MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
AEC Dl nl "UTlQ'! FOR P LRT'50 DOC!'ET . ~TI:.RIAL
'(TEi;iPQRP,RY FORi-.'I) ..
'ONTROL NO:
Ff LE: MONTHLY REPORT FILE FRO;I. Florida Power & Light Co. DAT= Or= DOC DATE REC'D LTR TX 0TH=-R Mlani, Fla A.D. Schn'.id t TO: ORlG CC OTHcR SENT AEC POR xx Office of Management Info 1-signed SENT LOCAL PDR CLASS UNCLASS PROP INFO tiNPUT NO CYS REC'0 DOCK=T i~'0'0-250 xxxx an 251 DESCRIPTION!: ENCLOSUR""S:
Ltr trans the following: Monthly Report for March 197 Plant & Component Operability & Availability This Report to be used in preparing Grey Book by Plans & Op(Trations.
No. of Cys Rec'd PLANT i%AMP:
PQ FOQ s.C iQN lie le Qs>s
~
YP iQEs 4-8-85 JGB BUTLER (S) . SCHIKNCER (S) ZIEIfANN (S) REGAN (E)
W/ Copies W/ Copies W/ Copies +N Copies CLARK (b) STOL@ (S) DLCriE R (E) Qhf APi '(S)
W/ Copies W7 Copies W/ Copies 'W/ Copies PARR (S) VASSALLO (S) KNIGHTON (E)
(
+8 ~ MAGEE W/ Copies W/ Copies W/ Copies W/ 2 Copies KNIEL (S) PURPLE (S) YOUNGBLOOD (E)
W/ Co ies W/ Copies W/ Co ies INTER .'AL DiSTcil":)UTlON TECH REVIEW DENTON LXC ASST A/T IND AEC PDR SCHROEDER GRIlZS DIGGS (S) BRAITIfAN OGCN ROOM P>>506"A HACCARRY GAHHILL GEARIN (S) S ALT ZH 'Bl HUNTZING/STAFF KNXGHT KASTNER GOULBOURNE (S) B ~ HURT CASE PAWLICKI BALLARD KREUTZER (E)
GXAHBUSSO SHAO LEE (S) 'PANGLER LANS BOYD STELLO HAIGRET (S) i'fCDOilALD MOORE (S) (BWR) HOUSTON ENVIRO REED (E) tkHAPHANi DEYOUNG (S) (PIER) NOVAK MlLLER SERVICE (S) DUBE w/input
'SKOVHOLT (S) ROSS DICKER SHEPPARD (S) E. COUPE GOLLER- {S) IPPOLITO KNXGHTON SLATER (E)
P. COLLINS TEDESCO YODNGEICOD SMITH (S) D. THOMPSON (2)
DENISE REG OPR LONG REGRN ~ETS (S) KLECKER LAXNESS PROJECT LDR NILLIAllS (E) E ISENHUT FILE & REGION {2) BENAROXA WILSON (S T R'ILSON ST~ VOLXIfER HARLESS INGRAIf (S)
EXT E riN4 L Dl S R l c. J i IQi!
-LOCAL PDR Homestead, Fla (1) (2) (10) -NATIONAL LABS 1-PDR SAN/LA/NY 4-TIC (ABERNATHY) 1 W. PENNXNGTON, RH-E-201G,T. 1 BROOIQIZ'VEN NAT LA t i-NSXC(BUCHANAN) 1-CONSULTANJTS 1-G,ULRIKSON,OR!Y'L 1-ASLB
'-'. l-iYEVJ.ON ANDERSON NEWHARK/BLUIIE/AGBABXAN 1 AGIIED RUTH GUSS".-'.
ROOH B" 127 G,T.
';16 ACRS HOLDING 1 J RUNKLES RH-E>>2 G T.
I'.O. 8OX 3I00 h(IAhII, FLORIDA 3310 I
~p
@~~~~ I @II!/(@,
4~
~ )0 xiii FLORIDA FOViEII 6 LIGHT CQ;.!I'AIR'pril 4, 1975 I>iwv)t';; ~VII> Qj.
