MONTHYEARML20081B2161983-10-21021 October 1983 Application to Amend License NPF-2,permitting one-time Tech Spec Change Re Movable in-core Detectors.Change Does Not Involve Significant Hazards Consideration Project stage: Request ML20080Q9541984-02-22022 February 1984 Requests That Schedule for Upgrading Environ Qualification of Accident Monitoring Equipment,Per Reg Guide 1.97 & 10CFR50.49(g),be Extended to Sixth Refueling Outage,But No Later than 851130 Project stage: Request ML20087P8551984-03-30030 March 1984 Forwards Reg Guide 1.97 Compliance Rept, Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant & Environ Conditions During & After Accident,Vols 1-4, Per NUREG-0737,Suppl 1 Project stage: Other ML20083N5001984-04-16016 April 1984 Requests That LB Lewis Replace RA Thomas on Mailing List Project stage: Request ML20092P3201984-06-29029 June 1984 Forwards Reg Guide 1.97, Instrumentation for Light-Water- Cooled Nuclear Power Plants to Assess Plant & Environs Conditions During & Following Accident, Compliance Rept Per Suppl 1 to NUREG-0737 Project stage: Other ML20095A2251984-08-17017 August 1984 Forwards List of Accident Monitoring Equipment to Be Replaced within Extended Schedule of 10CFR50.49,per Reg Guide 1.97 Project stage: Other ML20099C9291984-11-13013 November 1984 Forwards Response to NRC 841031 Request for Info Re Safety Parameter Display Sys Electrical Isolation Device Compliance W/Environ & Seismic Qualifications Which Were Basis for Licensing of Plant Project stage: Request ML20106H0841984-12-31031 December 1984 Conformance to Reg Guide 1.97,JM Farley Nuclear Plant, Units 1 & 2, Interim Rept Project stage: Other ML20113D5411985-04-10010 April 1985 Forwards Response to NRC 850207 & 0330 Interim Reg Guide 1.97 Rept,Jm Farley Units 1 & 2. Revised Pages for Variables 19/32 & 19/33 for Unit 2 Also Encl Project stage: Other ML20214J6261986-08-0808 August 1986 Forwards Response to Request for Addl Info Re Reg Guide 1.97 Compliance,Including Info on Pressurizer Heater Status,Per Item II.E.3.1 of NUREG-0737 Project stage: Request ML20211D5441986-11-30030 November 1986 Rev 1 to, Conformance to Reg Guide 1.97,JM Farley Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20211D5231987-01-0707 January 1987 Forwards Safety Evaluation Accepting Response to Generic Ltr 82-33 Re Conformance to Reg Guide 1.97 & Rev 1 to Technical Evaluation Rept EGG-EA-6794, Conformance to Reg Guide 1.97,Joseph M Farley Nuclear Plant,Units 1 & 2 Project stage: Approval ML20207N3461987-01-0707 January 1987 Corrected Tech Spec Pages 3/4 4-29,3/4 4-30 & B 3/4 4-10 from Amend 55 to License NPF-8 Project stage: Request ML20211D5081987-02-12012 February 1987 Forwards Correction to Re Conformance to Reg Guide 1.97.Entire Rev 1 to Technical Evaluation Rept EGG-EA-6794 Encl Project stage: Other 1984-06-29
[Table View] |
Text
r Malling Addess Alabama Pomor Company 600 North 18th Street Post Office Box 2641 '
Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
Senior Vice President Flintridge Building AlabamaPower the soutnem electnc system April 16,1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Distribution Update Gentlemen; Please substitute Mr. Lewis B. Long, General Manager, for Mr. Ruble A. Thomas, Vice President, on all correspondence pertaining to Alabama Power Company.
If you have any questions, please advise.
Yours very truly, F. L. Clayton Jr.
FLCJ r/ JAR:ddr-D29 cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A.~ Reeves Mr. W. H. Bradford ChK O h k O