ML19282D029
| ML19282D029 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/15/1979 |
| From: | DUKE POWER CO. |
| To: | |
| References | |
| FOIA-79-98 NUDOCS 7905110017 | |
| Download: ML19282D029 (2) | |
Text
- .,
DUKE ?CW 2. COMPA.',"?
CCC..-
,w,.I.
se L:
.. s 1ere-- Number-10-269/7317
- e or: Ca:e: Ja uary 15, 1979 Occurrence Oa:e: Dece_ber 14, 1973 racili:v: Ccenae i.*ni: 1. Seneca, Scu:h Carolina
!fentificati:n ef Occurrence: ES Ac:ua:icn Folleving Reac:0: Trip Candi:icns ? tor to Occurrence:
93.". Full ?:ver Descrietien Of Cecurrence:
A: appro:ciza:ely llCO hou:s on Dece ber 13,1973, :he Reac:or Coolan:
Syste: average :e:pera:ure (Tave) s:stala = beca:e erra:1 and a work request :o investigate was issued. On December 14, 1978 during inves:-
igation of the erra:1: statalar= behavior a short occurred on the power cord feeding :he ICS Tave recorder. The sher: caused an erroneous low
! ave 1: dica: ion of approxi=a:ely 13 F.
The ICS began vi:hdravi g cen::el
- d group 7 :s sai=:ais Tave. The reactor ::1pped oc high pressure /:e:p-era:ure a: 1636 hours0.0189 days <br />0.454 hours <br />0.00271 weeks <br />6.22498e-4 months <br />. Both mor=al feedva:er pu=ps : ripped en high discharge ;; essure. The emergency feedva:er pu=p s:arted, : hen s:cpped when :he nor:a1 feedvater pu=ps rese: a:d restarted.
By app cx1=atelf 1638 hours0.019 days <br />0.455 hours <br />0.00271 weeks <br />6.23259e-4 months <br /> :he level in :he GTSO's had dropped :o 6 and 0 inches respec-
- ively ( c =al level is,= ore :han 110 inches). The e=ergency feedva:ce pu=p started to feed :he 3 ge= era or.
Levels in :he A genera:or returned
- o nor=al by 1641 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.244005e-4 months <br /> bu: :he 3 ge: era:or increased :o 35 inches and
- hen re:ur:ed :o 0.
This possibly resul:ed fro: malfunc:1o:ing of valves required for this particular flev path. The 3 ge ers:o vas refilled through the e=ergency feedva:ar header at 1649 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.274445e-4 months <br />.
ES Channels 1 and 2 (High Pressure :jection) ::1pped en lov RCS pressure (if 00 psig) as required by Technical Specifica: ices.
A:carent Cause of Occurrence:
7:e IS ac:ua:ed en lov ICS pressure due :o inabill:y :o 21::21: ieedva:e fl:v :o :he 0"SG's sufficies: :o =si=tain adequa:e s:artup level.
!"ne feedva:e p qblems evidently resul:ed f::= imp;cper opera: ion of one or more Tecdva:c valves (FDW-46, -47)~1nvolvec in svi::hing f := nor= 1 ::
in :he T've rec :ders emergency fl:V pa:hs. Tne ini:iating even:, :he shor:
a
- ove
- .::d, was apparently an isola:ed failure.
Anal-s af Occurrence:
S.e heal:h and saie:7 of : e general public vere not adverse ; _.fec:ed as a resui: :f :his :c:urrence.
3c:h :ne 1?S and IS sys:e:s fune:i:ced
- s required.
THIS DOCUMENT CONTAINS POOR QUAUTY PAGES n05110@
<\\
t
..hs S t ?t.%.
Q< < a '?.".%v nu...p *%t* 3*
- ?
a Wb
.w n
win r
6 i
V,,.n.f LE w.t e &
4 wwk C..,.i C: ree:1ve ic:1:ns:
The ;c.er :::ds tha: su: ply :he Tave rece:ders en Cai:s 2 and 3 hase
. been inspected and f:und :o be in acceptacle endi:icn.
The petan:ially =alfunc:icning valves, 70'a*-4 7, -43 vill be :hcrcu;hl -
checked during a la:e: cutage. Further review of :he i= pact of :ha
- ansien: en :he OTSG's is also bei g perfor:ed.
O
-