~yg Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the March, 1975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours, A D. chmidt ic resident Pow Resources VTC/cpc (
Attachments ~ lf cc: Mr. Norman C. Moseley Jack R. Newman, Esquire 3I'7J
ENCLOSURE A DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT NO-DATE APRIL 2, 1975 COi~1PLETED BY V. T. CHILSON THLEPI10iNH NO. 305 445-6211 Ext. 2177 DAILY UNIT POb7R OUTPUT wi ~
hDVlll March, 1975 AVERAGE DAILY i~6'e-net DAY AVERAGE DAILY Y~fc.-net 534 20 694 2 253 692 193 686 23
... 6 25' 676 26 700
'8 27 683 9 494 28 689 10 697 " '694 696 30 682 12'3 691 31 '.'268 693 14 691 I 693 NOTE: Daily average pore." level 15 greater than 666 lli.'e, due 679 to cooler condenser cool-
'Nater ~
682 18 683 i
19 ~
690
ENCLOSURE A DOCKET NO. 50-251 TURKEY POINT UNIT NO 4 DATE APRIL '2, 1975 COhfPLETED BY V. T. CHILSON 0;LEPHQ'K NO 05 445-6211 Ext. 2l77 DAILY UNIT P04'ER OUTPUT hGVIH March 197 5 IlRY AVER%9! DAILY hjA'e-net DAY AVEBA(Z DAILY hS'e-net 1 683 643
'2 681 556 "681 22 660 4 683, 651 685. 23.'S'6, 6 6'83 '598 678 645..
.7"'9 676 27 651'57 677 28 10 678 676 30 t
674 ~ q 657 675 NOTE: Daily average power 'level 15 672 greater than 666 M1'., due to cooler 'condenser cool-
'ater.
~
16 661 665 18 '59 19 662
rrO()(uA. &4v ~
I J!( I'I'(:~V~IE TURKEY POXNT (Jt%5 NO. 3 REPORT NTH YiARCH, 1975
~ r
) (l! 37!IPRJT 2 T Q 7~
C(.).':I'J.l:-I I!.> I,'i V. T. CJJX J~SOid TL'I EPJ IONL' i 305 445-6211 Crt. 2177 OPERATING STA'TUS REPOI<'I'Ii(C'I!RIOD: 0001~ 75, 03, '1 TIIROUCII 2400 74 03, 31 GROSS IIOURS Ii(I REI'OJ('l'LNG I'L'Ri()f): . ~ 744.0
. 2~ CUIRENTJ.Y AU'I1 JORTZJ!D P01'ff',R, J.JSVEJ. Pillii't:) 2200 MAX. BEPJ;ND. GPACITY (bid!te NL'T) 666
- 3. POt'I!EI< I.DtEL TO b'HICII RESTRICfED (IF AI(Y): (ii Jti'e NL"l') None
- 4. REASOiS FOJ~ RES+ZCrIOhJS (IF m):
4
'JURIS CUMIN'I'I'.T hGVI1 I YR-TO-DATE TO D.lVI'll 5: MMJ:.R OF FIOURS 'IHE REACTOR tl'AS I3 T'PT P'A I CRI 4 IG"~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 619.4 1 412.0 14 439.7
- 6. REACIQR RFSERVE SIJIJfDONN I.JOURS ........ 7. FIOUIG GENERA'fOR ON LINE ..........,,.... 607.4 2 016.6 15 434.9 8." UNIT RESERVE SIJIJfDOt'IM IJOURS .......;... 85.0 9.:GROSS 'llJEBh~JLL ENERGY GBJERATED PiJIG i)....
4 1 245 352 4 240 473 26 920 497
- 10. GROSS ELECI'RICAL BiKRGY,GEIIEMTD (h IMJ) 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 408 186 1 390 789 8 818 594 11 ~ I(c 1 LI EQUI(IVY EI(ERG I GB(ERI(7iiv (Ihiill'I), 8 304 375
- 12. RLACJ'OR AVAILABILITYFACl'OR Ql 83.3 94.3. 78.9
- 13. UNIT AVA4IIABILITYFACTOR g2
- 81. 6 93. 4 75.8
- 14. UNIT CAPACITY FACJQR g3,....., ..;;..... 78.1 92. 0 61. 3
- 15. UNIT FORCED OUTAGE RAfE j4I
'18. 4 6.6
- 16. SfIUTDotiNS Scf KDULED OVLR4 MVT. 6 hfOVrfJS (O'PE, DA'"E AND DURA'rION OF EACFJ):
June 21 . 26, 1975 Seismic Restraint Inspection. 4
~ .
