned for the second refueling outage (scheduled to begin in September 1983) such that position indication is derived from physical actuator movement. It is the judgement of Alabama Power Company that valve position indication obtained from physical actuator movement provides accurate position status. The leak-rate test verifies that the position indicators accurately reflect the valves' fully closed position. The air pressure following each leak-rate test is relieved by opening these valves, thus verifying that the disk moves away from the seat because of the actuator. It is the judgement of Alabama Power Company that the proposed alternatives provide sufficient technical basis for granting of this relief request and that these alternatives meet the intent of the code.
During a telephone conversation with the NRC Staff on June 29, 1983, it was proposed that remote valve position indication from physical actuator movement be considered adequate to verify valve position.
It is requested that the NRC grant relief by September 1,1983 to delete the requirement for visual observation of RHR valves (Q2E11V025A and B) and containment spray valves (Q2E13V003A and B).
- 3. Page 64 - In addition to the information previously submitted it should be noted that during refueling, i.e., with water in the refueling canal, approximately 150,000 gallons of water remain in the RWST. In order to disassemble V014, the RWST would have to be drained which could potentially degrade some of the plant safety features and present radiological and other problems associated with temporary storage of the 150,000 gallons of radioactive water.
Alabama Power Company knows of no means to verify full stroke exercising of this valve without an expensive design change to install a safety grade manual isolation valve between the RWST and this check valve. Such a modification would necessitate extension of a regularly scheduled refueling outage by approximately two weeks. It is Alabama Power Company's understanding that the performance of inservice testing as mandated by regulatory requirements should not require a design change.
c- -
Attachment 2 Page 2 As discussed during the conversation with the NRC Staff on June 29, 1983, Alabam6 Power Company will provide the NRC additional information to support permanent relief from full stroke exercising
, of valve Q2E13V014. This additional information will be provided to the NRC prior to the end of the Unit 2 third refueling outage.
- 4. Pages 67, 68 and 69 - From the information previously submitted it has been determined tnat rull-stroke exercising of the accumulator discharge valves is impractical from a flow standpoint. The only other means of full-stroke testing these valves, of which we are aware of, is to remove the valve bonnet and physically exercise these valves. This is impractical from a radiation exposure standpoint. Alabama Power Company anticipates that approximately 3.5 manrems of exposure would be used to disassemble, exercise and reassemble each valve. This results in approximately 21 manrens of exposure for these six valves, which directly conflicts with the NRC 's ALARA reluirements. In addition, disassembly of these valves would have to be conducted with the reactor vessel water level at mid-plane which could significantly extend the critical path outage time requirement for normal refueling.
During conversations with the NRC Staff on June 29, 1983, it was stated that Alabama Power Company would provide additional information to the NRC supporting permanent relief from full-stroke exercising of valves Q2E21V032A, B, C and Q2E21V037A, B, C. This additional information will be provided to the NRC prior to the end of the Unit 2 third refueling outage.
i D-29