Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212J272 | 1 October 1999 | Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements | Safe Shutdown Anticipated operational occurrence Offsite Circuit |
ML20210G297 | 29 July 1999 | Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys | |
ML20203C593 | 5 February 1999 | Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes | Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Scram Discharge Volume Overtravel |
ML20199J908 | 21 January 1999 | Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors | |
ML20197H517 | 4 December 1998 | Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 | Reactor Vessel Water Level Minimum Critical Power Ratio |
ML20236U255 | 22 July 1998 | Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors | |
ML20197K186 | 18 December 1997 | Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect | Safe Shutdown Fire Protection Program |
ML20211J186 | 1 October 1997 | Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders | |
ML20211A230 | 19 September 1997 | Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR | Reactor Vessel Water Level Minimum Critical Power Ratio |
ML20210J049 | 8 August 1997 | Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% | Shutdown Margin Reactor Vessel Water Level Hydrostatic Scram Discharge Volume Feedwater Controller Failure |
ML20141B856 | 9 May 1997 | Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys | Fuel cladding |
ML20141B759 | 9 May 1997 | Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio |
HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits | 29 April 1997 | Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits | Hydrostatic |
ML20133F364 | 7 January 1997 | Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done | Stroke time |
ML20132G226 | 17 December 1996 | Proposed Tech Specs Re pressure-temp Limits | Hydrostatic |
ML20132E016 | 13 December 1996 | Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan | Safe Shutdown Fire Protection Program |
ML20135D488 | 3 December 1996 | Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 | Reactor Vessel Water Level Minimum Critical Power Ratio |
ML20129H918 | 29 October 1996 | Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware | |
ML20128M870 | 7 October 1996 | Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable | Stroke time |
ML20113F554 | 19 September 1996 | Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves | Unanalyzed Condition Shutdown Margin Anticipated operational occurrence Hydrostatic Fuel cladding |
ML20117M225 | 11 September 1996 | Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant | Safe Shutdown Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Fire Protection Program |
ML20115J486 | 16 July 1996 | Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Squib Qualified Offsite Circuit Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Overtravel Power Operated Valves Fuel cladding Offsite Circuit Coast down |
ML20117H139 | 21 May 1996 | Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet | |
ML20100H743 | 21 February 1996 | Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F | |
ML20094K383 | 10 November 1995 | Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B | High Radiation Area Squib Pressure Boundary Leakage |
ML20085K401 | 20 June 1995 | Proposed Tech Specs for Power Uprate | Shutdown Margin Reactor Vessel Water Level Hydrostatic Fuel cladding |
ML20085A166 | 6 June 1995 | Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria | |
ML20082V379 | 4 May 1995 | Proposed Tech Specs,Minimizing Thermal Stratification Events | Reactor Vessel Water Level Hydrostatic |
ML20082L333 | 14 April 1995 | Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS | Reactor Vessel Water Level |
ML20081F347 | 14 March 1995 | Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor | Hydrostatic |
ML20077S033 | 13 January 1995 | Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt | Shutdown Margin Reactor Vessel Water Level Hydrostatic Fuel cladding |
ML20077D892 | 2 December 1994 | Proposed Deleted ETS | |
ML20078G716 | 1 November 1994 | Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 | |
ML20076L691 | 19 October 1994 | Proposed Improved Tech Specs,Rev F | Time of Discovery Reactor Vessel Water Level Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fire Protection Program |
ML20149G375 | 13 October 1994 | Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained | Reactor Vessel Water Level |
ML20073G963 | 23 September 1994 | Proposed Improved Ts,Rev E | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Hydrostatic Hardened vent Fuel cladding |
ML20073D323 | 20 September 1994 | Proposed Tech Specs Change to Unit 1 TSs Re EDG Operability Requirements During Reactor Shut Down Conditions | |
ML20072V364 | 31 August 1994 | Proposed Tech Specs Re Improved Standard Ts,Rev D | |
ML20072H057 | 16 August 1994 | Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys | |
ML20072E402 | 8 August 1994 | Proposed Tech Specs Re Rev Insertion Instructions Rev C | |
ML20072B754 | 4 August 1994 | Proposed Tech Specs Re Traversing Incore Probe Operability Requirements | |
ML20071H838 | 19 July 1994 | Proposed TS 3.3.6.6,allowing Less than Four Traversing in- Core Probe Machines to Be Operable | |
ML20071H685 | 8 July 1994 | Proposed Tech Specs Re Improved Std Insertion Instructions, Consistent w/NUREG-1433 | |
ML20069J310 | 7 June 1994 | Proposed Tech Specs Allowing Planned Testing at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt | |
ML20059E923 | 6 January 1994 | Revised Proposed TS Pages for Increase in Allowable MSIV Leakage Rate & Deletion of MSIV Leakage Control Sys | |
ML20059L205 | 9 November 1993 | Proposed Tech Specs Changing Unit 1,Section 4.9 & Unit 2, Section 4.8 Re Diesel Generator Testing Under Hot Initial Conditions | Safe Shutdown |
ML20058P888 | 19 October 1993 | Proposed Tech Specs Re Time Delay for RPS Electric Power Monitoring Sys Trips | |
ML20046B606 | 30 July 1993 | Proposed Tech Specs for Implementation of New 10CFR20 Requirements | High Radiation Area |
ML20046B556 | 27 July 1993 | Proposed Tech Specs Showing Original & Unrelated Changes Re Removal of Main Steam Line Radiation Monitor Trips | Shutdown Margin Reactor Vessel Water Level Hydrostatic |
ML20045E728 | 28 June 1993 | Proposed TS 3.7.A.4 & 3.6.4.1 for Units 1 & 2,respectively, Allowing One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing |