|
---|
Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
AEC DIST~i-UTIO.'!
T I O FORF R PART 50 DOC!;ET MATf:IilAL ~
ITEi.'iPORARY FORI'.I)
CONTROL NO:
FI LF MONTHLY REPORT FILE FROi]. Florida Pover & Light: Co. DATE Or" DOC DATE R EC'D LTR T'v')X RPT OTHER Miami, Fla 2-7-75 A.D'. Schmidt 2-10-75 XXX TO: ORIG CC OTHER SENT AEC PDR Office of Management Info 1-signed SENT LOCAL PDR CLASS Ui'!CLASS PROP INFO INPUT NO CYS RcC D DOCK"- T NO:
I XXXX 50-250 an 251
,DESCR IPTIO,i!: ENCLOSURES:
Ltr trans the following: Monthly Report for Januax 'I Plant & Component Operability & Avail."ability This Report to be used in prepaiing Grey Book by Plans & OptErations.
No. of Cys Rec'd
- 1 PLAiNT NAb1E'Turkey Poi~t g3
~ FOR ACTIO."./II'ir"OR.IATION "10" 75 JGB VUTLER (S) . SCHWENCER (S) ZIE?fAibN (S) REGAN (E)
W/ Copies W/ Copies W/ Copies N+/Copies Cf hkh. (b) rI:01.Z (SP DLI '~ft. (6 J ~AR (Sj W/ Copies WP Copies W/ Copies g/ t Copies PARR (S) VASSALLO (S) KNIGHTON (E) VD. THOMPSON W/ Copies W/ Copies W/ Copies W/ 2 Copies KNIEL (S) PURPLE (S) YOUNGBLOOD (E)
'~/ / opie W/. Co ies INTERNAL DISTiil..)UTIOs'I TECH REVIEW DENTON LIC ASST ~AT 'IND
~AEC PDR SCHROEDER GRIlEE DIGGS (S) BRAXTifAN OGC) ROOM P"506-A MACCARRY GAMMILL GEAi(IN (S) S ALTZ."fAN IIUNTZING/STAFF XGHT KASTNER GOULBOURKE (S) B ~ HURT CASE PAWLXCKI BALLARD KREUTZER (E)
GIAMBUSSO SHAO SPANGLER, LEF (S) LANS BOYD STELLO MAIGRET 'S) CDONALD MOORE (S) (BWR) HOUSTON ENVIRO REED (F) t@HAPKLi DEYOUNG (S) (PWR) NOVAK MILLER SERVXCE (S) DUBE v/input SKOVHOLT (S) ROSS DICKER. SHEPPARD (S) E ~ COUPE GOLLER.- (S) XPPOLITO KNIGHTON SLAT R (E)
P. COLLINS TEDESCO YOUNGBLOOD S H (S) D. THOMPSON (2)
DENXSE REG OPR LONG LAXNESS REGAN PROJECT LDR g ETS (S)
WILLIAMS (E)
KLECkVR EXSENIiUT FILE & REGION (2) BENAROYA WILSON (S)
T.R. WILSON ST~LE VOLIMER HARLESS INGRAM (S)
EXT RNAL ()ISTt. 'c.UTIOI
>>LOCAL PDR 'Homestead, Fla (2) (10) <<NATXONAL LABS
'1) 1"PDR SAN/L iNY (fan "TIC (ABERNAT'IY) 1-W, PENNXNGTON) RM-E<<201G. T ~ 1 "BROOKHAVEN NAT'A3 tA"N SIC (BUCHANAN) 1"CONSULTANTS 1"G.ULRIKSON)ORNL 1" ASLB NEVifARK/BLU!IE/AGBABIAN ~
1"AGMED RUTH GUSS'.IA'.c
. 1 "IIEWTON A!IDERSON ROOM B-127 G.T.
16"ACRS HOLDXNG 1"Je RUNKLES R?i-E-ZQ G.T.
