Forwards Schedule for Major Milestones Required to Restart Facility
ML18033B237
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/28/1990
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004060197
Download: ML18033B237 (8)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004060197 DOC.DATE: 90/03/28 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION WALLACE,E.G. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards schedule for major milestones required to restart facility.

D DISTRIBUTION CODE: D030D TITLE: TVA Facilities COPIES RECEIVED:LTR Routine Correspondence l ENCL

$ SIZE:

S NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, 05000260 R..Pierson,B.Wilson RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D LA 1 1 PD 1 1 ROSS,T. 1 1 D INTERNAL: ACRS 1 1 NUDOCS-ABSTRACT 1 1 OC/LF 1 0 OGC/HDS2 1 0 R ILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 5 5 R

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 14

wl tTENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 t

5N 157B Lookout Place MAR 28 880 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Nashington, D.C. 20555 Gentlemen:

In the Matter of Docket No. 50-260 Tennessee Valley Authority BRONNS FERRY NUCLEAR PLANT (BFN) PROJECT MILESTONES The enclosure to this letter provides the schedule for the major milestones required for Unit 2 restart. This information is being provided to the staff to assist in the planning and scheduling of the resources required to support these milestones.

There are no commitments contained in this letter. If you have any questions, please telephone Patrick P. Carier, Manager of Site Licensing, at (205) 729-3566.

Very truly yours, TENNESSEE VALLEY AUTHORITY E. G. Ha lace, tianager Nuclear Licensing and Regulatory Affairs Enclosure cc: See page 2 ti@0 90P4,0g 0) 9 AOOCy, 90o~2S "0<<260 pg An Equai Opportunity Employer

lt l U.S. Nuclear Regulatory Commission MAR 28 1ggP cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie,=Maryland 20852 Mr. B. A. Wilson, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, G'eorgia 30323 NRC'Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000

C l

pa

~ ENCLOSURE MAJOR MILESTONES REQUIRED FOR UNIT 2 RESTART MILESTONE SCHEDULE 10 CFR 50, Appendix R 3/26/90 Environmental Qualification 5/15/90 Bulk Hork 6/01/90 Reload Core 7/12/90 Integrated Leak Rate Test 8/07/90 Hydrostatic Testing 8/10/90 Pull Rods 9/01/90 Close Generator Breaker 9/20/90

0 4 ~

V