Molling A@fross Alabama Power Company 600 North 18th Street Post Office Box 2641 y
Birmingham. Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabama Power August 17, 1984 t~ n *"* '
Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 2 10CFR50.49 - Environmental Qualification of Regulatory Guide 1.97 Equipment Gentlemen:
In letter dated October 21, 1983, the NRC granted Alabama Power Company an extension until March 31, 1985 to complete the upgrading of selected Unit 2 Regulatory Guide 1.97 (R.G.1.97) equipment in lieu of the schedule provided in 10CFR50.49(g). This extension was in response to Alabama Power Company's September 27, 1983 request which included as Attachment 2 a list of accident monitoring equipment potentially requiring environmental qualification. These potential modifications were referenced in the October 21, 1983 NRC letter as those modifications for which the extension to March 31, 1985 had been granted.
Alabama Power Coaipany, in consultation with the NRC Staff, has subsequently determined that modifications of R.G.1.97 instruments with only environmental qualification deviations may be considered separately from modifications of R.G.1.97 instruments which address deviations of more than one R.G.1.97 criteria. As a result, those instruments identified in Attachment 2 of the September 27, 1983 letter with only deviations to the environmental qualification provisions of R.G.1.97 will be completed in accordance with the 10CFR50.49 schedule of March 31, 1985, as provided in the October 21, 1983 NRC extension letter.
These instruiwnts, applicable to the 10CFR50.49 completion schedule, are included in the attachment to this letter.
f ACy 8408210412 840817 q$Rg PDR ADOCK 05000364 P
PDR i
-. - = =
, _ =
Mr. S. A. Varga August 17, 1984
[
U. S. Nuclear Regulatory Connission Page 2 It should be noted that these Farley Nuclear Plant - Unit 2 items are equivalent to the itens for which the NRC granted an extension for Unit 1 by letter dated April 16, 1984. The remaining Unit 2 potential environmental qualification modifications identified in the September 27,'1983 Alabana Power Company extension request will be completed in accordance with the Regulatory Guide 1.97 implementation schedule as comm<tted to in Alabama Power Company's March 30, 1984 R.G. 1.97 Compliance Report to the NRC.. The qualification of the accident monitoring equipment in this manner provides for a coordinated modification effort which addresses all applicable R.G.1.97 provisions for each instrument as opposed to a series of modification efforts on the same. instrument which address only individual R.G.1.97 provisions (e.g., environmental qualification).
If you have any questions, please advise.
Yours very tru J
j R. P. Mcdonald RPM / JAR:grs-D29 Attachment cc: Mr. L. B. Long Mr. G. F. Trowbridge Hr. J. P. O'Reilly Mr. E. A. Reeves i
Mr. W. H. Bradford 4
i l
I I
l l
i
... ~
__._,__..m.
,__,._,,-y._.,,,
.-___m..,
e r -, m
,,x
e Attachment Accident Monitoring Equipment Which is to be Replaced Within the Extended Schedule of 10CFR50.49 Identified below are manufacturer and model numbers for presently installed equipment that is located in a harsh environment and for which environmental qualification documents have not been located. These components are scheduled to be replaced with qualified components during the Unit 2, third refueling outage.
A.
Containment Spray Flow Plant ID No.
Generic Name Manufacturer Model Location N2E13FT0958A Tran smitter Foxboro E13DMISAH2 Auxiliary Building El-100' N2E13FT0958B Transmitter Foxboro E130MISAH2 Auxiliary Building El. 100' B.
Charging Line Flow Plant ID No.
Generic Name Manufacturer Model Location N2E21FT0122 Transmitter Foxboro E13DHISAH2 Auxiliary Building El. 100' C.
Letdown Flcw Plant ID No.
Generic Hame Manufacturer Model Location Q2E21FT0150 Transmitter Foxboro E13DMISAH2 Auxiliary Building E1. 100 D.
Volume Control Tank Level Plant ID No.
Generic Name Manufacturer Model Location Q2E1LT0115 Transmitter Barton 396 Auxiliary Building E1. 121'
Attachment Accident Monitoring Equipment Which is to be Replaced Within the Extended Schedule of 10CFR50.49 Page 2 E.
Reactor Coolant Pimp Seal Injection Flow Plant ID No.'
Generic Name Manufacturer Model Location N2E21FT0124 Transmitter Foxboro E13DHISAM2 Auxiliary Bldg.
El. 121' 127 Transmitter Foxboro E13DHISAM2 Auxiliary Bldg.
El. 121' 130 Transmitter Foxboro E13DHISAM2 Auxiliary Bldg.
El. 121' N2E21FIO124B Local To be To be Auxiliary Indicator Determined Determined Bldg.
El. 121' 127B Local To be To be Auxiliary Indicator Determined Determined Bldg.
El. 121' 1308 Local To be To be Auxiliary Indicator Determined Determined Bldg.
E1. 121' F.
Containment High Range Radiation Monitor-Plant ID No.
Generic Name Manufacturer Model Location 2VAIS011F Cable Belden 8263 Auxiliary Bldg.
El. 139' 2VAIS011H Cable Belden 8263 Auxiliary Bldg.