ML19242A643

From kanterella
Jump to navigation Jump to search
Forwards LER 79-019/03L-0
ML19242A643
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/27/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19242A644 List:
References
MP-2-4098, NUDOCS 7908030299
Download: ML19242A643 (1)


Text

e.

CGCR T}3]33M37 U3733.TI03333

-T IAI?58fcomccTicut ouvi l' >

(m us on s 'l . .

'  : , ,, :.. ' l' July 27,1979  ;,

t'P-2-4093 fir. Boyce 11. Grier Director, Region 1 Of ficc of Inspection and Enforcement U.S. fluclear Regulatory Conoission 631 Park Avenue King of Prussia, Pennsylvania f9406

Reference:

Facility Operating License tlo. DPR-65 Docket !!o. 50-336 Reportable Occurrence R0-50-336/79-19/3L

Dear Mr. Grier:

This letter fontards Licensee Event Re? ort 79-19/3L required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation.

An additional three copies of the report are enclosed.

Yours truly, 4/ .4 W J.F. Opeka O Station Sulerintendent Millstone t!uclear Power Station JFC/RNR/kat

Attachment:

LER 79-19/3L Director, Office of Inspection and Enforcement, Washington, D.C. (30) cc:

Director, Office of Iianagement Information and Program Control, Washington D.C. (3) 790803099t -m l;. ,a . cou