0 k
r
O. IIOX 31M MIAMI,FLORIDA 33IOI
~i9!l(y
.t~
FLORIDA POWER EL LIGHT COIYIPANY
'I Pebr ary
~e Cy" OT eoC~)L .7;.'4975.'ffice of Management Information and Program Controls U. S'. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the January, 1975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours, A. D. Schmidt Vice President VTC:df Attachment
'CC Hr. Norman C. Moseley Jack R. Newman, Esquire pg Oyg~
1bUz HELPING EIUILO FLORIDA
~ S ENCLOSURE A DOCKET NO. 50-250
. UNIT NAME urke Point Unit No. 3 MK Januar 4 1975
'OMPLETED BY V. T. Chilson TELEPl IONE NO. 05 445-6211 Ext,. 2177 DAILY UNIT POiKR OUTPUT
~iVIH Januar 1975
'VHMGE DAILY l4fe-net DAY AVEBA(Z DAILY hf.'fe-net
66'1 '
20 687'93 672 21' 22 692
(
- 23. 692 702
683 2S . 698 7 679 26, 701
'90 27 '96'93 685 28 688 29 "689 690 30 685
'2 691 '687 631 609 NOTE: Daily average power level greater than 666 N~de, due 706 to cooler condenser cooling
. water.
699
'689
~ '18 693 414
E,
~ ~
I"'4I' i'7 lii
~4 r.".!'I: January lh 4 I 1,975.
'. Chilson J
~ bq ) ~ ~ WWh Ql', l'lt ~ALIA CO.'ll'l,l!'I'!ilk J3Y ~1.
TJiLLiI'I1()(ll ~30~5 44 5-6 2l Ext.
1 2177 OPERATING STA'I'US
- 1. REPOP;J'ING I'ERIOD: 0001 75 Ol Ol 'flIROUGII 2400 75 Ol 31 GROSS I !OURS Ii(J IKI7OJQ'lNG I'Jil(IOJ): 744. 0
- 2. f CURIKih J.Y AU'IIIORIZED PONER I.EZI. PiWt) 2200 hlimi!(. DEPEND. CAPACI'lY (hJI'(c NET) 666
- 3. P01fEJ( IZVHL TO li'I-IICJI RESTRICTED (II'NY) (hJI'i'e ?(%T) None REASONS FOR RESTRICTIONS (IF A%'):
THIS CUMULATIVE DT'S('Y/'A hiOVIH YR-TO-DATE TO DATE
- 5. hUII3ER Ol'OiJRS TJK IKACTOR 1'i'AS
'i CRI +AT 7
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 744. 0- 744.0
- 6. RWCTOR RESERVE SI.IUTDOhbi' IOUBS 7. 'OURS GLhlERATOR ON LIhlE .............;. 744.0 744.0 ~4~52. 5
- 8. 'iNIT P(ESERVE SII(fl'DO'i&l HOURS ........... 85. 0
- 9. GROSS TIIE1&NL ENERGY*Gf"(EBATED(hJIQI).... 1 590 161 1 590 161 24 270 185
- 10. GROS! 1:,LL'CTRICAL ENERGY GENERATED (hJI'i'll).............................'..... 527 898 527 898 7 955 703 JJ. ~ lYiDl Qhl'4J i(lldEL Ql(l l(Q l (7i i(l'i(t(li V gl ilillJ ~ ~ G3 41 DVd kL7 7 4 pep
- 12. RECTOR AVAILABILITYFAC.OR Ql......... 100. 0 100. 0 78.0
- 13. UNIT AVAI&SILIIYFACTOR g2........;... 100- 0 100. 0 74. 8
- 14. UNIT (APACI'IY I'ACTOR J3................ 101. 6+ 101. 6+ 60.9
- 15. UNIT FORCED OUTAGE BATE g4 4.0
- 16. SIVI'DO!'NS SCIIEDVLL'D OVER?(EXT 6 hJOKHS ('IYPE, DA'fE AND DUJKI'ION OF EACH):
February 24 March 2, 1975 Seismic Restraint Xnspection 17, IF Sl-PJTDO',8l AT END OF RLPORT PEIGOD, ESTIhKfJ!D DA'IT: OF STAlh'IlJP:
J1 Rl'ACI'OR AVAIL%BI I.I'l FACTOR '
= HOURS ,'
RI!A(",fOR NAS CRTTICAI. X 100 GROSS I!OURS ll(J JKVOI4'I'liili VERIOD 2 (lI" KVAIMBIIITY FACTOR Gl<OSS IIOUI'S 1N Rl;VOJ<'IL'Rl:OD h,l'."I':,I.L'."I'l<l;CAI.PVi'I'.lk ('ENI:IbVfED X 100 14!OX. 'IJJ:i>J:Nli.il:I',I; (':AI'A(:I'i'Y X (;IIOSS I JOIJRS IN .JUil!OR'II!RTOD N
I'OI((.'I!I) OIJl'AGI! 111JBS ( l00 IIXI'I'UTAGI"RATE (IliNll!UVJ'Olw (5 I I '(I,'
I IOIJBS ~
I'OBCI!I) OIJ'I'A(il I !01 JBS Note: Unit capacity factor greater than 100%, due to cooler condenser cooling water.
