Monthly Operating Rept for DC Cook Nuclear Plant Unit 2 for Oct 1988.W/881107 Ltr
ML17325B092
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1988
From: Giles H, Harner J, Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8901180249
Download: ML17325B092 (7)


Text

Ac CKMRATED D1 BUTION DEMONS TION SYFI'KM REGULATO. INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8901180249 DOC.DATE: 88/10/31 NOTARIZED: NO DOCKET FACIL':50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana S 05000316 AUTH. NAME AUTHOR AFFILIATION HARNER,J.W. Indiana Michigan Power Co. (formerly Indiana a Michigan Ele GILES,H. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele SMITHiW.G. Indiana Michigan Power Co. (formerly Indiana S Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1988.W/881107 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ( ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: S COPIES RECIPIENT COPIES 'E ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 0 PD3-1 PD 5 5 h STANGiJ 1 0 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 D NRR/DOEA/EAB 11 1 1 NRR/DgglP PB 10 1 1 NUDOCS-ABSTRACT 1 1 EG FILE 01 1 1 S RGN3 1 1 EGSG SIMPSON,F 1 1 EGSrG WILLIAMS,S 1 1 'X LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I NOTE LO ALL "RIDS" KKIPZERIS'LEASE HELP US 'lO REDUCE HASTE! CGNZACT THE DOCUMENZ CGNZROL DESK, RXN Pl-37 (EXT. 20079) TO ELBhIMXE KRlR MME PKH DISTRIBVZICjN LISTS H)R DOVMENZS YOU DONiT NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

c,Od Nd G>:CO 88 'Sc '1 i N~ R.C. OPERATING DATA REPORT DOCKET NO. '0-316 DATE 0'i-NOV-88 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATXNG STATUS

1. Unit Name D. C. Cook Unit 2
2. Reporting Period OCT 88 ~

not.es

3. Licensed Thermal Power (MWt) 34 1.1
4. Name Plate Rating '(Gross MWe) '1133
5. Design Electrical Rating (Net MWe) 1100 I
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur Last Report Give Reasons in Capacity Ratings (Items no. 3 through 7) Since
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any Any:

{Net MWe)

This Mo. Yr, to Date Cumm.

ll. Hours in Reporting Period

12. No. of Hrs. Reactor Was Critical 745.0 0.0 7320 ' 94968.0 63595.1

2715.5

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 2715. 1 62210.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l.
18. Net El . 'at
16. Gross Therm. Energy Gen. (MWH)

Elect. F~ergy Qen. (MWH)

. ( I 0

0 0

7410980 2419600 2323265 189566377 61896220 59584665

19. Unit Service Factor 0.0 37.1 67.2
20. Unit Availability Factor 0.0 37.1 67.2
21. Unit Capacity Factor (K)C Net) 0.0 29.9 60.7
22. Unit Capacity Factor (DER Net) 0.0 28.9 59.2
23. Unit Forced Outage Rate O>0 0.0 14.5
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
25. IfFebruar Shut Down 1989 At End of Report Period, Estimated Date of Startup-
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRETICALXTY INXTIAL ELECTRICITY COMMERCIAL OPERATION 901180++9 8810 PDR *DOCH, 0500031'E R

PNUg

'd 8LJ.8900908 'ON / LMV'Id EV3'10Ail F003 i<OH3

COd Nd 00:CO 88 '8Z 'll H

AVERAGE DAILY POWER LEVEL (Kfe-Net) 50-316 DOCKET NO.

UNIT DATE

'WO 01-NOV-88 CONPLRTED 3Y H. Giles TELEPHONE 616-465"6901 MONTH OCT 88 AVERAGE DAXLY AVEBAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0. 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

'd BLLZ90090B 'ON / t t:9f 88,88't I (NON) LAY'l2 EY3't0AN IIOOv iFv"..-'

I' WVd Nd Ol: CO 88 'SZ s'

DOCKET NO: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: J. W. Harner TELEPHONE; (616) 465-5901 DATE: Nov. 7, 1988 PAGE: 1of 1 MONTHLY OPERATING ACTIVITIES - OCTOBER 1988 HI GHL IGHTS The steam generator repair project continues to proceed with the new steam generators in place. Hydrostatic testing of the steam generator secondary sides is in progress,

'd 'BlL8900908 'ON B0:Gt 88,88'I t(NOW)

Nd 00:CO 88 '8Z

~ ~

'i 1 DOCKET NO. 50-316 UNIT NAME ~o.c. ook-Unit No. 2 DATE ovember 7, 198 COMPLETED BY J. M. Harner TELEPHONE 16 465-5901 PAGE 1 o 1

<AFETY-RELATED MAINTENANCE OCTOBER 1988 There were no major safety- ated maintenance items during the month of October, 1988.

': :"1.L8900908 'ON / 3NYld EY3'IMN 2003 NOH'

i'rd <<1r':co 88 'aa 'rr InrIIana MIchigan Power Company Cook NucIear Piant P.O. Sox 458 Sridgman. Ml 49106

'164655901 lNDltlN4 IINCHlOi4N PWKR U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mashington, D,C. 20555 November', 1988 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9. 1. 10, the attached Monthly Operating Report for the month of October 1988 is submitted.

Sincerely, I,O W. G. SmA:,

Plant Manager

. WGS/jd cc: D. H. Williams, Jr.

N. P. Alexich C. A. Erikson J. J. Markowsky D. A. Timberlake R, F. Kroeger B. L. Jorgensen M. J. Parvin J. R. Sampson E, A. Smarrella Dolly Krieger T, R. Stephens

0. S, Climer R. C. Callen D. N. Paul D. R. Hahn S. L. Hall INPO Records Center ANI Nuclear Engineering Department NRC Region III EPRI Nuclear Safety Analysis Center

'8 FLLc900908 'ON i tt:9t 88,88'I t(ZO>Ij