Text

-

n 1. . .

l M Lop # TXX 89753

1lll 'l :::

Fi.e # 10010

913.1 i y Ref. # 10CFR50.55(e) l BilELECTRIC i October 26, 1989-l W.J.CahW Lsersane Vue hwdent U. S. Nuclear Regulatory Commission  !

e Attn: Document Control Desk l Washington, D. C. 20555 l

SUBJECT:

COMANCHF. PEAK STEAN ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50 446 RESPONSE TO INFORMAL NRC QUESTIONS REGARDING l CPSES ORGANIZATION .j Gentlemen:  :

During a conversation with the NRC, the following NRC concer:is were raised by  ;

the reviewer. j More information is needed regarding the 6 months hot operations experience for at least one SRO per shift. Specifically requested were i

the dates and plants for this experience. Attachment 1 lists eight (8) '

SRO licensed individuals with the experience data requested.

l More information is needed regarding projected staffing levels for Unit 1 l l operation. Current projections of Unit I staffing are illustrated in i Attachment 2. This staffing plan is an estimate and is subject to  ;

revision, as necessary, after CPSES begins operating.  ;

The third concern pertained to the Independent Safety Engineering Group  !

(ISEG) and a request by the reviewer to make the FSAR consistent with the  ;

Technical S>ecifications. A future FSAR change, as shown in Attachment 3,  :

has be6n su)mitted, j TV Electric feels this information satisfies the reviewer's concerns. .

~

However, if there are additional questions, contact Mr. Greg Bell at j 214 812 4373. j Sincerely,

%(

r91102000s e91026 ft '

ADOCK o 5

  • gDR l William J. Cahill, Jr. .

GLB/smp  ;

Attachments (3) @ j c - Mr. R. D. Martin, Region IV '

Ms. M. Malloy, NRR-OSP Resident inspectors, CPSES (3) emns otue street La 81 oatias,1exas 13201 l

~

i 4 Attachment 1 to TXX 89753

+ - .* l Pa9e 1 of 1 i CPSES SUPERVISORS ADIADIns six n0 mins NOT PARTICIPATIDu EXPERIENCE l i

i Daskam. Thomas J. 03 15 85 to 04 12 85 Salem )

, Shift Supervisor 04 29 85 to 11 21 85 Diablo Canyon '

07 06 88 to 07 15 88 Rancho Seco )

10 09 89 to 10 14 89 Diablo Canyon Deen, Michael D. 01 01 82 to 01 15 82 D. C. Cook l Shift Supervisor 03 16 84 to 04 13 84 Trojan  :

03 25 85 to 04 11 85 North Anna l 07 30 85 to 08 02 85 Prairie Island l 04-23 86 to 05 08 86 Prairie Island 06 02 86 to 09 12 86 Prairie Island 1 04 06 87 to 04 09 87 Frairie Island  ;

Mr. Deen is presently assigned to other duties to support plant startup NOTE:

but will be utilized as needed for licensed operator activities.

l Harvey, Scotty E. 06 04 84 to 06-15 84 B2 aver Valley Shift Supervisor 03-04 85 to 03 15 86 McGuire 03-10 86 to 03 28 86 Diablo Canyon j 04-21 86 to 05 09 86 Salen '

l 05 28 86 to 11-21-86 St. Lucie {

05-27 87 to 06 12 87 Catawba 1 08 ?5 87 to 09 05 87 McGuire Apple, Kenneth C. 07 22%i to 07 26 85 Diablo Canyon Unit Supervisor 01-06 *% to 11 !1 86 Byron 06 01 87 to 06 25 87 Diablo Canyon l J

Broughton, Travis W. 03 04 86 to 03 22-85 McGuire  ;

Unit Supervisor 04 12 8h to 05 03 85 San Onofre j 04 2186 to 11 21-6ti St. Lucie l l

Bryan, Gregory C. 11 04 85 to 11 15 85 Calloway l Unit Supervisor 07 29 86 to 09 12 86 San Onofre l 11 04 86 to 08 28 87 Ark Nuclear One j J

Burnett, Stanley P. 06 05 84 to 07 02 84 $urry i Unit Supervisor 02 27 89 to 03 10 89 Byron ]

,- 1 NOTE: Mr. Burnett was previously licensed (SRO) at Wolf Creek. )

1 Eggemeyer, Nick C. 12-02 85 to 12-13 85 Catawba j Unit Supervisor 08 10 87 to 08 29 87 Diablo Canyon j 07 05 88 to 07-15 88 Ark. Nuclear One  !

