Provides Status & Completion Plans for Four Modules Re Engineering Functional Evaluation (Efe).Util Emphasizing Efforts to Complete EFE Prior to Fuel Load W/Exception of Implementation Evaluation Portion of Module 4
ML19327B720
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/27/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89768, NUDOCS 8911070254
Download: ML19327B720 (2)


Text

_ . . . - , . - -

[ ( ,

,uyg _ ., 4 y

1.;4 ...?a. ^; ,

f I A [sj h P duJ f4 1

},'

I

. [ M 1

~

Log # TXX-89768' '

h ' '

1 -

File # 10010 (

- C C 10068

{

v w '

nlELECTRIC' t~

October 27. 1989 I. ,

' Waamsm J. Cabal, Jr.

.; ;y butive Ykr besMent

(

L s

U S.- Nuclear Regulatory Commission D. Attn:! Document Control Desk

, Washington. D. C. 20555 2

SUBJECT:

- COMANCHE PEAK. STEAM' ELECTRIC STATION (CPSES)

g. DOCKET NOS. 50 445 AND 50-446 ENGINEERING FUNCTIONAL EVALUATION ST ATUS AND ,i COMPLETION PLANS I REF: TV' Electric letter (TXX-88591). " Engineering Functional Evaluation."

g' '

from Mr.lW. G. Counsil to USNRC, dated September 14. 1988 L e L -Gentlemen: -l In the;1etter referenced above TU Electric described its plans for completion of the Engineering Functional Evaluation (EFE). Since September 1988

,TU' Electric.has made substantial progress toward completion of the EFE. The

. purpose of this letter is to. inform the NRC of the EFE status and plans for completing.the CFE.~

13

  1. A s previously described to the NRC, the Engineering Functional Evaluation  !

(EFE):is comprised'of.four modules for'the purpose of assessing-(1) design

. completion activities:-(2) design data' utilization.in testing: (3) design data 7

. utilization'in maintenance and operations: and'(.4)' operating plant design i control. The status and completion plans for these four modules are as ,

follows: >

f J , Module 1 i

, t The assessment.is complete. Action to resolve review items has been completed'and all items are closed.  !

,,4 Modules 2 and 3 The OA Department has completed all of the assessments in the Modules 2

. < .and 3 review plans. There are 22 open items at this time. Present '

jfS.,

^

schedules provide for the completion of action on and closure of these ,

items prior to fuel load.  ;

t ; ..s o l' r L

lhj Ho 8911070254 891027 L

ll, 1 PDR F

ADDCK 05000445 PNV

/j6 r L' I O

s P. O. Box 1002 Olen Rose, Texas 76o43-1002 '

L

Qyy'_^

o 1 .v.

dy , ; W .

^

e i

> mp

.TXX-89768 '

Page 2 of'2

Podule 4

- Module 4 consists of two portions: a review of the program for operating s plant design control, and an evaluation of the implementation of that-program. l The review portion has been completed by Engineering with the exception of

~

l the finalization of the evaluations and the completion of any resulting

, procedure changes. Increased resources have been dedicated to these-H9dule 4 efforts with the objective of completing-them prior to fuel load, y7 The implementation evaluation portion of Module 4-will be accomplished by ,

a QA Department audit of. the implementation of the operations design l contro1' process wh(ch was the subject of the review portion of Module 4.

To. accompli:h thi EFE objective for this effort, this audit must be ,

scheduled cons 1.ta.nt with the performance of design activities during l plant operations, including the development of operating plant design i modifications. Therefore, this audit will not be conducted until such l time after fuel load that sufficient design products (i.e., design modifications),are available to enable an assessment of the effectiveness .;

of-the implementation of the operations design control process.

'In summary,'TU Electric is emphasizing efforts to complete the EFE prior to 4

, fuel load with the exception of the implementation evaluation. portion of' -

Module 4. However,-if it becomes necessary or advisable to delay completion .

of any other.EFE items until after'the fuel load date, the revised completion

. dates for any such items will be justified. The justification will include an evaluation demonstrating that the items can be delayed with no impact on the safe and reliable operation of Unit 1. Any items delayed will be completed prior to the operational mode for which they are needed. Any items delayed 5 will be processed in accordance with CPSES procedure (s) relating to open item evaluation and the deferral process. The justification for any delayed items f will be' documented and available for NRC review.

, .For any additional information concerning the status and plans for completing the EFE, please contact J. F. Streeter at (817) 897-6029.

Sincerely, s

William J. Cahill, Jr.

DAR/vid c - Mr. R. D. Martin, Region IV Resident Inspectors. CPSES (3) ,

I r e , , - , - , - , - , - . - - - - - , . . , . , - - - . . - - - - - - - - - - ~ - - - - - - - - - - - - - - , - e,-- - - -,