ML20024C127

From kanterella
Jump to navigation Jump to search
Ro:On 830623,visual Insp Revealed Three Broken Holddown Springs.Investigation Incomplete.Ro 269/83-13 Will Be Submitted by 830721
ML20024C127
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/01/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8307120289
Download: ML20024C127 (1)


Text

US dE POWER GOMPANY

[ % .a

-* P.O. BOK 33180 MRLOTTE, N.C. 28242 HALH. TUCKER

" " " ' ' ' " ' " " " B33g-g n*h TELEPHONE July 1, 1983 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re: Oconee Nuclear Station Docket No. 50-269

Dear Mr. O'Reilly:

On June 23, 1983 your office was informed that three broken holddown springs were discovered during a visual inspection. This constitutes performance of components that requires remedial action to prevent operation in a taanner less conservative than assumed in the accident analyses in the safety analysis report. Reportable Occurrence Report R0-269/83-13 providing details of this incident was to have beer, submitted to you by July 7, 1983 pursuant to Technical Specification 6.6.2.1.a(9). However, the investigation of this incident and the preparation of a report are incomplete at this time. It is expected that the investigation and report will be completed, reviewed, and submitted to you no later than July 21, 1983.

Very truly yours, Hal B. Tucker l

JCP/php cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector Oconee Nuclear Station INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 Mr. John F. Suermann Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 0FFICIAL cop 4 8307120289 830701 PDR ADOCK 05000269 S PDR lD

-_ .- ..