- 17. IF SIJUTDOWf A'f END Ol'u!POR'f PERIOD, ESTI'IATL'D DATE OF STAI<'IUP:
HOURS IU'ACTOR 14AS CRITICAL X I.00 RRACTOR A4AILABILIIY I'ACI'OR = CROSS [~gg~,5, q l0 4>I8g I 4g. PI4<IOU
'~" " TY " = IIOURS Gf!M;JKfOR ON G!~OSS II'.)IJ.;S >,i:.I:n)I,'I' LRIOD LINE X 100
' Nl!'I':,I,u,"I'I,'tCWJ, I'0;;ill,'if!(il',fQ'I'! ll) )I', 10()
Ui 41T CAI ACI IY I ACJQR 'y i if jr
. IJOURS iN JxEI OR'I' i!RIOD I'Ol,'Cl'lf) OII'l'AGI! ff()IJHS X l00 llOL)I(lT'liYlil&'IOR().'(I f,i '!i <
q
~
FOflCI I) OU'I'AGI IIQURS 4 t 4 l.
4
' %r ~
4 4
C 4
4
1 II I
S ~".1.'t'RY: Unit No. 3 was returned to service March 9, 1975, DOCKET NO. 50-250 following completion of repairs to the turbine control valves. Performance of the unit was R'IT M'E TURKEY POINT UNIT NO. 3 satisfactory until March 30, 1975, when the valve operator failed on No. 3C steam genera"or feed- DATE water control valve.
PREPAID BY V. T. CHILSOx 1 '":ASON: .TELEPHONE . 805 ) 445-6211 Ext. 2177
-'; -EQUIPNEXT FAILURE(EXPLAIN) F-ADiiINISTRATIVE
- i. -.%AINT. OR TEST G-OPERATIONAL ERROR *+METHOD:
C -REFUELING H-OTHER(EXPLAIN) " REPORT EON%i MARCH, 1975 1-MANUAL 1'-REGULATORY RESTRICTION 2-:ANNUAL SCRAM .
r.-OPERATOR TRAINING AND 3.-AUTO~iATIC SCRAM LICENSE EXVCINATION ~ U N IT S ii U T D;1 N N S /REDUCTI0NS
'i PE i>L":i'HOD OF F-FORCED DURATION SEJITIgvG DO D".TE S-SCHEDULED 0-:OURS) REDOX
- THE REACTOR *" CO~P ANTS 07 75 03 01 5.5 3 Unit was tripped by loss of generator field, caused by failure o components in the generator voltage regulator power supply system.,
(Non-nuclear S stem) 08 75 03 02 N'/A Load on the unit was reduced below 50% R.P. and maintained below 50% R.P. until the accumulated time, outside the target band was reduced to less than one hour in the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.
Refer to Abnormal Occurrence 250-75-,1.'Nuclear'S stem) 09 75 03 02 3.3 Reactor was tripped by two-out-of-three channels, Overpower AT. -*
Reactor protection system, power range, high neutron level trip setpoints were being reduced from 108-o R.P. to 55% R,P. Channel N-42 Overpower AT comparator failed to reset when the bistable switch was returned to normal position. Reactor tripped when Channel N-43 Overpower AT comparator was .placed in the tripped mode. (Nuclear S stem) 10 75 03 03 127. 8 Unit was removed from service (deliberate manual'shutdown) to re-air turbine control valves. (Non-nuclear S stem) ll 75 03 30 N/A Load on the unit. was reduced to 130 MWe (24% R-P,) when valve operator on No. 3C steam generator feedwater contzol valve-failed. 'Non-nuclear s stem)
ip;I f !i:)j.'i!E TURKEY POINT UNI . 4 REPORT I H l1ARCH, 197S e II ~
~ I >Pr IL 2 '975,...,.. ..
(,0~1('Lli'I'I:!) L'Y V. T,,CFFILSON TEILLII)f IoyL'd5'44S-62ll .
