L-98-129, Submits Response to Request for Addl Info Re GL 96-06, Containment Air Recirculation Coolers

From kanterella
(Redirected from L-98-129)
Jump to navigation Jump to search
Submits Response to Request for Addl Info Re GL 96-06, Containment Air Recirculation Coolers
ML20236L394
Person / Time
Site: Beaver Valley
Issue date: 06/30/1998
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-06, GL-96-6, L-98-129, NUDOCS 9807100337
Download: ML20236L394 (2)


Text

s e' Beave Valley Pow,r Station Shippingport. PA 15077-0004 SUSHIL C. JAIN (412)393-5512 Fax (724) 643 8069 S*"f,'ff,'i;*,*,"'*"' June 30,1998 nucien eo.er civi.>on L-98-129 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 EV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Response to Request for Additional Information Generic Letter 96-06 Containment Air Recirculation Coolers Attached is our response to an NRC request for additional information (RAI) dated March 20,1998, concerning the measures that exist or that have been taken to assure that the containment air recirculation coolers will not be used as an option to mitigate accident conditions.

The RAI coacems our response to Generic Letter 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions." Our response to the generic letter, dated January 28,1997, indicated that the containment air recirculation coolers are not required for accident midgation and are not called upon by the Emergency Operating Procedures (EOPs). Ho iver, during accident conditions, plant operators may elect to take actions that are not specifically called for in the EOPs.

The Loss of Coolant Accident (LOCA) and Main Steam Line Break (MSLB) accidents ,

are the events identified in Generic Letter 96-06 that could lead to overpressurizing the y cooling water piping serving this system as a result of water hammer or two-phase flow <

conditions from the high containment temperatures. Therefore, the NRC has requested that containment we air identify those recirculation coolersmeasures will not be used as that exist an option or that to mitigate have a LOCA or been ta -

MSLB.

l The EOPs will be revised to assure that the containment air recirculation coolers are not used to mitigate the consequences of a LOCA or MSLB accident. In addition, Ottivi m

~

9807100337 980630 PDR ADOCK 05000334' P PDR

Beaver Vclley Power Station, Unit No. I and No. 2 Response to Request for Additional Information Generic Letter 96-06 Containment Air Recirculation Coolers Page 2 .

following EOP revision and prior to being issued for use, simulator and classroom training will be provided to licensed personnel.

Sincerely,

&s20W Sushil C. Jain c: Mr D. S. Brinkman, Sr. Project Manager Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region 1 Administrator i