~
~ ~
) ~
Docket No 50-250 No. 3 unit operated entire LB)IT NAi~i.'.
TurksPoint Unit No. 3 month with no unit, outaigea. ~P~t-performance was satisfactory except DATE January~4 1975 for reduced load operation on January 1 1975 caused by failed bearing on No.. 3 PREPARED 3Y V. T. Chilson condensate pump motor. TELEPHONE 805) 445-6211 Ext. 2177 HHPQRI .'DNIH~
U N IT S H U T D ON N S / R E D U C T I0 N S TY'~E i<EH.K3D OF
.F-FORCED DURATION SHUTTING ID(N S-SCHEDULED (HOURS) REASON " 'IHE REACTOR '"* CO~PKXTS 01 75 01 19 N/A No. 3A condensate pump motor bearing failed. Unit power level reduced to capacity or one condensate until failed bearing was replaced. .(Non Nuclear system)
REASOiN: l KTHOD:
A E@>>ii1ENT FAILURE (EE~LAIg) l-bl.kVJAL 8-i41IilT. OR TEST 2-i~t~XUAL SCB k~f C-REFUELING 3-AUTO~NTIC SCRA~f D-REGULATORY RESTRICTION E-OPERATOR TRAINING ND LICENSE EXQlIKATION F-AD>iINISTPATDIE G-OPERATION% ERROR H-OTHER. (EXPLAIN)
lw
~4 4
Oe-
'1
.rf,,~ . w -4 'Pap P ~
ENCLOSURE A DOCKET NO. 50-251 UNIT NAh/E Turke point Unit No. 4 DATE Januar 4, 1975 COMPLETED BY V. T.'hilson TELEPHONE NO. 305 445-6211 Ext. 1 DAILY UNIT POWER OUTPUT hGNHC January, 1975 DAY AVFJNGE 'DAILY NÃe-net DAY AVEBAKi- DAILY M<'e-net 650 20 692 651 685 657 22 687
(
'574 24 .687 25 681 689 27 690, 28 686 10 311 631 676 680 NOTE: Daily average power level.
greater than 666 ML"e, due
.693 to cooler condenser cooling water.
706 17 18 j.9
0 lm ~ =" g I t
tpo ~ 4 i 4 oi o o4ao Q)~il'f.!i'I'ID anuar~I
~ o -
V. T. Chilson
~ ' 4 1
~ 'w oo.o J>Y
'I'EI,Ill'I'i0.'~!I 305 445-6211 Ext. 2177 OPERATING STATUS
- 1. RIIPORTING PBIUOD: Oll01 ~ 76 01 01 IIIROUG!I 2400 ~ 76 01 31 GROSS llOllRS IN RBPOll'i'l7G PL'RIOll: '744 ~ 0
- 2. =
CURRENTI,Y AUTIIORIZI'.D PONIIR I.FVEL (hfl<it)
AX. DEPJ.blD. CAPACI'IY (h5'(e iKT) 666
- 3. POI'lHR J.EVHL TO NIICH IeESTleICTED (IF ANY): (i%~'o NET) None
- 4. 'EASOiNS - FOR RESTRICTIONS (IF AI%'):
'IHIS CBi SLATIVL'O hK)iVJ'H YR-TO-DATE DATI!