Ext. 2177 OP ERAT I NG STATUS
- 1. REPORTING PERIOD: 0001. 75 o3 '11IROUGfl 2400, 75, 03 GROSS I IOURS IN RIIVOI('I'lii7i IIJ!IilOU: 744: 00
- 2. CURRL'NTI.Y AUTIIORTZED PofER J,EVEI, (hff)'t) 2200 MAX. DI!PM). CAPACI'IY (hflfe i%:"I') 666
- 3. FQi'lTR LEVEL TO BIIICH RESTRICTED (IF ANY): (i8l'0 NEI) None
- 4. 'EASONS FOR RESTRICTIONS (IF ANY):
'ITIIS CUi~fUMTIVL'O hiohf'fFI YR-TO-DATE IDTI:
01'IOURS 'HK I%ACTOR IIIAS
- 5. hUYIBER CRITICAL e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 98 ' 2 035.7 ll 369.5
- 6. REACTOR RESERVE SIIUTD01Pif IIOURS ......; . 97.3 97.3
- 7. HOVRS CEihiERATOR ON LIAiF................. 695. 6 ~
2 013. 3 11 071.1 8.'. 'PifIT RESERVE SIIUTDOt8 FIOURS ........... 9. GROSS TFIEfb~iAL ENERGY GENERATED(hf!$ ).... '1 475 161 4 305 374 22 657 584:
- 10. GROSS ELECrRICAL ENERGY GENERATED (Min).................................. 472 292 1 395 378 7 169 639 ll. Iii:"1'L!."CiRlCVLi L2i~i:I~iiY yi:hf,"i&iru ti~ii'~rf) ..
~ ~ ~
J DAO OOP 0 793 ~89
- 12. REACTOR AVAILABILITYFACI'OR +1......... 93. 8 94.3 83. 0
- 13. UNIT AVAILABILITY1ACTOR g2 ............ 93. 5 93. 2 80. 8 UNIT CAPACITY FAcroR g3..........,..... 90.5 92.3
- 15. UNIT FORCED OIJI'AGE RATE "g4
- 16. SEJTDONNS SCflEDULED OVFR iNEXT 6 h!OVl1IS (TYPE, DA'"E A% DURATION OF EACFI):
March 30 May 25, 1975 Refueling, Maintenance, and Inspections.
- 17. IF SIIUTD018 AT 1N) OF REPOR'I; PERIOD, ESTIhfATED DATE 01 STARTUP: Ma 26 197S RF>rroR AVAILABILITYFAcroR =
1<Of.JI<S Gl<OSS FIOUIIS RI!AcrOR WAS CRTTICAI. X l.00 lib IIL'I'OI!TING PJ!R10D 2'IT AVAILABILITYI'ACTOR IIOURS GI!NEIRfoR ON I.INE X 100 GROSS IIUUI!.!1 CAI'AC!'I'Y X GfiOSS IlOURS JN "REPORT .I'I'l(IOD 4~ UNI'I OUIAGI: RAPE = -'---',';;--.--'.-
I'0176!":D Ot)'fAGI'. Iloflf)S IIUIJIS Gf!NlilbVIVll()iY, I,IN!i +
X
'1.00 OUTAGli I IOURS ':ORCEI)
'k DOCKET NO. 50-251 TURKEY POINT UNIT NO. 4 st::!ARY: Unit No. 4 was in continuous PgIT ygaI" as=vice from January 9, 1975 until 19~-
2-"- rch 29, '975, whon the unit was re- APP.IL 2 mo'e~ from service for refueling, V. T. CHILSON maintenance, and inspections. Perfory PREP"BED BY 305 445-6211 Ext 2177 mance of the unit has been satisfacto y TELEPHONE ex'.em~
March 24, 1975.
REPORT iONTH MARCH, 1975 U N IT S 11 U T D 0 W N S / R E D U C T I0 N S TYPE b4~IHOD OF F-FORCED S-SChcDULED DURATION (HOURS) REASY ~
SHUTTING Ioi&~I REACTOR CO~&KiXVS
- 03. I75 03 20 N/A Load'n the unit was reduced to approximately 50% R.P.'o perform periodic test on turbine main steam stop and control valves, re-heat interce t, and reheat sto valves. (Non-nuclear S stem) 04 I
i75 03 24 N/A Load on the unit was reduced to 275 Ewe .(50% R.P.) to repair con-l nser tube leak. (Non-nuclear S stem) 05 75 03 29 48.4 Unit was removed from service (deliberate manual shutdown) for
- r. fueling, maintenance and inspections. (Nuclear and Non-nuclear.
Svstems)
A-EQUIPiK4l'AILURE (EXP? in,Iig 1-5IAVDAL B-N.DiT. OR TEST I $ JAL ScRQf C-REFUELING 3 QFO~ATIC CR. ~I D-REGULATORY RESTRICTION E-OPERATOR RAINING M) .
LICEi&E EXki!IM'TION F-ADIIiGSTRATlVE
. G-OPERATIONS'RROR H-OTH R t'EXPLAIN).
.0
( I,P$,
"I