ML19309F131

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
ML19309F131
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/18/1980
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309F132 List:
References
MP-2-4364, NUDOCS 8004280525
Download: ML19309F131 (1)


Text

o .

NOI?THlinST 13TII.ITHIS

}

[Z'2',['C'.7 P.O. BOX 270 h ,nunumw siinnece cco, , HARTFORD. CONNECTICUT 06101

- uor wie .irec*=v (203) 666-6911 k L IJ :=:%'==.'C7 April 18,1980 HP-2-4364 Mr. Boyce H. Grier Director, Region 1 Office of Inspection and Enforcement U. S. iluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. DPR-65 Docket tio. 50-336 Reportable Occurrence R0-50-336/80-13/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-13/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix  :

A Technical Specifications, Section 6.9.1.9.b, conditions leading I to operation in a degreded mode permitted by a limiting condition '

for operation. An additional three copies of the report are enclosed.

Yours truly,  ;

NORTHEAST flUCLEAR ENERGY COMPANY

.tdh[

01n F. Opeka  ;

Station Superintendent l

Millstone fluclear Power Station 1 ECF/ RUB:lls

Attachment:

LER 80-13/3L-0 cc: Director, Office of Inspection and Enforcement, Washington,

'D.C. (30)

Director, Office of Management Infomation and Program Control, l Washington, D.C. (3) -

1

$ S004280