ML19309H450

From kanterella
Jump to navigation Jump to search
Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501
ML19309H450
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/02/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-3131, NUDOCS 8005130296
Download: ML19309H450 (1)


Text

8005130,216 TEXAS UTILITIES GENERATING COMPANY 2tM)I DHY %N TOWER = DALLA!L TEXAS 76203 a can, May 2, 1980

"."l'!:.!!,';;"32' TXX-3131 Mr. W. C. Seidle, Chief Reactor Construction & Enginccring I

Support Branch -

U. S. Nuclear Regulatory Cce'ission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 100 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK ST5Af1 ELECTRIC STATION

. 1981-83 2300 MW INSTALLATION CONTROL BOARD WELDED CONNECTIONS FILE N0: 10110

Dear Mr. Seidle:

This letter supplements our report (TXX-311d) dated March 21, 1980, concerning welded connections of the control boards.

We stated in the report that rework would be completed by May 1, 1980.

, . It is anticipated, however, that this work will be completed July 1, 1980. -

1 Very truly yours, R. J. Gary RJG:df

{ cc: NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1

t

__