4 hUIBER 01'-!OIJRS THE REACfOR biAS CR ITICAL o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ' ~ ~ 666.6 666.6 10 000,4
- 6. MA.CIOR RESERVE Sf IUTDO'Pi/. HOURS ......'.. 97. 3 97. 3 97~
7., HOURS GENIEIeATOR ON LINE ............... 646.7 646.7 9 704.5 8.'NIT IeESERVE SIUII)OIN IIOUJeS ........... GROSS TIIBlb%>L BNBRGY GQNBHATBDPilli'll).... 1 382 019 1 382 019 19 734 229
- 10. GROSS ELEC'I'RICAL EINERGY GEiNERATED 450 252 450 252 224 513 (I Pili I) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 J.I ~ 'WCT HLE'4ALClGLL EINERLYL GEi'o~iI~LPLTEV.. il"IIIil ) ..., .. 427 263. 427. 763 5. 896 879.-
- 12. RBACIOR AYAILABILITYI'ACTOR +1......... 89 ~ 6 89. 6 81. 4
- 13. UNIT .AVAILABILIJYI'ACTOR g2 86.9 86.9 73. 8 UNIT CAPACI'IY FACTOR ~3 ,.....,...;..... 86. 3 86'. 3 UNIT FORCED OUTAGE IeATE g4 ............. SllfmIO,)NS SCIKDULED OVER h%Yf 6 hiON'IIS (TYPE, DATE AND DURATION OF EACf1):
o March 24 May 18, 1975 Refueling, Maintenance and inspections
- 17. IF SI.IIJTD018 AT END OF REPORTPERIOD, ESTIhfATED DATE OF S'I'AR1VP:
I.IOUPS Iel'ACTOR INS CRITlCAI. X 100 RJM'OR AVAIJJBILITY FACTOI<
GleOSS HQUIeS JN leL'I'OleTJNG I'HleIOD 110URS ('I'.9!IeATOle OX I.INE X 100 2 UNIT AVAIDIIIJI'JY FACI'OR YGIiOSS I IOtJRS lib IJ I'Ole'I'L'RIOD UNJJ CAIACIIY Y I;AClole F CI,OIe =-
hfdf."I,l.l CJ'l'JCAI. I'OhTle Gf:,Mf feA'I'I:I) Y 100 JIl,u '1)l.l I:i~L)AI3l I, (AIA(;jIY
'X Gleoss IIOURS IN IeEI'Ole'f PERlOD
'>>'"I OIKL'I) '0 I I A(il I IOIIliS X 1 00 II()tJI'4 C.'I:9:lbVI()" 0'i I. INIII +
I:Olk(:Iif) OBl'A(lH I IOIJRS
'ol o 9 II o 'o " ot a I o'ooo o , 'c t o Qs o
Docket No. 50-251 Unit No. 4 was out or servic for scheduled maintenance on secondary system. After unit returned to servic on January--.9, 1975, unit performance has been satisfactory.
IICIE,~
UNIT NA~E.
PREPARED BY Turkey Point Unit No.
9 V. T. Chilson 4 ~.
YHLHPI10KI REPORT M3iVII January 1975'NIT SHUTDONNS/REDUCTIONS T i'E F-FORCED DURATIOV
"'iEMJD Ol SHL tTING DOWil t
S-SCHEDULED (HOURS) REASON 'QK REACTOR COMIEVTS Ol 75 01 05 97.3 B N/A Unit was removed from service to perform scheduled maintenance including: repair turbine exhaust expansion joint leak; locate and repair hydrogen. leaks on electric generator; and repair misc. steam leaks. (Non Nuclear system)
REASOiV: <~K'IHOD:
A EJUIPihIEMI'AILURE '(EXPLADQ 3.-i~IXVJAL B-N.IXV. OR TEST 2-iiNXKQ. SCRBf C-REFUELING 5-AUTO>uTIC SCRVI D-REGULATORY RESTRICTION
'E-OPERATOR TRAINING AVD LICEiVSE EX<MINATIONV F-AD~JINISTRATlVE G-OPERATIONAL ERROR H-OTHER (EXPLAIN)
w4