ML17325A975

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1988 for DC Cook Unit 2. W/881007 Ltr
ML17325A975
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/30/1988
From: Giles H, Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810260172
Download: ML17325A975 (8)


Text

REGULA Y INFORMATION DISTRIBUTI~YSTEM (RIDS)

ACCESSION NBR: 8810260172 DOC. DATE: 88/09/30 NOTARIZED: NO DOCKET 0 FACIL: 50-316 Donald C. Cook Nuclear Poeer AUTHOR AFFILIATION P lant'nit 2i Indiana & 05000316 AUTH. NAME GILES'. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele SMITHS'. G. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele REC IP. NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 19'88 for DC Cook Unit 2.

M/881007 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES REC IP I ENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 0 PD3-1 PD 5 5 SCOTT' 1 0 INTERNAL."AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPG/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 EP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 EG FI 01 1 1 RGN3 1 1 EXTERNAL: EG&G SIMPSON' 1 1 EG&G WILLIAMS' 1 1 LPDR 1 1 'RC PDR 1 1 NSIC 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

'I f

4 Bl 1E 1

I

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 04-Oct-88 COMPLETED BY H. Giles TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2
2. Reporting Period SEPT 1 988 I notes
3. Licensed Thermal Power (MWt) 341 1
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1100
6. Maximum Dependable Capaci.ty (GROSS MWe) 1100
7. Maximum Dependable Capaci.ty (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no.

Last Report Give Reasons 3 through 7) Since

9. Power Level To Whi.ch Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any-This Mo. Yr. to Date Cumm.
11. Hours in Reporting Period 720.0 6575.0 94223.0
12. No. of Hrs. Reactor Was Critical 0.0 2715.5 63595.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 2715.1 62210.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 0 7410980 189566377
17. Gross Elect. Energy Gen. (MWH) 0 2419600 61896220
18. Net Elect. Energy Gen. (MWH) 0 2323265 59584665
19. Unit Service Factor 0.0 41.3 67.7
20. Unit Availability Factor 0.0 41.3 67.7 61.2
21. Unit Capaci.ty Factor (MDC Net) 0.0 33.3
22. Unit Capaci.ty Factor (DER Net) 0.0 32. 1 59.7
23. Unit Forced Outage Rate ERR 0.0 14.5
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration)-
25. IfFebruar Shut Down At End 1989 of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation)-

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMNGKIAL OPERATION SSi0260i72 SS0930 05000316 POR ADOCK R

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE ,04-Oct-88 COMPLETED RY H. G3.les TELEPHONE 616-465-5901 MONTH SEPT 1988 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 17 0 2 18 0 3 19 0 4 20 0 5 21 0 6 22 0 7 23 0 8 24 0 9 25 0 10 26 0 11 27 0 12 28 0 13 29 0 14 30 0 15 16

UNIT SllllTI)OWNS ANlltl)WIikRKI)llC1'IONS

.. BLa16

~ ~

UNITNAIIh 0 2 l)ATE c .

COIIPISrel IiV Hat ner HFJORT le% AI I.kcnsce l'ause 4 C<<nccllvc lblc live<<i Aclluil lii Rcpiul 4 Picrcnl kcciulciux cont'80423 189 720 $ 5C N/A ZZ ZZZZZZ The unit was removed from service

) on 880423 for cycle 6-7. Refueling and steam generator repair pr'oject.

The reactor core is currently unloaded. The expected date for return to service is February 1989.

I I': I'<<ic:ii Rcasiinl II>>lbod: I:.abibll Ii - lusliucliixis S: Sciieiiiiicil A-Equipuicnl I'aiiuic {Eaphln) I Ilanual fillPic(lalaluiu I'l')ala ll.IIabilenaac>> <<i Teal 2 IIanual %saul. I nliy hhccls fin IAccnsce I'.Refueling 3 Aubiulalk Sera<<i. Iivcnl Rciuiil II.I:RlI'iic INllRI'.G.

I)Reaiilanuy Rcsllkiiuil 44)ll es Ilixplatu) 0)6l)

I:Qiciatw Tlainingk Ijccusc I xanlblalbiu I'.Adnlinlsliakrc 4 Iilieiali<<nal I4iiu II!xplabl) 4 xiubil I Su>v Su<<i<<

ll/0) II Utbel Ilixpbbil

~ ~

t

DOCKET NO: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: J. W. Harner TELEPHONE: (616) 465-5901 DATE: October 10, 1988 PAGE: lof1 MONTHLY OPERATING ACTIVITIES - SEPTEMBER 1988 HIGHLIGHTS The unit remained in Mode 6 with the reactor core unloaded throughout the reporting period. The Steam Generator Repair Project continues to proceed.

Gross electrical generation for the month of September was 0 MWH.

An unusual event was declared on 9-22-88 due to a fire in a plastics factory.

DETAILS There were no significant operating events during the month.

09-22-88 An unusual event was declared at 0407 hrs. due to a fire in a plastics factory in the local community of Stevensville. The unit exited the unusual event at 0740 hrs. after it was determined no hazardous gases existed.

indiana Michigan Power Company ~

Cook Nuclear Plan~

P.O. Box 458 Bridgman, Ml 49106 6i6 465 5901 INDMNA MICHIGAN POlNKR U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 October 7, 1988 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9. 1.10, the attached Monthly Operating Report for the month of September 1988 is submitted.

Sincerely, c.<

W. G.

~~ ~

Smith, Jr.

Plant Manager WGS/jd cc: D. H. Williams, Jr.

M. P. Alexich C. A. Erikson J. J. Markowsky D. A. Timberlake R. F. Kroeger B. L. Jorgensen M. J. Parvin J. R. Sampson E. A. Smarrella Dolly Krieger T. R. Stephens D. S. Climer R. C. Callen D. W. Paul D. R. Hahn S. L. Hall INPO Records Center ANI Nuclear Engineering Department NRC Region III EPRI Nuclear Safety Analysis Center