Notification of Continuation of Investigation on Installation of Pipe Elbows Connecting Steam Generators to cross-over Leg Piping.Condition Considered Potentially Reportable Under 10CFR50.55(e)
ML19274E882
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/13/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
TXX-2955, NUDOCS 7904280224
Download: ML19274E882 (1)


Text

-

  • f0/E TEN AS lTil.lTIES GENERATING CO.Til'ANY

..<,.nn,n o i.m.n-i,ui m ii u..t.,n February 13, 1979 n,- TXX-2955 fir. W. C. Seidle, Chief Reactor Construction & Engirteering Support 3 ranch U. 5. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Rycn Plaza Dr. , Suite 1000 Docket Nos. 50-445 Arlington, Texas 76011 50-446 COMAtlCHE PEAK STEAli LLECTRIC STATI0i; 1931-03 2300 liW Ifl$ fALLATION IriSTALLATION OF PIPE El.PO'.IS II;

~

STEAM GENERATORS LOOP PIPIf!G IllTERIM RESPONSE FILE NO. 10110

Dear fir. Seidle:

On January 17, 1979, we verbally informed your Mr. R. G. Taylor, CPSES Resident Inspector, of a deficiency in regard to installation of pipe elbows connecting the stean generators to the cross-over leg piping. We considered this " pot.entially" reportable under 10 CFR 50.55(c).

We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.

Very truly yours, s

<< N/

R. J. Gary RJG:dla cc: flRC Region IV - (0 1 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. fluclear Regulatory Commission llashingtori, D. C. 20555 7 904 280 2ZT

&