01 23-89 to 02 01 89 St. Lucie NOTE: Mr. Eggemeyer was previously licensed (RO) at Arkansas Nuclear One.

1

! l l-

--g o .,

. h.

.,~

At* 2 to TEI-09753

  • ege 1 of 1 . .

Techmimi h enl/ stmeisties IA __ isties a Sommert Operettoes W N Ig*eetion omat 31 section W r- 1 sectice r-- 1 secties semanger- 1 see* Joe ^^ , 1 section T , _ 1 seetiae gene gme-1 1

Managere- 2 -

,---2 -

,_ _ - supervisere- Ameistemt sett supervisere 1 thnit- 5 1 thnit- 11 2 thnit- S 2 h it- 13 Supervisore- shift Supervisere- Aseistant - ,; 2 a=1==ce of C/R SW Salamme of IC 1 thnit oper.- 10 1 trait- 6 P. - 1 thnit Seessummai 2 thmit oper.- le 2 Unit- 6 1 thnit- 23 2 theit- 4 1 tanit. 70 2 tknit- 32 2 trait- 90 n.1 - of Tech.- Other Supervisore- Elee. W staffing Sotimmtee- 3EP Staff peroaa.ml- Steffing SetAnstee-

, support Peroommel 1 thnit- 4 1 thnit- 6 1 tpait- 29 1 th-it- 4 1 tihit- 93 1 thmit- 55 2 thnit- 4 2 thsit- 6 2 thnit- M 2 thef t- 4 2 thnit- 103 2 thait- 55 Staffing estimates- thnit S W sers h i - of Elec, Delance of DF 1 thnit eportti<e- 68 1 tMt- 12 h1 peroemen1 2 Unit operation- 68 2 Unit- 18 1 trait- 74 1 thnAt- 37 2 thnit- 74 2 1pait- 67 stK operation geset==4m1 segervisere staffing Estisetme-1 trait- 12 1 trait- 6 1 tpeit- 47 2 tpmit- 24 2 1pait- 6 2 tpmit- 77 Auz. Operation Salence of seeds.

1 tpnit- 30 F-- 1 2 theit- 40 1 tV.t 99 2 Uun ;- 99 Pereousnel (sTR, etc.) 1 trait W 190 1 Unit .2 1 thiit eyeesti - 190 2 tpmit- 22 Staffing Estimatee 1 Unit- 89 2 tpmit-137 f

i i

I

Page 1 of 1 N

CPSES/FSAR f L

13.4.2.1 Independent Safety Engineerino Group (ISEG) 15 I

" The Independent Safety :ineering Group is the organization whose 15 t function is to perform i.m..endent reviews of plant operations. It 76 j consists of a group of onsite engineers who re, ort to the Director, f Technical Interface. This group will have experience and training in '

nuclear power plant operations and engineering. ,

g.y g 9 j

The ISEG will examine plant design and operating experienGNuclear Emene.Mn3

^

f  !

15  !

information for the iiaprovement of plant safety.[The ISEG will review plant activities 4and make recomendations to r;: ::: on ways to j improve the overall quality and safety of operations. The ISEG will  ;

also review matters referred to them by +he Operations keview n' Comittee or the Station Operations Review Comittee and present their f findings to these committees. The ISEG will be fully implemented 90 I days prior to Unit 1 fuel load. e.g., revised precedures,

e. vipment, rnedelet.ahens ahel .

13.4.2.2 Operations Review Comittee ( m ainian ant.t # 37 .

ac+iv'i +(es '> /

The Operations Review Comittee will function as an independent bcdy 37

, ass 191.ed primary responsibility for review of designated safety-  :

related station matters in the areas listed in Section 13.4.2.2.2. l It will report its findings (10 recommendations to the Executive Vice 65  !

I

President, Nuclear Engineering and Operations.

13.4.2.2.1 Operations Review Comittee Memben, hip 55 The Operations Review Comittee shall be composed of at least six (6), 74 of whom no more than a minority are members having line responsibility for operations at CPSES. Chairman, members, and alternate members will be appointed by the Executive Vice President, Nuclear E:#gineering and Operations who will designate a member to serve as the chairman.

In the regular members' absence, alternate members may act with the 46 full authority of regular members. Alternate members must be designated in advance of their participation and shall be restric.ted 37 to legitimate absences of regular members.

13.4-5 Amendment 76 ,

May 1, 1989 *